*Profprac

Total questions: 25

Worksheet time: 13mins

Name
Class
Date
1.

Defining open space in residential subdivision

a)

PD 1296

b)

PD 1298

c)

RA 1298

d)

RA 1296

2.

Architectural programming is one of the architect’s services that falls under

a)

Pre-Design Services

b)

Regular Design Services

c)

Specialized Architectural Services 

d)

Construction Management Services

3.

Condominium & Subdivision, Bridges Protective Law.

a)

PD 957

b)

BP 220

c)

PD975

4.

This services giver full meaning to what the professional calls comprehensive Architectural Service. It wraps-up the whole range of architectural services.

a)

Post-Construction Services

b)

Construction Management Services

c)

Fulltime Supervision Service

d)

Specialized Architectural Services

5.

Contract Documents shall be the property of the

a)

Architect

b)

Owner

c)

Contractor

d)

Client

6.

Defining open space

a)

PD 1216

b)

PD 1612

c)

PD 1261

d)

PD 126

7.

is an agreement in which each of the parties to the contract makes a promise or promises to the other party.

a)

Bilateral Contract

b)

Unilateral Contract

c)

Expressed Contract

d)

Implied Contract

8.

only one party to the contract makes a promise.

a)

Unilateral Contract

b)

Bilateral Contract

c)

Expressed Contract

d)

Implied Contract 

9.

is one in which the terms are expressed verbally, either orally or in writing

a)

Expressed Contract

b)

Bilateral Contract

c)

Unilateral Contract

d)

Implied Contrac

10.

is one in which some of the terms are not expressed in words.

a)

Implied Contract

b)

Expressed Contract

c)

Unilateral Contract

d)

Bilateral Contract

11.

The _____ pays for the structural, utilities & other tests as may be required for the project.

a)

Conctractor

b)

Owner

c)

Architect

d)

Client

12.

The fee of the architect for design-build services on a guaranteed maximum cost aside from his fee for regular design services.

a)

10%

b)

5%

c)

15%

13.

For interior design services, the architect shall be paid what percentage of the fee upon submission of the final design.

a)

50%

b)

30%

c)

25%

d)

10%

14.

When the owner fails to implement the plans and documents for construction as prepared by the architect, the architect is entitled to receive what percentage of his fee.

a)

85%

b)

75%

c)

65%

d)

50%

15.

The minimum basic fee for specialized decorative building.

a)

12%

b)

6%

c)

8%

16.

The minimum basic fee for industrial buildings with a project cost below 50 million pesos.

a)

12%

b)

6%

c)

8%

17.

The minimum basic fee for hospitals with a project cost below 50 million pesos.

a)

8%

b)

6%

c)

12%

18.

The release of 10% retention by the owner shall be done after how many months from the date of final payment.

a)

3 months

b)

6 months

c)

12 months

d)

8 months

19.

How many days shall the Building Official issue a certificate of occupancy after final inspection of the project.

a)

30 days

b)

7 days

c)

15 days

20.

Supervision Work is a non-creative work, true or false.

a)

TRUE

b)

FALSE

21.

True or false, based on the Civil Code, the Project Manager has no legal responsibility insofar as design and construction is concerned.

a)

True

b)

false

22.

What PD created the PRC which regulates the practice of various professionals.

a)

PD 223

b)

PD 233

c)

PD 323

23.

How many days upon written notice can a contractor terminate a contract with a valid reason?

a)

7 Days

b)

15 Days

c)

9 Days

d)

30 Days

24.

Suspension of work for ___ days by order of any court or other public authority through no act or fault of the contractor gives the him the right to terminate contract.

a)

120 Days

b)

30 Days

c)

60 Days

d)

90 Days

25.

the contractor can terminate contract if the owner should fail to act upon any request for payment within ____  after its certification by the architect

a)

15 days

b)

7 days

c)

30 days

d)

90 days