wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

TLE 6 Q4 W2.2

Total questions: 20

Worksheet time: 10mins

Name
Class
Date
1.

Enhancing a product means (improving, beautifying, decorating) the appearance of the product.

a)

improving

b)

beautifying

c)

decorating

2.

A drawing that shows the contour of a product is _________________.

a)

sketching

b)

measuring

c)

cutting

d)

shading

3.

. Creating lights and dark patterns on the surface of a product is _________________.

a)

sketching

b)

measuring

c)

cutting

d)

shading

4.

It is a freehand drawing on the surface of an object _________________.

a)

sketching

b)

measuring

c)

cutting

d)

shading

5.

the process of making marks on the outer parts of any shape, object, or any figure with the use of lines.

a)

sketching

b)

measuring

c)

outlining

d)

shading

6.

It is used to divide distances into two equal parts and to transfer measurements, space, points, or lines.

a)

Divider

b)

Compass

c)

Protractor

7.

It is used in drawing arcs and circles.

a)

Divider

b)

Compass

c)

Protractor

8.

It is a tool used to set off measurements of angles and arcs that cannot be made by triangles.

a)

Divider

b)

Compass

c)

Protractor

9.

It is made of wood measuring 26 x 22 inches. The working edge is straight and the surface is smooth.

a)

Divider

b)

Compass

c)

Protractor

d)

Drawing Table

10.

Jasper is applying varnish to his project using brush. what method of applying finishes is he using?

a)

Brush Method

b)

Dip Coating

c)

Spray Method

d)

Roller Coating

11.

It is the process of whitening or removing the colour by sunlight exposure

a)

pyrography

b)

bleaching

c)

preserving

12.

A transparent finishing material that comes from gum, linseed oil, and resin.

a)

stain

b)

enamel

c)

varnish

13.

Using resources that are available in the locality in the preparation of a project.

a)

TIME

b)

MONEY

c)

MATERIALS

d)

EFFORT

14.

Simeon sees to it that he is in the right condition before starting his work, he is 100 percent ready and is prepared.

a)

TIME

b)

MONEY

c)

MATERIALS

d)

EFFORT

15.

Observing the allocated number of days in accomplishing of a plan or a project.

a)

TIME

b)

MONEY

c)

MATERIALS

d)

EFFORT

16.

Checking the prices of the resources to be used that is durable but within allocated budget.

a)

TIME

b)

MONEY

c)

MATERIALS

d)

EFFORT

17.

Any work makes easy, fast and safe if you use ________________.

a)

A. genuine tools

b)

B. appropriate tools

c)

C. imported tools

d)

D. localized tools

18.

The first step to do before repairing something is to ______________.

a)

determine the tools needed

b)

put a nail to damage part

c)

collect all the materials

d)

determine the damage part

19.

Which of the following belongs to finishing materials?

a)

nails

b)

glue

c)

lumber

d)

varnish

20.

Paint, varnish and shellac are called what?

a)

Finishing Materials

b)

Spray

c)

Protection

d)

Check Valve