wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Quiz

Total questions: 15

Worksheet time: 5mins

Name
Class
Date
1.

The following is the ways to characterize projects except.

a)

Size

b)

cost

c)

Market

d)

Purpose

2.

What is PPM mean?

a)

Project Portfolio Management

b)

Personal Problem Management

c)

PackawPingMarcos

d)

Project Problem Management

3.

Practices include requirements discovery and solutions improvement through the collaborative effort of self-org

a)

throwaway prototyping methodologies assessment

b)

Systematic prototyping methodologies

c)

Agile prototyping methodologies assessment

d)

Project software development

4.

a small part of the system is developed and then given to the end-user to try out and evaluate.

a)

throwaway prototyping methodologies assessment

b)

Systematic prototyping methodologies

c)

Agile prototyping methodologies assessment

d)

Project software development

5.

Prototyping is the process of building a model of a system

a)

Throwaway prototyping methodologies assessment

b)

Systematic prototyping methodologies assessment

c)

Agile prototyping methodologies assessment

d)

Project software development

6.

A Methodology that emphasis on deliverable from one phase flowing into the next phase.

a)

Waterfall Methodology

b)

Parallel Methodology

c)

V-model

d)

None of the Above

7.

A methodology that Subdivides the project into sub-projects that can be worked on at the same time.

a)

Waterfall Methodology

b)

Parallel Methodology

c)

V-model

d)

None of the Above

8.

A methodology that has a V shape and validate each phases.

a)

Waterfall Methodology

b)

Parallel Methodology

c)

V-model

d)

None of the Above

9.

An individual learns to create successful programs and applications

a)

Project Manager

b)

Industry Standards

c)

Experienced Developers

d)

Project Developer

10.

The process of assigning projected values for time and effort

a)

Project Manager

b)

Experienced Developers

c)

Industry Standards

d)

Project Estimation

11.

Responsible for planning, organizing, and directing the completion of specific projects for an organization

a)

Project Manager

b)

Manager

c)

Members

d)

Assistant

12.

How to establish operating procedures?

a)

availability, status reporting, meetings

b)

I miss you, balik ka na, sorry na

c)

time, team, management

d)

scope, time box, assuring group performance

13.

What is time boxing?

a)

reveal that the project requires more time than we have available

b)

time inside box

c)

ensure that team members get to know each other

d)

kumain ka na ba?

14.

how to perform as a group?

a)

unity team

b)

to determine the correct schedule adjustment

c)

unite with the same vision and motivated to bring that vision to life.

d)

defer additional requirements as a future system

15.

Galing nyo po

a)

I miss you

b)

Balik kana

c)

Sorry na

d)

huhuhu