CONSTRUCTION MANAGEMENT DLS-CSB

Total questions: 25

Worksheet time: 19mins

Name
Class
Date
1.

The one responsible for planning, coordinating, budgeting and

supervising projects from the beginning to the end.

a)

Construction

Architect

b)

Construction

Supervisor

c)

General

Contractor

d)

Construction Project Manager

2.

They are chosen through a bidding process by the client and are

involved during construction and in the daily direction and operation

of projects.

a)

Project

Architect

b)

Construction

Project

Manager

c)

General

Contractor

d)

Project

Stakeholder

3.

Defined as the direction, regulation, and

supervision of a project from early development

to completion.

a)

Project

Management

b)

Building

Administration

c)

Construction

Project

Management

d)

Design & Construction

Mamagement

4.

THE OWNER CONTRACTS DESIGNERS AND BUILDERS SEPARATELY.

THE DESIGN FIRM DELIVERS 100% COMPLETE DESIGN DOCUMENTS.

THEN THE OWNER SOLICITS BIDS FROM CONTRACTORS TO

PERFORM THE DOCUMENTED SCOPE OF WORK.

a)

Design-Build

b)

Bidding

Process

c)

Design-Bid-

Built

d)

Construction

Administration

5.

A document that details the exact work to

be performed on a project. Typically the

work order will have a description of the

work and line items for time and

material

a)

Change

Order

b)

Work

Order

c)

Working

Drawings

d)

Bill of

Materials

6.

The _________ is in charge of workers at the

construction site. They oversee the project, track the

completion of tasks, deal with payroll, and manage

the time spent by each individual worker on the site.

a)

Project

Manager

b)

Contractor

c)

Foreman

d)

Construction

Supervisor

7.

These are the busy bees that hammer the nails, pour

the concrete, and operate the large machinery that

brings the project to life.

a)

Consultants

b)

Project

Manager

c)

Engineers

d)

Construction

Workers

8.

The project ___________ stage requires complete diligence as it lays out the project’s ROADMAP.

a)

The Pre-

Construction

Phase

b)

Project

Initiation

c)

Project

Planning

stage

d)

The Construction

Phase

9.

The ________ phase is one of the most IMPORTANT aspects of

construction project management

a)

Construction

Phase

b)

Procurement

Phase

c)

Close-out

Phase

d)

Initiation

Phase

10.

During this phase, the project team ORDERS, purchases or rents all the

materials, tools, and services necessary to complete the project.

a)

Initiation

Phase

b)

Work Order

Phase

c)

Procurement

Phase

d)

Purchasing

Phase

11.

This is the FINAL phase of the project management process.

a)

Turn-Over

Phase

b)

Project

Closing

Phase

c)

Post-Construction

Phase

d)

Project

End Phase

12.

Most project managers are under enormous pressure to

complete the project on TIME.

a)

TRUE

b)

FALSE

13.

As a project manager, you can afford to make the

same MISTAKE twice.

a)

TRUE

b)

FALSE

14.

the system for planning and controlling to ensure the right quality and quantity of

materials are specified in a timely manner and at the lowest possible cost through all construction phases.

a)

Construction

Project

Management

b)

Purchasing

Management

c)

Construction

Work Order

Management

d)

Construction

Material

Management

15.

Time, cost, material and _____ are the four major

types of planning undertaken on sites.

a)

Equipment

b)

Resource

c)

Labour

d)

Machines

16.

The _______ should be revised as frequently as

possible in order to monitor whether work is

progressing as planned.

a)

Schedules

b)

Planning

c)

Cost

d)

Project

Targets

17.

The ________ shall have rights to reject faulty material and have it removed from site. With respect to manufactured goods, the quality requirements should be specified in the purchase order.

a)

Foreman

b)

Owner

c)

Contractor

d)

Inspector

18.

Reinforcing bars should be stacked yards away from moisture to

prevent rusting and also away from oil and lubricants. Bars of different

classification, sizes and lengths should be stored all together to facilitate

issues.

a)

TRUE

b)

FALSE

19.

The sum of the value of raw materials, fuel and lubricants, spare

parts, maintenance consumables at any given point of time.

a)

Material

Inventory

b)

Inventory

Control

c)

Material

Contro;

d)

Material

Work Order

20.

Materials like ________ should must be stored in covered sheds and

stacked on timber raised platforms.

a)

Reinforcement

Bars

b)

Concrete

Hollow

Block

c)

Cement

d)

Sand

21.

the process of maintaining a project’s

inventory, equipment/tools, manpower & budget/ resources.

a)

Project

Management

b)

Machine

and Equipment

Management

c)

Project

Maintenance

Inventory

d)

Maintenance

Management

22.

Task and schedules are shared by operators

and team leaders.

a)

Autonomous

Maintenance

b)

Machine

Improvement

c)

Preventive

Maintenance

d)

Maintenance

Management

23.

a software that is used to schedule and record operation and

planned/unplanned maintenance associated with equipment on-site.

a)

Computerized Maintenance Management System

b)

Computerized Management System

c)

Maintenance Management System

d)

Computerized Maintenance System

24.

a document that outlines the details of a specific

project.

a)

Purchased

Order

b)

Project

Work

Schedule

c)

Work

Order

d)

PERT-CPM

25.

The purpose of a construction work order

is for the owner and the customer, to

agree on the details of a project.

a)

TRUE

b)

FALSE