Method of Compensation

Total questions: 20

Worksheet time: 10mins

Name
Class
Date
1.

Meaning of: PCC

a)

Project Construction Cost

b)

Professional Commission Cost

2.

Meaning of: APCC

a)

Awarded Project Construction Cost

b)

Architect Project Construction Cost

3.

Meaning of: FPCC

a)

Final Project Construction Cost

b)

First Project Construction Cost

4.

Meaning of: MDPE

a)

Multiple of Direct Personnel Expense

b)

Minimum of Direct Personnel Expense

5.

Meaning of: PFPE

a)

Project Final Plus Expenses

b)

Professional Fee Plus Expenses

6.

Meaning of: DADS

a)

Detailed Architectural Design Services

b)

Documented Architectural Design Services

7.

Meaning of: DAEDS

a)

Detailed Architectural & Engineering Design Services

b)

Design Architectural & Engineering Detail Services

8.

What SPP Document is the new Methods of Compensation and Schedule of Fees?

a)

210

b)

209

c)

208-B

d)

310

9.

What is the Method of Compensation best used for an initial proposal wherein no set specifications are made—only the project type and the area?

a)

PFPE

b)

Unit Cost Method

c)

PPCC

d)

Retainer

10.

What is the best Method of Compensation applicable for work that requires the Architect’s personal time, such as seminars, oculars, trainings, and the like?

a)

Unit Cost Method

b)

PPCC

c)

Lump Sum

d)

Per Diem

11.

What is the best Method of Compensation for when the project has cost and time constraints that are difficult to determine on the onset of the project?

a)

PPCC

b)

Lump Sum

c)

Salary Cost x Multiplier

d)

Retainer

12.

Which of the following shall not be preferably billed via a Per Diem compensation?

a)

OSH Seminar Attendance

b)

One-Time Client Consultation

c)

Repeated use of an already built project

d)

Site inspection for a probable building location

13.

To whom are the mobilization and operational costs billable to?

a)

Architect

b)

Client

c)

Contractor

d)

Government

14.

Is travel time part of the time spent for rendering the service?

a)

Yes

b)

No

c)

Depends on the distance

d)

Depends on the client

15.

Which of the following is not considered as non-creative work

a)

Site Inspections

b)

Research Work

c)

Rendering Expert Opinion

d)

Regular Design Services

16.

What Method of Compensation is most commonly used?

a)

PFPE

b)

MDPE

c)

PPCC

d)

Lump Sum

17.

What document is required to be produced, signed and sealed, and duly processed by an Architect before the rendering of any services to a Client?

a)

Official Receipt

b)

Logbook of Records

c)

Service Agreement

d)

Contract Documents

18.

When was the new Methods of Compensation of Fees deemed effective by law?

a)

February 18, 2014

b)

May 21, 2014

c)

August 13, 2014

d)

October 15, 2014

19.

What is the law that shall govern for all disputes between the Architect and the Client?

a)

RA 9285

b)

RA 8981

c)

RA 9266

d)

RA 545

20.

Who pays for the processing of the permits and all corresponding fees that entail in securing one?

a)

Architect

b)

Client

c)

Contractor

d)

Government