This means any new construction which increases the height and/or floor area of existing buildings/ structures
Alteration
Addition
Renovation
Conversion
This means a change in the use or occupancy of buildings/structures or any portion/s thereof, which has different requirements
Alteration
Addition
Renovation
Conversion
This means any physical change made on buildings/ structures to increase the value, quality, and/or to improve the aesthetic
Alteration
Addition
Renovation
Conversion
This means any remedial work done on any damaged or deteriorated portion/s of building/structure to restore its original condition
Renovation
Rehabilitation
Repair
Improvement
Who appoints the building official?
The President of the Philippines
The Vice President of the Philippines
Mayors of municipalities and Cities
The Secretary or CEO of DPWH
Who enforces PD1096 and its IRR
Mayors of Municipalities and Cities
The Secretary or CEO of DPWH
BO
CENRO
Subject to existing budgetary, accounting and auditing rules and regulations, the BO shall retain not more than ___ of the income/collection derived from permit fees and other charges for the operating expenses of his office. The remainder shall accrue to the general fund of the respective city/municipality
10%
20%
30%
40%
Which of the following is not exempted from the payment of building permit fees?
DPWH Headquarters
City Hall of Manila
A traditional indigenous family dwelling with a total cost of PhP 15,990
A big replica of a bahay kubo in concrete which serves as the public museum of an LGU in the province
The Order of Payment issued by the Building Official shall show the breakdown of the total collections indicating the share of the local government concerned ___ and the share of the national government ___.
80% ; 20%
20% ; 80%
10% ; 10%
20% ; 10%
The secretary of his duly authorized representative may prescribe and impose fines not exceeding PhP_______ when violating the terms and conditions set in the IRR of PD1096
10,000
15,000
50,000
1,000,000
Which of the following is considered as a light violation?
Non-compliance with work stoppage order for construction/ demolition without permit
Failure to provide or install appropriate safety measures for the protection of workers, inspectors, visitors, immediate neighbors and pedestrians
Non-compliance with the work stoppage order for the alteration/ addition/ conversion/ repair without permit
Use or Occupancy of building/ structure without appropriate Certificate of Occupancy/ Use/ Operation
Which of the following is considered as a grave violation?
Non-compliance with work stoppage order for construction/ demolition without permit
Failure to provide or install appropriate safety measures for the protection of workers, inspectors, visitors, immediate neighbors and pedestrians
Non-compliance with the work stoppage order for the alteration/ addition/ conversion/ repair without permit
Use or Occupancy of building/ structure without appropriate Certificate of Occupancy/ Use/ Operation
What is the amount of fine for the Less Grave Violations?
PhP 5,000
PhP 8,000
PhP 10,000
PhP 15,000
PhP 20,000
What is the amount of fine for the Light Violations?
PhP 5,000
PhP 8,000
PhP 10,000
PhP 15,000
PhP 20,000
For failure to pay the annual inspection fee within thirty (30) days from the prescribed date, a surcharge of ___ of the inspection fee shall be imposed
10%
25%
90%
100%
For constructing, installing, repairing, altering, or causing any change in the occupancy/ use of any building/ structure or part thereof or appurtenances thereto without any permit, there shall be imposed a surcharge of 100% of the building fees; Provided, that when the work in the buildings/structure is started pending issuance of the Building Permit by the Building Official, the amount of the surcharge shall be ___ of the building permit fees for the Excavation for Foundation Activity.
10%
25%
90%
100%
These are permits supplementary to a Building Permit which shall be applied for and issued by the Building Official
Auxiliary and Ancillary Permits
Auxiliary and Accessory Permits
Ancillary and Accessory Permits
Ancillary and Supplementary Permits
An example of an ancillary permit is the:
Fencing Permit
Demolition Permit
Excavation Permit
Electronics Permit
As per SPP document 202, an architect has to submit to the owner how many sets of all construction drawings and technical specifications for purposes of obtaining a building permit?
4
5
7
10
As per PD 1096, an architect has to submit to the owner how many sets of survey plans, design plans, specifications, and other documents prepared, signed and sealed over the printed names of the duly licensed and registered professionals?
4
5
7
10
Which does not require soil tests?
Buildings or structures of three (3) storeys and higher
Buildings or structures of two (2) storeys located at a geologically hazardous area
Buildings or structures of four (4) storeys
Buildings or structures of two (2) storeys
a building permit issued under the provisions of the code shall expire and become null and void if the building or work, authorized therein is not commenced within a period of _____ after the issuance of the building permit
1 year
2 years
3 years
6 years
a building permit issued under the provisions of the code shall expire and become null and void if the building or work, authorized therein is suspended or abandoned at any time after it has been commenced for a period of _____.
60 days
120 days
525,600 minutes
1 year
Which of the following items is not required to be submitted upon the completion of construction, to the Building Official?
Construction Logbook
As-built plans
As-built Specifications
Building Inspection Sheet
Certified true copy of Owner-Architect Agreement