Font size
WorksheetsVopak Fundamental Learning
Total questions: 15
Worksheet time: 8mins
How many fundamentals on safety do we have within Vopak
6
7
8
9
10
Which is not major shareholder to KTSB
KPSB
PCG
DIALOG
VOPAK
Why Vopak fundamental is very important to KTSB? Select two best answer
Incident not manageable
None of us shall be able to go home safely
Everyone's responsibility
To store product safely
What is SDS?
Safety Digital System
Safety Document System
Safe Date Safety
Safety Data Sheet
During the transfer of product, how we manage the electric static
Use grounding
Limited the flow rates
Encourage splash loading
No sufficient relaxation time
What are the elements in the static electricity
Megatron
Electron & proton
Neutrons
Proton x70
The contractor will perform drill activity using drill machine. What is the permit he required to complete his task
Cold permit
Confine space
Hot Work permit
WAH permit
"ERIC PD" is the level of control the hazard. What is the "D"
Decommissioning
Damage
Discipline
Danger
How to ensure your non-routine activity is performed safely
Always complied with PTW
Conduct LMRA
Not use proper tool and equipments
Lack of supervision
Who is the responsible person to performing LOTO at the electrical device?
Project Engineer
Competent Contractor
Mechanical technician
Electrical
De-ISOLATION can be done. IF..
Project delay
Work is in-progress
Work is completed and equipment is handed over
Work permitted is taken off
Apparently, I am a healthy and need to complete an inspection in the confined space. Can i proceed with the task?
Yes, with manager approval
Yes, with CEO approval
No, need to have valid AESP training and declare health declaration
No, need waiver from DOSH
Hierarchy of control in working at height, what is the primary control
Have WAH training
Using safety harness
Using portable platform
Avoid from working at height
What is the minimum depth of excavation required excavation certification
15mm
155cm
150mm
150m
Forklift stated the SWL is about 3 MT. What means by SWL
Safety work leader
Swing left
the minimum load to be handled by the forklift
the safe workload that can operate by the forklift