wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

2022 01 LEED Green Associate LEED PROCESS 1

Total questions: 50

Worksheet time: 38mins

Name
Class
Date
1.

What are the roles of USGBC?

a)

Overseeing LEED credential maintenance and third-party technical reviews of registered LEED projects

b)

Administering and creating the LEED rating systems and issuing LEED building certifications

c)

Auditing member companies and providing building grants to for-profit companies

d)

Promoting the triple bottom line and administering the LEED exams

2.

How does USGBC support achievement of its mission "to transform the way buildings and communities are designed, built and operated, enabling an environmentally and socially responsible, healthy, and prosperous environment that improves the quality of life"?

a)

Partnership with GBCIs.

b)

Financial incentives

c)

Free consulting

d)

Local chapters

3.

What is USGBC's vision?

a)

Transform the way buildings and communities are designed, built, and operated

b)

Buildings and communities that will regenerate and sustain the health and vitality of all life within a generation

c)

See the transformation of a built environment that leads to a sustainable future

This is CaGBC's vision.

d)

Lead and accelerate the transformation to high-performing, healthy green buildings, homes, and communities throughout the United States

4.

"To transform the way buildings and communities are designed, built, and operated, enabling an environmentally and socially responsible, healthy, and prosperous environment that improves the quality of life" denotes which of the following:

a)

USGBC's mission

b)

USGBC's vision

c)

USGBC's 2013-2015 strategic plan

d)

The purpose of LEED Online

5.

Promoting the triple bottom line is a part of USGBC's:

a)

Guiding principles

b)

Vision

c)

Mission

d)

Strategic goals

6.

Which of the following instances of documentation is an acceptable form when the name of the organization is appearing in a press release for the first time?

a)

United States Green Building Council

b)

U.S.G.B.C.

c)

U.S. GBC

d)

U.S. Green Building Council

7.

A member company wants to display its USGBC member logo. What would be an appropriate use for the USGBC member logo?

a)

On a company's product to show product endorsement

b)

On company letterhead

c)

On legal documents

d)

On any partner website of the member company

8.

What does LEED stand for?

a)

Leadership in Energy Efficient Design

b)

Leadership in Energy and Environmental Design

c)

Leadership in Energy and Efficient Design

d)

Leadership in Environmental Efficient Design

9.

Grammatically, what language is the appropriate usage to describe a project that has been certified at any level?

a)

LEED Certified

b)

LEED certification

c)

LEED-certified

d)

LEED Certified certified

10.

What describes a project that has been certified to the base level?

a)

LEED's Certified

b)

LEED Accredited

c)

LEED Certified

d)

LEED Certified certified

11.

Which of the following are credit categories found in the LEED scorecard?

a)

Sustainable Sites and Indoor Air Quality

b)

Water Efficiency and LEED AP

c)

Materials and Resources and Sustainable Sites

d)

Energy Performance and Materials and Resources

12.

Which of the following is NOT a minimum program requirement (MPR)?

a)

Permanent location on existing land

b)

Reasonable LEED boundaries

c)

Compliance with project size requirements

d)

Commitment to sharing whole-building energy and water usage data

13.

Which of the following defines the types of buildings, spaces, and neighborhoods that the LEED rating system is designed to evaluate?

a)

Prerequisites

b)

Minimum Program Requirements

c)

LEED Online

d)

Credits

14.

What are the key criteria that define green building performance?

a)

Minimum program requirements

b)

Third party standards

c)

Prerequisites

d)

Innovative designs

15.

What term refers to a mandatory project characteristic, measurement, quality, value or function as identified within the LEED rating system?

a)

Credit

b)

Minimum Program Requirement

c)

Prerequisite

d)

Exemplary performance

16.

Which of the following are mandatory for LEED certification? 

a)

Meeting all prerequisites

b)

Having a LEED AP on the project

c)

Earning at least 50 points

d)

Pursuing 4 Regional Priority credits

e)

Earning Innovation points

17.

Each LEED credit and prerequisite includes the intent of the credit/prerequisite.  What is the 'intent' of a credit/prerequisite?

a)

Details the level of performance needed to achieve a credit

b)

Identifies the main sustainability goal or benefit of the prerequisite or credit

c)

Addresses the synergies and trade-offs between credits

d)

Outlines concerns specific to specific regions

18.

What are the goals of the Minimum Program Requirements?

a)

Protect the integrity of the LEED program

b)

Ensure prerequisites are met

c)

Verify buildings are meeting environmental goals

d)

To host a LEED Charette

19.

What is required of all new LEED buildings?

a)

Must have a minimum building height, have a daylighting strategy, and provide for occupant comfort

b)

Must have an ENERGY STAR score of 50, use sustainable building materials, and have preferred parking

c)

Must have access to public transportation, manage rainwater, and have a FAR of at least 1.5

d)

Must be a permanent structure, use a reasonable site boundary, and have a minimum floor area

20.

What is each LEED rating system made up of?

a)

3rd party standards

b)

A combination of credit categories

c)

Impact categories

d)

Interpretations

21.

What best defines the project boundary?

a)

Portion of the project site submitted for LEED certification

b)

Platted property line of the project defining land and water within it

c)

Total area within the platted property line not including any non-constructed areas

d)

Total area within the legal property boundaries of the site; this encompasses all areas of the site, including constructed and non constructed areas

22.

What best defines the property area?

a)

Portion of the project site submitted for LEED certification

b)

Platted property line of the project defining land and water within it

c)

Total area within the platted property line not including any non-constructed areas

d)

Total area within the legal property boundaries of the site; it encompasses all areas of the site, including constructed and non-constructed areas

23.

The total land area of a project site covered by buildings, streets, parking areas, and other typically impermeable surfaces constructed as part of the project is the:

a)

Development footprint

b)

LEED neighborhood

c)

Stormwater retention area

d)

Restored area

24.

The area of a project site that is used by the building structure, defined by the perimeter of the building plan is the:

a)

Building envelope

b)

Building footprint

c)

Development footprint

d)

Building shell

25.

What is the exterior surface of the building referred to as?

a)

Building footprint

b)

Building density

c)

Envelope

d)

Floor area ratio

26.

What does the LEED Volume Program help with?

a)

Cost-effective LEED certification on a volume scale

b)

Comparing baseline energy use among buildings

c)

Comparing design case energy use among buildings

d)

Policy support for LEED documentation

27.

A university client asks about certifying multiple buildings. Which of the following is an appropriate response?

a)

The Campus Program can be used for projects not necessarily uniform in design or operations but located on a single campus location.

b)

The LEED Volume Program is always used for certifying more than one building.

c)

The Campus Program is used for certifying multiple buildings if they are adjacent to each other.

d)

The Neighborhood Development rating system would be used to streamline the documentation process.

28.

A hamburger franchise is planning on building thirty new restaurants across the country in the next two years. Each restaurant is based on the same prototype. How should the multiple buildings be certified?

a)

Using the LEED Volume Program

b)

By registering each project individually with LEED Online

c)

Using the LEED Campus Program

d)

As a LEED for Neighborhood Development project

29.

A telecom company is building a new ten-story office and data center. The office space will be on the top seven floors and the data center on the first three floors. Which of the following rating system would be best suited for the project?

a)

LEED BD+C: Data Centers

b)

LEED BD+C: Warehouses and Distribution Centers

c)

LEED BD+C: Core and Shell

d)

LEED BD+C: New Construction

30.

Which of the following LEED rating systems would the project team of a planned new three-story apartment building choose?

a)

The LEED Homes rating system that corresponds to the ENERGY STAR program in which they are participating.

b)

LEED ND: Plan

c)

LEED BD+C: New Construction and Major Renovations

d)

LEED Multifamily Midrise

31.

What LEED rating system helps create better, more sustainable, well-connected neighborhoods?

a)

LEED ND

b)

LEED BD+C: Schools

c)

LEED Homes

d)

LEED O+M: Existing Buildings

32.

A building owner's project includes a major HVAC renovation, significant envelope modifications, and core plumbing renovation. An interior fit-out is not part of the project. What LEED rating system would be most appropriate for this project?

a)

LEED ID+C: Commercial Interiors

b)

LEED BD+C: New Construction

c)

LEED O+M: Existing Buildings

d)

LEED BD+C: Core and Shell

33.

A new building tenant is leasing 2-stories in an existing 10-story building. What rating system would be appropriate for the project?

a)

LEED Interior Design and Construction: Commercial Interiors

b)

LEED Building Design and Construction: New Construction

c)

LEED Operations and Maintenance: Existing Buildings

d)

LEED Building Design and Construction: Core and Shell

34.

Which LEED rating system can be certified before full occupancy?

a)

LEED BD+C: Schools

b)

LEED BD+C: New Construction

c)

LEED O+M: Existing Buildings

d)

LEED BD+C: Core and Shell

e)

LEED ID+C: Commercial Interiors

35.

An architect is designing a mixed use building that will have retail space on the lower floors and residential condominiums on the upper floors. The building will also include space for a pre-kindergarten learning facility. What LEED rating system would be most appropriate?

a)

LEED BD+C: Schools

b)

LEED BD+C: New Construction

c)

LEED BD+C: Retail

d)

LEED ID+C: Commercial Interiors

36.

A multi-family building that is 3 stories tall would be certified under what rating system?

a)

LEED BD+C: New Construction

b)

LEED Homes and Multifamily Lowrise

c)

LEED Multifamily Midrise

d)

LEED ID+C: Commercial Interiors

37.

Performance periods are part of which LEED rating system family?

a)

LEED BD+C

b)

LEED O+M

c)

LEED ID+C

d)

LEED ND

38.

What LEED rating system addresses exterior site maintenance programs?

a)

LEED BD+C: Schools

b)

LEED BD+C: New Construction

c)

LEED O+M: Existing Buildings

d)

LEED BD+C: Core and Shell

39.

When there are two or more rating systems that might be applicable to a project, how should the project team decide which rating system to use?

a)

Use the 40/60 rule

b)

Choose the rating system that has the most regional priority credits

c)

Choose the rating system that will result in the lowest certification costs

d)

Check with local code what rating system to use

40.

What factor impacts the cost of earning LEED-certification?

a)

Square footage of the building

b)

The number of stories the building has

c)

The number of Full Time Equivalents (FTEs) that will occupy the finished building

d)

The type of land the building was built on

41.

What additional LEED certification would a project team likely pursue for an office building that has already earned LEED BD+C: Core and Shell if the offices will be leased out to tenants?

a)

LEED BD+C: New Construction

b)

LEED ID+C: Commercial Interiors

c)

LEED Homes

d)

LEED BD+C: Core and Shell post-certification

42.

If a building has already earned LEED BD+C: New Construction certification what additional certifications could the building earn in the future?

a)

LEED BD+C: Core and Shell

b)

LEED ID+C: Commercial Interiors

c)

LEED Homes

d)

LEED for Neighborhood Development

43.

How does LEED evaluate the environmental performance of a building?

a)

From a whole building perspective over a building's life cycle

b)

Using LEED Online

c)

Through a cradle to grave analysis

d)

By the amount of energy reduction

44.

What is one of the important factors of the LEED Green Building Rating System?

a)

It is mandatory

b)

It is consensus-based

c)

It is the only green building standard

d)

It is government-financed

45.

The point values of a credit are based on the credit's ability to:

a)

Increase building costs

b)

Be easily implemented

c)

Contribute to a higher certification level

d)

Mitigate the environmental harms of a building

46.

Who is responsible for ensuring the use of the consensus process to evolve LEED in accordance with the mission, guiding principles, and strategic plan of USGBC?

a)

LEED Steering Committee

b)

LEED Technical Committee

c)

LEED Technical Advisory Groups

d)

LEED Board of Directors

47.

Who develops ongoing improvements to LEED?

a)

USGBC member-based volunteer committees in conjunction with USGBC staff

b)

USGBC Technical Advisory Groups (TAGs)

c)

World Green Building Council (WGBC)

d)

USGBC Board of Directors

48.

Which of the following helps reinforce the open consensus process of new LEED versions?

a)

The balloting process with USGBC membership

b)

The feedback projects receive from LEED credit reviewers

c)

Government oversight

d)

The addition of new LEED adaptations

49.

The LEED Green Building Rating System is all of the following EXCEPT:

a)

Voluntary

b)

Consensus-based

c)

Market-driven

d)

Privately funded

50.

What are the basic types of LEED improvements that are updated through revisions on a regular development cycle?

a)

Addenda and LEED reviewer comments

b)

Adaptations and Credit interpretation requests

c)

Next version of LEED rating system and LEED technical requests

d)

Addenda and Next version of LEED rating system

e)

Credit interpretation requests and LEED technical requests