wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

The Big Quiz Level 3 8202-35 Plumbing

Total questions: 33

Worksheet time: 23mins

Name
Class
Date
1.

Why when installing a Hot Water Cylinder would you ensure the plywood board the HWC is mounted on has a hole in the centre?

a)

To ensure expansion of the plywood

b)

To stop the plywood from warping

c)

To ensure any condensation on the underside of the cylinder can escape

d)

To enable inspection of the underside of the cylinder with an inspection camera

2.

Why is it imperative to ensure the F&E Cylinder is positioned lower than the Cold Water Storage Cistern?

a)

To ensure there is not one pipe circulation

b)

To ensure contaminated water cannot pass from Primary to Secondary

c)

To ensure the F&E cylinder never vents into the cistern

d)

To ensure the CWSC is bigger than the F&E

3.

What is shown in the image?

a)

Gas Fired Water Cylinder

b)

Unvented Cylinder

c)

Domestic How Water Cylinder

d)

Mains Water Booster Cylinder

4.

If a kitchen sink macerator stops working what do you need to do to get it operational?

a)

Isolate the mains Supply, Unblock the grinder chamber

Reconnect supply

b)

Isolate the mains Supply, Unblock the grinder chamber with the supplied key

Reconnect supply

c)

Isolate the mains Supply, Unblock the grinder chamber with the supplied key

Reconnect supply

Press the rest button

d)

Isolate the mains Supply, Unblock the grinder chamber with the supplied key

Press the reset button

Reconnect supply

5.

When did the Private Water Supplies Regulations come into force?

a)

2008

b)

2009

c)

2014

d)

2021

6.

Draw the symbol for a Single Check Valve.

7.

What is the risk in a Fluid Category 4 liquid?

a)

No risk to health

b)

Slight risk to health

c)

Moderate risk to health

d)

Significant risk to health

8.

What is shown in the image?

a)

Air conditioning unit

b)

Air Source Heat Pump

c)

Ground Source Heat Pump

9.

What is the minimum recommended dimension in front of a toilet in mm?

(a)  

10.

What is shown in the image?

a)

Macerator

b)

Booster Pump

c)

Sump control Unit

d)

Solar System Circulating Unit

11.

What is the name given to the Cylinder shown?

(a)  

12.

Which fluid category does an DB pipe interrupter prevent?

a)

Fluid category 1

b)

Fluid category 2

c)

Fluid category 3

d)

Fluid category 4

13.

Condensing boilers are specifically designed to

a)

Provide instant hot water

b)

extract less heat from the flue gases

c)

extract more heat from the flue gases

d)

Provide hot water at higher than normal tempretures

14.

A centralised Central Heating System is defined as

a)

A system where the heat source is specifically located in the T Zone

b)

A System where the heat source is diagonally opposite the Heat Emitters

c)

A System where a heat source in located always above the Heat Emitters

d)

A System where a heat source is located centrally to the Heat Emitters

15.

What is shown in the image?

a)

Zoning Valve

b)

Tundish

c)

Pressure Reducing Valve

16.

What is shown in the highlighted circle?

a)

Shock Arrestor

b)

Blending Valve

c)

PTZ Zone Valve

d)

Over Flow Valve

17.

A solenoid valve is triggered by the operation of an infra-red sensor.

a)

True

b)

False

18.

What is shown in the image?

a)

Isolation Valve

b)

Pre-filter inline valve

c)

Flow Limiting Valve

d)

Push Fit Regulation Valve

19.

What is shown in the photo?

a)

Single Impeller Shower Pump

b)

Sump Pump

c)

Heating Circulator Pump

d)

Twin Impeller Pump

20.

A Direct System receives its supply from?

a)

Cold Tank

b)

Is direct to outlet

c)

Is direct to supply inlet

d)

All three answers are correct

21.

The purpose of the Water Supply (Water Fittings) Regulations 1999 is to prevent any of the following from happening to the water supply:

Mark all that are correct.

a)

undue consumption

b)

waste

c)

misuse

d)

contamination

e)

erroneous measure

22.

Fluid risk categories... What is CAT 2?

a)

Aesthetic quality impaired

b)

Slight health hazard

c)

Significant health hazard

d)

Serious health hazard

23.

What is the name of the approved Approved Contractors scheme

a)

Water Industry Approved Plumbers’ Scheme

b)

Water Industry Approved Plumbers’ Programme

c)

Water Undertakers Approved Plumbers’ Scheme

d)

Water Industry Accedited Plumbers’ Scheme

24.

Which schedule supports Regulation 4(3). Requirements for water fittings:

•there are  31 separate requirements

•covers all aspects of water fittings

•deals with the practical aspects of Part II Regulations.

a)

1

b)

2

c)

3

d)

4

25.

Any water supply that is not provided by a water undertaker and is not connected to any part of the water mains network is entitled

a)

Owner Occupier Supply

b)

Private Water Supply

c)

Public Water Supply

d)

Undertaker Water Supply

26.

Name the British Standard which is linked to the Water Regulations.

a)

BS EN 806

b)

BS 6700

c)

BS 1212 Part 2

d)

BS EN 709

27.

Type AUK2 Air Gap is found where?

a)

Interposed cistern

b)

Toilet

c)

Medical type premises

d)

Tap gap for domestic premises

28.

Drinking Water fountains should be designed so that the outlet of the water delivery jet nozzle is at least _____ mm above the spill over level of the bowl.

a)

25

b)

50

c)

150

d)

200

29.

When installing an outside tap is it correct to install the Servicing Valve before the Double Check Valve?

a)

True

b)

False

30.

Fluid Category 5 is fluid representing a serious health hazard because of the concentration of pathogenic organisms, radioactive or very toxic substances, including any of the following... (mark all that are correct)

a)

faecal material or human waste.

b)

environmental organisms of potential health significance.

c)

pathogens from any other source.

d)

butchery or other animal waste.

31.

Where would you fin a waste disposal unit?

a)

In a bedsit

b)

Above a kitchen sink

c)

Under a kitchen sink

d)

in a Sluice room

32.

D1 Discharge pipework must be maximum ​ (a)   , D2 Discharge pipework must be Minimum ​ (b)   . ​ (c)   isolation valve must be installed. All Unvented heating systems must comply with ​ (d)   Of the Building Regs.

Choose from the below words
600 mm
300 mm
Full-Bore
G3
33.

Match the following - The installation requirements of a WC macerator within a dwelling.

a)

___ fall from appliance to macerator

1.

1:40

b)

Rise vertically from the macerator within ___ of the outlet

2.

300 mm

c)

___ radius bends on the outlet

3.

Long

d)

___ connections to the macerator unit

4.

Flexible

e)

___ maximum pan connector if used within a concealed unit

5.

200 mm