Total questions: 32
Worksheet time: 16mins
Forecasting the performance of the project over time by gathering and analyzing primary data
Site Analysis
Pre-Feasibility Studies
Feasibility Studies
Architectural Research
Formulation of site criteria
Site Analysis
Pre-Feasibility Studies
Feasibility Studies
Architectural Research
type of contract for architectural design services
includes the architectural design and the normal basic engineering
DAEDS
DADS
the client considers other engineering design firms with separate contracts
DAEDS
DADS
Can be based on cost per square meter (sqm) of the project area
Lump Sum/ Fixed Fee
Percentage Based on Project Construction Cost
Unit Cost
Time Basis
Scope of services can be clearly and fully defined at the outset of the project
Lump Sum/ Fixed Fee
Percentage Based on Project Construction Cost
Unit Cost
Time Basis
Charged on a mutually-agreed hourly (man-hours) or daily (per diem) or per month rate
Lump Sum/ Fixed Fee
Percentage Based on Project Construction Cost
Unit Cost
Time Basis
Recommended Professional Fee for 50M Residences
5%
7%
2.5M + 4% of excess of 25M
10%
Which Group is Residences Under?
Group 1
Group 2
Group 3
Group 4
Recommended Professional Fee for 100M Museum
10%
6%
12%
5%
Which Group is a Museum Under?
Group 5
Group 6
Group 7
Group 8
Percentage of Professional Fee when under Contract Document Phase
5%
15%
20%
50%
Percentage of Professional Fee when under Schematic Design Phase
5%
15%
20%
50%
Percentage of Professional Fee when under Design Development Phase
5%
15%
20%
50%
Who will shoulder the scale model, 3d models and walk throughs?
Architect
Owner
The architect owns the copyright of his own work.
True
False
Travelling Expenses to the site 25 km away from the Architect's office, who will shoulder it?
Owner
Architect
SPP Doc 201
Pre-Design Services
Regular Design Services
Specialized Architectural Services
Code of Ethics
How many set of Contract Documents are required by the Building Official
3
5
7
8
SPP Doc 202
Pre-Design Services
Regular Design Services
Specialized Architectural Services
Code of Ethical Conduct
Using the building classifications in SPP 202:
Parking Building
Group 1
Group 2
Group 3
Group 4
Using the building classifications in SPP 202:
Convent
Group 1
Group 2
Group 3
Group 4
Using the building classifications in SPP 202:
Convention Center
Group 1
Group 2
Group 3
Group 4
Using the building classifications in SPP 202:
Observatory
Group 1
Group 2
Group 3
Group 4
Using the building classifications in SPP 202:
Shophouse
Group 1
Group 2
Group 3
Group 4
Using the building classifications in SPP 202:
Museum
Group 3
Group 5
Group 7
Group 8
Using the building classifications in SPP 202:
Mortuary
Group 3
Group 5
Group 7
Group 8
Using the building classifications in SPP 202:
Restaurant
Group 1
Group 2
Group 3
Group 4
Using the building classifications in SPP 202:
Fire Station
Group 1
Group 2
Group 3
Group 4
Using the building classifications in SPP 202:
Race Track
Group 1
Group 2
Group 3
Group 4
Using the building classifications in SPP 202:
Laundry
Group 1
Group 2
Group 3
Group 4
Using the building classifications in SPP 202:
Serviced Apartment
Group 1
Group 2
Group 3