wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

TCE Quiz

Total questions: 10

Worksheet time: 5mins

Name
Class
Date
1.

Federal Pipeline and Hazardous Materials Safety Administration exempted Pipelines from Pressure Testing built before?

a)

1961

b)

1965

c)

1971

d)

1970

2.

An electrical problem at San Bruno caused the valves to allow more pressure into the pipeline

a)

True

b)

False

3.

Pipeline Integrity Implementation (PII) group are responsible for the _____________ of our Canadian Gas Pipeline assets.

a)

Field Operations​

b)

Integrity Operations

c)

Integrity and Safe Operations

d)

Maintenance Projects​

4.

Quality Assurance is defined as "The operational techniques and activities used to fulfill Requirements for quality"?

a)

True

b)

False

5.

What is the name of the tall pipe that burns off excess gas from the refinery?

a)

The Derrick

b)

Flare

c)

Heat Exchangers

d)

Naptha

6.

Is Natural Gas Odorless?

a)

True

b)

False

7.

The Integrated Planning Team is responsible for which Canada Gas Operations?

a)

Portfolio Cost Management

b)

Information Management

c)

Project Initiation

d)

Business Performance

8.

TC Energy owns _________ of Natural Gas Pipeline in North America

a)

85,600 Km

b)

92,000 Km

c)

62,000 Km

d)

73,000 Km

9.

The Keystone Pipeline System has safely transported 1.5 billion barrels of oil safely from Alberta to the U.S Gulf Coast

a)

True

b)

False

10.

Where does the majority of TransCanada’s employees live?

a)

Canada

b)

United States

c)

Mexico

d)

Pakistan