1.

A mean annual runoff of 1 m3s\frac{m^3}{s}   from a catchment of area 31.54 km2km^2   represents an effective rainfall of:

a)

100 cm

b)

1.0 cm

c)

100 mm

d)

3.17 cm

2.

Direct runoff is made of:

a)

Surface runoff, prompt interflow, and channel precipitation

b)

Surface runoff, infiltration, and evaporation

c)

Overland flow, and infiltration

d)

Rainfall, and evaporation

3.

A hydrograph is a plot of:

a)

Rainfall intensity against time

b)

Stream discharge against time

c)

Cumulative rainfall against time

d)

Cumulative runoff against time

4.

The term base flow denotes;

a)

Delayed groundwater flow reacting a stream

b)

Delayed groundwater and snowmelt reaching a stream

c)

Delayed groundwater and interflow

d)

The annual minimum flow in a stream

5.

Virgin flow is:

a)

the flow in the river downstream of a gauging station

b)

the flow in the river upstream of a gauging station

c)

the flow unaffected by works of man

d)

the flow that would exist in the stream if there were no abstractions to the precipitation

6.

The water year in India starts from the first day of:

a)

January

b)

April

c)

June

d)

September

7.

An ephemeral stream

a)

is one which always carries some flow

b)

does not have any base flow contribution

c)

is one which has limited contribution of groundwater in wet season

d)

is one which carries only snow-melt water

8.

An intermittent stream

a)

has water table above the stream bed throughout the year

b)

has only flash flows in response to storms

c)

has flows in the stream during wet season due to contribution of groundwater

d)

does not have any contribution of groundwater at any time

9.

Khosla's formula for monthly runoff RmR_m  due to a monthly rainfall PmP_m  is: Rm=Pm−LmR_m=P_m-L_m . Where LmL_m   is:

a)

a constant

b)

monthly loss and depends on the mean monthly catchment temperature

c)

a monthly loss coefficient depending on the antecedent precipitation index

d)

a monthly loss depending on the infiltration characteristics of the catchment

10.

The flow-duration curve is a plot of:

a)

accumulated flow against the time

b)

discharge against time on chronological order

c)

the base flow against the precentage of times the flow is exceeded

d)

the stream discharge against the percentage of times the flow is equalled or exceeded

11.

In a flow-mass curve study the demand line drawn from a ridge in the curve did not interest the mass curve again. This represents that:

a)

the reservoir was not full at the beginning

b)

the storage was not adequate

c)

the demand cannot be met by the inflow as the reservoir will not refill

d)

the reservoir is washing water by spill

12.

If in a flow-mass curve, a demand line drawn tangent to the lowest point in a valley of the curve does not intersect the mass curve at an earlier time period, it represents that:

a)

the storage is inadequate

b)

the reservoir will not be full at the start of the dry period

c)

the reservoir is full at the beginning of the dry period

d)

the reservoir is wasting later by spill.

13.

The flow-mass curve is an integral curve of:

a)

the hydrograph

b)

the hyetograph

c)

the flow duration curve

d)

the S-curve

14.

The total rainfall in a catchment of area 1200 km2km^2  during a 6-h storm is 16 cm while the surface runoff due to the storm is 1.2 x 10810^8   m3m^3 . The ϕ\phi   index is:

a)

0.1 cm/h

b)

1.0 cm/h

c)

0.2 cm/h

d)

cannot be estimated with the given data

15.

In India, a meteorological subdivision is considered to be affected by moderate drought if it received a total seasonal rainfall which is:

a)

less than 25% of normal value

b)

between 25% and 49% of normal value

c)

between 50% and 74% of normal value

d)

between 75% and 99% of normal value

16.

An area is classified as a drought prone area if the probability P of occurrence of a drought is:

a)

0.4 < P ≤\le 1.0

b)

0.2 ≤\le P ≤\le 0.40

c)

0.1 ≤\le P < 0.20

d)

0.0 < P < 0.20

17.

In the standard SCS-CN method of modelling runoff due to daily rainfall, the maximum daily rainfall that would not produce runoff in a watershed with CN = 50 is about:

a)

65 mm

b)

35 mm

c)

50 mm

d)

25 mm

18.

In the standard SCS-CN method, if CN=73 the runoff volume for a one day rainfall of 100 mm is about:

a)

38 mm

b)

2 mm

c)

56 mm

d)

81 mm