1.

In order to be attuned with the present times,the Prefessional Regulatory Board of Architecture adopted aand promulgated an amended Architect's Credo which became effective on June 21,2018 under Resolution No.__ Series of 2018 as endorsed by the UAP.

a)

2

b)

3

c)

4

d)

5

2.

The amended version of the Architect's Credo was endorsed by the United Architects of the Phil. to PRBOA through NBD Board Resolution No. __Series of 2017-2018.

a)

97

b)

98

c)

99

d)

100

3.

The new Architect's Credo was signed on ____

a)

June 4, 2018

b)

June 5, 2018

c)

June 6, 2018

d)

June 21, 2018

4.

What is not mentioned in the Architect's Credo?

a)

Clients

b)

Colleagues

c)

Industry partners

d)

Government

5.

How do you compensate a "project-hired" painter?

a)

Per hour

b)

Per day

c)

Per square meter

d)

Lump sum/ Fixed fee

6.

How do you pay a painting subcontractor?

a)

Per hour

b)

Per day

c)

Per square meter

d)

Lump sum/Fixed fee

7.

If you apply for business permit,where should you go?

a)

SEC

b)

DTI

c)

CITY HALL

d)

BIR

8.

The Alternative Dispute Resolution Act of 2004

a)

R.A 9255

b)

R.A 9285

c)

R.A 8295

d)

R.A 9858

9.

If you purchased 1 million worth of furniture and equipment for the new office that you set up,how much did you pay for the VAT?

a)

300,000

b)

120,000

c)

107,142.86

d)

267,857.14

10.

The Architect's RPF for a Residential Project.(DADS).

a)

4.2%

b)

6%

c)

7.5%

d)

6.6%

11.

Common method of compensation which is also fair to both the client and architect.

a)

% of PCC

b)

MDPE

c)

PFPE

d)

Lump sum

12.

A client wanted your detailed architectural design services for this new house with a Total Project Cost of Php 3,000,000.

a)

10%

b)

6%

c)

5%

d)

7%

13.

You found out that your previous client used your design for another project without your consent.what will you do?

a)

Inform the Brgy.Captain

b)

Inform the Mayor

c)

File case with the PRC

d)

File case with the IPOPHL

14.

Preliminary drawings done by Architect.

a)

Preliminary sketches

b)

Schematic diagrams

c)

Conceptual drawing

d)

Working drawing

15.

3rd phase for regular design services.

a)

Regular design phase

b)

Schematic design phase

c)

Design development phase

d)

Contract document phase

16.

Which does not fall under Specialized Architectural Services?

a)

Architectural programming

b)

Architectural interior

c)

Acoustic design services

d)

Architectural lighting layout

17.

Which does not fall under Pre-Design Services

a)

Site selection and analysis

b)

Site and physical planning services

c)

Site utilization and land use

d)

Promotional services

18.

What is covered by Comprehensive Architectural Services?

a)

SPP DOC. 201-203

b)

SPP DOC. 202-206

c)

SPP DOC. 201-205

d)

SPP DOC. 201-209

19.

A "business" Architect deals with?

a)

Architectural design

b)

Design-build

c)

Consultation

d)

Professional Services

20.

Who approves the PERT-CPM chart?

a)

Owner

b)

Architect

c)

Contractor

d)

Project Engineer

21.

Which is not duty of a Construction Manager?

a)

Project coordination and supervision

b)

Preparation of As-built plans

c)

Cost and time control

d)

Keeping of records

22.

When was RA 9266 approved and signed into law?

a)

Sept. 15, 2004

b)

Jan. 29, 2004

c)

March 17, 2004

d)

July 28, 2004

23.

When was the IRR of RA 9266 approved?

a)

Sept. 15, 2004

b)

Jan. 29, 2004

c)

March 17, 2004

d)

July 28, 2004

24.

Specifications contain

a)

Bill of materials

b)

Responsibility of clients

c)

Quality of materials

d)

Other conditions of services

25.

Analysis of the space requirements of the project.

a)

Space planning

b)

Space management studies

c)

Architectural planning

d)

Architectural programming