Font size
WorksheetsSTEAM
Total questions: 42
Worksheet time: 21mins
Engineering is
a human-made object.
electronic appliances.
the application of math and science to solve real world problems.
only for geniuses.
The purpose of the design process is to
solve problems effectively and efficiently.
make a problem more complicated.
make sure an engineer is using their notebook correctly.
slow down an engineer's work.
Which step of the design process is when the engineer analyzes and evaluates all the possible solutions and
chooses the best possible solution considering the project criteria and constraints?
Construct and test a prototype
Define the problem
Present the solution
Develop a solution
What step of the design process is when you determine the effectiveness of your solution and how you could
improve it?
Generate concepts
Define the problem
Present the solution
Evaluate the solution
Why do engineers work in teams when solving design challenges?
A) To reduce the workload of an individual
B) To complete work more quickly
C) To generate more ideas and greater creativity
B & C
A, B & C
It is anticipated that there will be _________ unfulfilled STEM jobs in the state of Texas.
106,000
60,000
516,000
1.6 million
To fulfill most of these STEM jobs, you will need a _________ degree
Salesforce Admin Credential
Masters in behavior science
Bachelor's in Computer Science
Associates
GED
By what year will these STEM jobs need to be fulfilled?
2050
2026
2043
2024
The A in STEAM stands for...
Art
Advocacy
Arts
Analyze
All kids should go to college.
Yes
No
It depends
A STEAM education offers Trailblazers the opportunity to...
Practice skills and protocol common in STEM fields
Learn how to collaborate with a diverse group of thinkers
Have preference and self efficacy over their own future
Be equipped to make positive changes in their lives and community
Gain exposure to experiences and opportunities that may not be readily accessible to them
STEAM là gì ?
Science - Technology - Economics - Art - Mathematics
Science - Technology - Engineering - Activities - Mathematics
Sport - Technology - Engineering - Art - Mathematics
Science - Technology - Engineering - Art - Mathematics
Mars is how many moths away from Earth
2-3
6-8
4-5
9-10
Which of the following is a constraint in a project?
A) Time
B) Materials
C) Friends
A & B
A, B & C
STEAM helps with students imagination?
Yes
No
STEAM helps with which type of skills?
Problem Solving
Collaboration
Cardio
Communication
STEM stands for...?
Engineering
Science
Technology
Electronic
Math
In STEAM, what does the A stand for?
Angel
Ants
Art
Arch
Students will not accomplish many objectives while using STEAM?
True
False
The 1975 NASA launches of the Viking program consisted of two orbiters, each with a __________ that successfully soft landed in 1976.
orbiter
lander
probe
satellite
True or False- Viking 1 remained operational for six years, Viking 2 for three.
True
False
The Viking landers relayed the first color ___________ of Mars.
diagrams
overlays
audio graphs
panoramas
Mars has a reputation as a _____________ space exploration target; just 25 of 55 missions through 2019, or 45.5%, have been fully successful, with a further three partially successful and partially failures.
difficult
easy
moderate
sacred
However, of the sixteen missions since 2001, twelve have been successful and eight of these are still _____________.
operational
missing
failing
important
Following the 1993 failure of the Mars _____________ orbiter, the NASA Mars Global Surveyor achieved Mars orbit in 1997.
Pathfinder
Lab
Base
Observer
The NASA Mars Pathfinder, carrying a robotic _____________ vehicle Sojourner, landed in the Ares Vallis on Mars in the summer of 1997, returning many images.
lab
exploration
base
rocket
In January 2004, the NASA twin Mars Exploration ___________ named Spirit (MER-A) and Opportunity (MER-B) landed on the surface of Mars.
Probes
Rovers
Landers
Satellite
Among the most significant scientific returns has been conclusive evidence that liquid ___________ existed at some time in the past at both landing sites.
water
gas
metal
plasma
True or False- Martian dust devils and windstorms have occasionally cleaned both rovers' solar panels, and thus decreased their lifespan.
True
False
Spirit rover (MER-A) was active until 2010, when it stopped sending data because it got stuck in a sand dune and was unable to reorient itself to recharge its ______________.
solar panels
wheels
batteries
frame
It consisted of a lander and a small (23 lb) wheeled robotic rover named Sojourner, which was the _________ rover to operate on the surface of Mars.
second
third
first
fourth
In addition to scientific objectives, the Mars Pathfinder mission was also a "proof-of-concept" for various technologies, such as an airbag landing system and automated obstacle avoidance, both later exploited by the Mars Exploration ____________.
Landers
Rovers
Orbiters
Diggers
On 10 March 2006, NASA's Mars Reconnaissance Orbiter (MRO) probe arrived in orbit to conduct a two-year _________ survey.
Science
Math
Biology
The orbiter began mapping the Martian ___________ and weather to find suitable landing sites for upcoming lander missions.
atmosphere
ocean
caves
terrain
A vehicle designed to propel itself by ejecting exhaust gas from one end
shuttle
rocket
satellite
probe
At FIRST, which country was winning the space race
USA
Russia (Soviet Union)
China
Germany
Which president set the goal for America to get to the moon
Bush
Clinton
Kennedy
Eisenhower
