NATIONAL BUILDING CODE

Total questions: 24

Worksheet time: 24mins

Name
Class
Date
1.

This means any new construction which increases the height and/or floor area of existing buildings/ structures

a)

Alteration

b)

Addition

c)

Renovation

d)

Conversion

2.

This means a change in the use or occupancy of buildings/structures or any portion/s thereof, which has different requirements

a)

Alteration

b)

Addition

c)

Renovation

d)

Conversion

3.

This means any physical change made on buildings/ structures to increase the value, quality, and/or to improve the aesthetic

a)

Alteration

b)

Addition

c)

Renovation

d)

Conversion

4.

This means any remedial work done on any damaged or deteriorated portion/s of building/structure to restore its original condition

a)

Renovation

b)

Rehabilitation

c)

Repair

d)

Improvement

5.

Who appoints the building official?

a)

The President of the Philippines

b)

The Vice President of the Philippines

c)

Mayors of municipalities and Cities

d)

The Secretary or CEO of DPWH

6.

Who enforces PD1096 and its IRR

a)

Mayors of Municipalities and Cities

b)

The Secretary or CEO of DPWH

c)

BO

d)

CENRO

7.

Subject to existing budgetary, accounting and auditing rules and regulations, the BO shall retain not more than ___ of the income/collection derived from permit fees and other charges for the operating expenses of his office. The remainder shall accrue to the general fund of the respective city/municipality

a)

10%

b)

20%

c)

30%

d)

40%

8.

Which of the following is not exempted from the payment of building permit fees?

a)

DPWH Headquarters

b)

City Hall of Manila

c)

A traditional indigenous family dwelling with a total cost of PhP 15,990

d)

A big replica of a bahay kubo in concrete which serves as the public museum of an LGU in the province

9.

The Order of Payment issued by the Building Official shall show the breakdown of the total collections indicating the share of the local government concerned ___ and the share of the national government ___.

a)

80% ; 20%

b)

20% ; 80%

c)

10% ; 10%

d)

20% ; 10%

10.

The secretary of his duly authorized representative may prescribe and impose fines not exceeding PhP_______ when violating the terms and conditions set in the IRR of PD1096

a)

10,000

b)

15,000

c)

50,000

d)

1,000,000

11.

Which of the following is considered as a light violation?

a)

Non-compliance with work stoppage order for construction/ demolition without permit

b)

Failure to provide or install appropriate safety measures for the protection of workers, inspectors, visitors, immediate neighbors and pedestrians

c)

Non-compliance with the work stoppage order for the alteration/ addition/ conversion/ repair without permit

d)

Use or Occupancy of building/ structure without appropriate Certificate of Occupancy/ Use/ Operation

12.

Which of the following is considered as a grave violation?

a)

Non-compliance with work stoppage order for construction/ demolition without permit

b)

Failure to provide or install appropriate safety measures for the protection of workers, inspectors, visitors, immediate neighbors and pedestrians

c)

Non-compliance with the work stoppage order for the alteration/ addition/ conversion/ repair without permit

d)

Use or Occupancy of building/ structure without appropriate Certificate of Occupancy/ Use/ Operation

13.

What is the amount of fine for the Less Grave Violations?

a)

PhP 5,000

b)

PhP 8,000

c)

PhP 10,000

d)

PhP 15,000

e)

PhP 20,000

14.

What is the amount of fine for the Light Violations?

a)

PhP 5,000

b)

PhP 8,000

c)

PhP 10,000

d)

PhP 15,000

e)

PhP 20,000

15.

For failure to pay the annual inspection fee within thirty (30) days from the prescribed date, a surcharge of ___ of the inspection fee shall be imposed

a)

10%

b)

25%

c)

90%

d)

100%

16.

For constructing, installing, repairing, altering, or causing any change in the occupancy/ use of any building/ structure or part thereof or appurtenances thereto without any permit, there shall be imposed a surcharge of 100% of the building fees; Provided, that when the work in the buildings/structure is started pending issuance of the Building Permit by the Building Official, the amount of the surcharge shall be ___ of the building permit fees for the Excavation for Foundation Activity.

a)

10%

b)

25%

c)

90%

d)

100%

17.

These are permits supplementary to a Building Permit which shall be applied for and issued by the Building Official

a)

Auxiliary and Ancillary Permits

b)

Auxiliary and Accessory Permits

c)

Ancillary and Accessory Permits

d)

Ancillary and Supplementary Permits

18.

An example of an ancillary permit is the:

a)

Fencing Permit

b)

Demolition Permit

c)

Excavation Permit

d)

Electronics Permit

19.

As per SPP document 202, an architect has to submit to the owner how many sets of all construction drawings and technical specifications for purposes of obtaining a building permit?

a)

4

b)

5

c)

7

d)

10

20.

As per PD 1096, an architect has to submit to the owner how many sets of survey plans, design plans, specifications, and other documents prepared, signed and sealed over the printed names of the duly licensed and registered professionals?

a)

4

b)

5

c)

7

d)

10

21.

Which does not require soil tests?

a)

Buildings or structures of three (3) storeys and higher

b)

Buildings or structures of two (2) storeys located at a geologically hazardous area

c)

Buildings or structures of four (4) storeys

d)

Buildings or structures of two (2) storeys

22.

a building permit issued under the provisions of the code shall expire and become null and void if the building or work, authorized therein is not commenced within a period of _____ after the issuance of the building permit

a)

1 year

b)

2 years

c)

3 years

d)

6 years

23.

a building permit issued under the provisions of the code shall expire and become null and void if the building or work, authorized therein is suspended or abandoned at any time after it has been commenced for a period of _____.

a)

60 days

b)

120 days

c)

525,600 minutes

d)

1 year

24.

Which of the following items is not required to be submitted upon the completion of construction, to the Building Official?

a)

Construction Logbook

b)

As-built plans

c)

As-built Specifications

d)

Building Inspection Sheet

e)

Certified true copy of Owner-Architect Agreement