NEW
Font size
WorksheetsPre assessment (week 4)
Total questions: 10
Worksheet time: 5mins
Which of the following project needs a plan? Put a CHECK (✓) before the number if it requires a project plan and CROSS (X) if doesn’t require the plan. Building a house
/
X
Cutting a plain sheet
/
X
Constructing a table
/
X
Making Dustpan
/
X
Making artwork
/
X
Write Yes in your answer sheet if the following situation is essential in the preparation a project plan and No if not. The amount to be used in the preparation of the project should be given consideration.
Yes
No
Prepare workable and attainable target.
Yes
No
The kind and quality of materials need to be check before the start of a project.
Yes
No
The bill of materials contains the unit, quantity and procedure in the preparation of the project
Yes
No
A project plan is needed only in project costing ten thousand pesos or more.
Yes
No