1.

What is the purpose of a detailed investigation?

a)

To identify responsible staff for penalisation

b)

To enable corrective actions

c)

To prevent recurrence of events

d)

All of above

2.

A bypass line and valve is to be added across a control valve for ease of maintenance, can this be carried out on subtle change?

a)

Yes

b)

No

c)

Depends on Risk Level

d)

Depends on EHS Verdict

3.

What are current approx safe-man-hours at CPL?

a)

1M

b)

2M

c)

10M

d)

20M

4.

As mentioned in DuPont Bradly Curve, what is Level 3?

a)

Good System is mostly implemented

b)

Fundamental Knowledge in organization

c)

System is implemented and being used effectively and show signs of continuous improvement

d)

None of the above

5.

If a person injured during hot work and the subject hazard was not addressed in Job Safety Analysis. Which PSM element is violated?

a)

Procedure & Performance Standard

b)

Risk Assessment & Process Hazard Analysis

c)

Incident Investigation

d)

Quality Assurance

6.

What is Safety Critical Equipment?

a)

Devices whose failure could result in a release, major fire and explosion

b)

Devices whose failure could result in a minor fire

c)

Devices whose failure could interrupt production

d)

None of the above

7.

What is D-Level at CPL?

a)

Departmental Safety Committee

b)

Toolbox talk

c)

Grass-root Safety Committee

d)

Corporate Level Committee

8.

General Managers are part of which team for Emergency Response?

a)

Emergency Squad

b)

Emergency Control Centre

c)

Rear Control

d)

none of these

9.

What is a Safety Leading Indicator?

a)

An indicator of utmost significance

b)

Safety accidents that result in loss of life or property

c)

Proactive measures that measure prevention efforts and recorded prior to an injury

d)

All of the above

10.

Which of the following is a lagging indicator

a)

An employee reporting Unsafe Conditions

b)

Audits highlighting behavioural issues in area

c)

An injury of an employee at Work

d)

All of the above

11.

Who is responsible for ensuring PSSR before commissioning of new equipment?

a)

Reliability

b)

Area Owner

c)

Projects

d)

Sub EHS Technology

12.

What is Cnergyico Safety Matrix?

a)

Database containing safety incident data at Cnergyico

b)

Portal where recommendations are marked to responsible staff

c)

Training and Development Portal at Cnergyico

d)

Incident Investigation Portal at Cnergyico

13.

If a safety critical device has to be taken out of service for PM for 2 hours during normal plant operation, what protocol should be followed at CPL?

a)

Management of Change

b)

EHS Waiver

c)

STSO

d)

LTSO

14.

A battery operated non-IS inspection equipment is to be used at Plant 1, which of the protocol should be followed?

a)

EHS Waiver & PTW

b)

EHS Dispensation & Hot Work Permit

c)

Safety Over-ride

d)

All of the above

15.

If a steam line leakage is controlled by installing a clamp on the line, what special protocol should be followed for such repairs?

a)

EHS Repairs Form

b)

EHS Dispensation Form

c)

Temporary Repair Form

d)

Sub EHS Tech