What is Mr. Molina favorite snack?
Popcorn
Beef jerky
Trail mix
Chips
What is an example of a project shop?
wheels
ship machines
bridges
machine tools
What is the correct definition of flow shop?
All material and information has to come to this location, and the finished product is then completed at this location.
small batches of a variety of custom products are made.
cells connected together (linked), using a unique form of inventory and information controlled
all works (jobs) have the same processing route, is set up based on the flow
Which one of these are Not an example of manufacturing system design?
Lean Manufacturing
Flow Shop
Job Shop
Depreciation on vehicles
What is Mr. Molina's favorite exercise activity ?
Push ups
Chair dips
Cardio
Dumbbell rows
How are job shop employees hired
Their attitude
Their high skilled work with a variety of manufacturing crafts
Their arrival time at work
Their creativity with the machinery tools allowing them to successfully complete tasks
What is Mr. Molina's favorite subject in engineering to teach?
Trusses
Centroids
CAD work
Simple Machines