WorksheetsLean Six Sigma (Andon, VSM, TPM)
Total questions: 20
Worksheet time: 10mins
It is a signal system used to alert Lean teams of an important status change, an activity that has failed or is running sub-optimally
5S
ANDON
VSM
TPM
Most Andon boards utilize color-coded cords. This color normally indicates trouble or problem.
RED
GREEN
YELLOW
In Andon System, managers generally use CALL CUES, BUTTONS, or SIGNALS.
TRUE
FALSE
Andon helps placing the focus on quickly identifying and resolving issues so that business can get back to normal.
TRUE
FALSE
is a visual tool that displays all critical steps in a specific process and quantifies easily the time and volume taken at each stage
5S
ANDON
VSM
TPM
VSM is a workplace efficiency tool designed to combine material processing steps with information flow, along with other important related data.
TRUE
FALSE
Value Stream Mapping is only applicable to Manufacturing Industries.
TRUE
FALSE
What does this symbol mean in VSM?
Production Control
Operations
Inventory
Waste
What does this symbol mean in VSM?
Manual Information
Storage
Information Flow
Shipment
What does this symbol mean in VSM?
Manual Information
Storage
Information Flow
Shipment
What does this symbol mean in VSM?
Supermarket
Storage
Information Flow
Shipment
What does this symbol mean in VSM?
Kaizen Burst
FIFO Line
Go See
Communication
What does this symbol mean in VSM?
Kaizen Burst
FIFO Line
Go See
Production Kanban
TPM strives to perfection that is generally grounded by the idea of: No breakdowns, no stopping, no defects, and no accidents.
TRUE
FALSE
A pillar of TPM which means ensuring your operators are fully trained on routine maintenance like cleaning, lubricating and inspecting, as well as placing that responsibility solely in their hands.
Autonomous Maintenance
Planned Maintenance
Quality Maintenance
Focused Improvement
A pillar of TPM which focuses on working design error detection and prevention into the production process
Autonomous Maintenance
Planned Maintenance
Quality Maintenance
Focused Improvement
Identifying Pilot Area is the second step of TPM
TRUE
FALSE
The last step of the TPM implementation process is the integration of proactive maintenance techniques into your program.
TRUE
FALSE
Having small groups of employees to achieve regular improvements in equipment operation is what pillar of TPM?
Autonomous Maintenance
Planned Maintenance
Quality Maintenance
Focused Improvement
Applying TPM techniques to administrative functions is what pillar of TPM?
Autonomous Maintenance
Planned Maintenance
Quality Maintenance
TPM in Administration
