MEET IN ARHITECTURE

Total questions: 10

Worksheet time: 14mins

Name
Class
Date
1.

What is the name of the ceiling construction type in the image?

a)

SUSPENDED CEILING

b)

WAFFLE SLAB

c)

HOLLOW TILE SLAB

d)

RIBBED SLAB

2.

What is the name of the system used to create shadows in the image?

a)

Brenda

b)

Pergola

c)

Classic Awning

d)

Canopy

3.

What is the name of the system that makes a structure work as two separate parts in the photo ?

a)

BASEBOARD

b)

AREAWAY

c)

DRAINAGE

d)

DILATATION

4.

What is the usage of system in the photograph?

a)

Water Profing

b)

Sound insulation

c)

Waste water

d)

Heating

5.

What is the name of the product that is generally formed by the combination of materials such as clay, kaolin, quartz, feldspar at high temperatures?

a)

Ceramic

b)

Marble

c)

TERRAZZO

d)

TIMBER

6.

Which one is the first stage of the ceramic production?

a)

COOKING

b)

GLAZING

c)

RAW MATERIAL SUPPLY

d)

DRYING

7.

How should be the baking process of the ceramic biscuit?

a)

Fast and uncontrolled

b)

Fast and controlled

c)

Slow and controlled

d)

Slow and uncontrolled

8.

Which one is not the main material of advanced ceramics?

a)

ZrO2

b)

Al2O3

c)

Clay

9.

What is the name of the pre-moulded concrete item in the factory or building sites?

a)

Precast concrete

b)

Shear wall

c)

Pouring concrete

d)

Shealter

10.

What is the divided area that provides the transfer of systems such as electrical installations, sanitary installations, mechanical installations from the foundation to the structure in the buildings?

(a)