wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

Monday Quiz (April 11)

Total questions: 30

Worksheet time: 22mins

Name
Class
Date
1.

From the figures above, what is C?

a)

A. ONE WAY SLAB

b)

B. TWO WAY SLAB

c)

C. FLAT SLAB

d)

D. WAFFLE SLAB

2.

2. From the figures above, what is D?

a)

A. ONE WAY SLAB

b)

B. TWO WAY SLAB

c)

C. FLAT SLAB

d)

D. WAFFLE SLAB

3.

3. From the figures above, what is A?

a)

A. ONE WAY SLAB

b)

B. TWO WAY SLAB

c)

C. FLAT SLAB

d)

D. WAFFLE SLAB

4.

4. From the figures above, what is B?

a)

A. ONE WAY SLAB

b)

B. TWO WAY SLAB

c)

C. FLAT SLAB

d)

D. WAFFLE SLAB

5.

5. The figure above is a

a)

A. Rebar Slab

b)

B. Post- tensioned Slab

c)

C. Coffered Slab

d)

D. Waffle Slab

6.

6. What happens to the Footing when it is starting to deform?

a)

a. Cracks at the bottom

b)

b. Creeping

c)

c. Bend upward

d)

d. Buckling

7.

7. It is a wall designated to resist lateral forces parallel to the plane of the wall.

a)

a. Bearing wall

b)

b. Shear Wall

c)

c. Parapet Wall

d)

d. Retaining Wall

8.

8. IDENTIFY FIGURE 2C

a)

A. UPRIGHT

b)

B. PENDENT

c)

C. PENDANT

d)

D. SIDEWALL

9.

9. IDENTIFY FIGURE 2A

a)

A. UPRIGHT

b)

B. PENDENT

c)

C. PENDANT

d)

D. SIDEWALL

10.

10. IDENTIFY FIGURE 2B

a)

A. UPRIGHT

b)

B. PENDENT

c)

C. PENDANT

d)

D. SIDEWALL

11.

11. Minimum height of Siamese connection from the ground line?

a)

A. 1000mm

b)

B. 1200mm

c)

C. 900mm

d)

D. 300mm

12.

12. In the vernacular term, what is the cut in solid wood to accommodate another member in order to prevent water seepage?

a)

a. Vaciada

b)

b. Canto mesa

c)

c. Quatro canto

d)

d. Sima recta

13.

13. A lumber which is cut but not finished is referred to as?

a)

a. S4S

b)

b. SANDBLASTED LUMBER

c)

c. ROUGH LUMBER

d)

d. KILN DRIED

14.

14. IT REFERS TO A LUMBER THAT HAS BEEN PROCESSED THROUGH A PLANNING MACHINE IN ORDER TO ATTAIN A SMOOTH SURFACE AND UNIFORMITY OF SIZE ON AT LEAST ONE SIDE OR EDGE.

a)

A. SUN-DRIED

b)

B. KILN DRIED

c)

C. DRESSED

d)

D. ROUGH

15.

15. WHAT IS THE ADVANTAGE OF CONVENTIONAL CONSTRUCTIONOVER PRECAST?

a)

A. FLEXIBILITY

b)

B. COST

c)

C. SPEED

d)

D. GOOD QUALITY CONTROL

16.

16. CLASS A CONCRETE MIX IS NOT RECOMMENDED FOR?

a)

A. PATHWALK

b)

B. BEAM & GIRDER

c)

C. SLAB ON FILL

d)

D. SLAB

17.

17. WALLS AT PROPERTY LINES

a)

A. RETAINING WALL

b)

FIREWALL

c)

C. SHEAR WALL

d)

D. PARTY WALL

18.

18. WALLS WITHIN PROPERTY

a)

A. RETAINING WALL

b)

B. FIREWALL

c)

C. SHEAR WALL

d)

D. PARTY WALL

19.

19. WALLS AT THE BASEMENT

a)

A. RETAINING WALL

b)

B. FIREWALL

c)

C. SHEAR WALL

d)

D. PARTY WALL

20.

20. WHICH IS NOT A CEMENT BRAND?

a)

A. RIZAL

b)

B. ISLAND

c)

C. DRAGON

d)

D. ZEUS

21.

SITUATION:

NEWLYWEDS ARCHITECT MARIANNE AND ENG. JECH DECIDED TO PUT UP A DESIGN FIRM. ARCHITECT MARIANNE WILL DO THE ARCHITECTURAL PLANS WHILE ENG. JECH WILL TAKE THE STRUCTURAL DESIGN. DUE TO THEIR HARD WORK, GOOD WORKING RELATIONS AND A BIT OF LUCK, THEY WERE ABLE TO GET SEVERAL PROJECTS. HOWEVER, SINCE THEY WERE JUST STARTING OUT, THEY DECIDED TO GET THE SERVICES OF A MASTER PLUMBER ON A PER PROJECT BASIS FO ALL OF THEIR PROJECTS.

HOW WOULD THEY PAY THE MASTER PLUMBER?

a)

A. FIXED MONTHLY, SINCE IT WILL BE CHEAPER AS HE IS TAKING CARE OF ALL THE PROJECTS ANYWAY

b)

B. PER FIXTURE. PER PROJECT

c)

C. PERCENTAGE OF COST

d)

D. PER LINEAR METER

22.

2. DUE TO THE NUMEROUS PROJECTS COMING THEIR WAY, THE FIRM REACHED A POINT WHEREIN THEY BECAME UNDER-MANNED VIS-À-VIS THEIR PROJECTS. ENG JECH WAS TASKED TO SUPERVISED THE CONSTRUCTION AS THE CIENT SPECIFICALLY ASKED HIM BECAUSE OF HIS REPUTATION AS A SOUGHT-AFTER ENGINEER IN SOUTH EAST ASIA. THERE WAS AN ACCIDENT IN THE JOB SITE WHEREIN THE BEAM COLLAPSED AND IT WAS FOUND OUT THAT IT WAS DUE TO THE INFERIOR MATERIALS USED BY THE CONTRACTOR. WHO IS LIABLE UNDER THE CIVIL CODE OF THE PHILIPPINES?

a)

A. ARCHITECT MARIANNE

b)

B. ENG. JECH

c)

C. CONTRACTOR

d)

D. ENG. JECH AND CONTRACTOR

23.

DUE TO THE DELAY CAUSED BY THE COLLAPSED OF THE BEAM, THE PROJECT COMPLETION TIME WAS DELAYED BY OVER A MONTH. THE OWNER IS ASKING TO BE COMPENSATED FOR THE FAILURE TO COMPLETE THE WORK WITHIN THE TIME FRAME SET FORTH IN THE CONTRACT. WHAT DO YOU CALL THIS?

a)

PUNITIVE DAMAGES

b)

B. PERFORMANCE DAMAGES

c)

C. BILL OF DAMAGES

d)

D. LIQUIDATED DAMAGES

24.

. AFTER LAYING OFF SEVERAL OF THEIR WORKERS, ARCHITECT MARIANNE TOOK ON MORE WORK LOAD AND THAT INCLUDES STRUCTURAL CONCEPTUALIZATION. HOW CAN SHE CONTRIBUTE UNDER THIS?

a)

SHE CAN DO BUILDING PROGRAMMING

b)

B. SHE CAN HELP MAKE STRUCTURAL DESIGN COMPUTATIONS TO HELP LESSEN ENG. JECH’S WORK LOAD

c)

C. SHE CAN CONCEIVE AND DEVELOP THE TYPE, DISPOSITION, ARRANGEMENT AND PROPORTIONING OF STRUCTURAL ELEMENTS.

d)

D. SHE CAN HELP GIVING PSYCHOLOGICAL SUPPORT TO ENG JECH.

25.

YOU JUST PASSED THE RECENT LICENSURE EXAMINATION FOR ARCHITECTS AND…

1. WHAT DO YOU DO NEXT?

a)

A. GO BACK TO YOUR OLD JOB

b)

B. LOOK FOR GREENER PASTURE

c)

C. GET READY FOR OATH TAKING

d)

D. PUT UP YOUR OWN FIRM

26.

2. THE NEW ARCHITECT’S CREDO WAS SIGNED ON

a)

A. JUNE 4 2018

b)

B. JUNE 5 2018

c)

C. JUNE 6 2018

d)

D. JUNE 20 2018

27.

3. WHAT IS NOT MENTIONED IN THE ARCHITECT’S CREDO?

a)

A. CLIENTS

b)

B. COLLEAGUES

c)

C. INDUSTRY PARTNERS

d)

D. GOVERNMENT

28.

WHAT IS THE BEST WAY TO PROVIDE FOR THE CONVINIENCE OF BOTH PEOPLE IN WHEEL CHAIR AND BLIND PERSONS?

a)

RAILINGS

b)

B. TACTILE SURFACES/ BLOCKS IN THE IMMEDIATE VICINITY OF CROSSINGS

T CONTROLLED CROSSINGS WITH PEDESTRIAN PHASES AND AUDIBLE

c)

C. BRIGHTLY PAINTED ZEBRA CROSSINGS WITH PEDESTRIAN PHASES AND AUDIBLE SIGNALS.

d)

D. LIGHT CONTROLLED CROSSINGS WITH PEDESTRIAN PHASES AND AUDIBLE SIGNALS

29.

WHAT IS ANOTHER TERM FOR C-3 OR COMMERCIAL 3?

a)

METROPOLITAN 3

b)

METROPOLITAN COMMERCIAL

c)

. BUSINESS AND MERCANTILE

d)

HIGH END SUB URB

30.

IF YOU SUBTRACT THE ISA FROM THE MACA, WHAT WILL YOU GET?

a)

USA

b)

PSOmax

c)

TLA

d)

FOB