1.

SCHEMATIC DESIGN PHASE = __% of TOTAL RPF (Regular Professional Fee), including the previous phase.

a)

15%

b)

20%

c)

5%

d)

40%

2.

CONTRACT DOCUMENT PHASE = __% of TOTAL RPF, including previous phases

a)

40%

b)

90%

c)

70%

d)

100%

3.

Civil Liability = _%, Periodic Construction Supervision = _%

a)

10%, 5%

b)

5%, 10%

c)

5%, 5%

d)

10%, 10%

4.

DADS Fee in RPF is generally __% of DAEDS Fee

a)

50%

b)

30%

c)

60%

d)

80%

5.

Buildings classified as Group 1 - SIMPLE, are considered to have the most basic designs such as bakeries, public markets, armories, and service garages. What are the DAEDS and DADS RPF for a SIMPLE building with a budget of less than Php. 50 Million.

a)

10% DAEDS,

9% DADS

b)

9% DAEDS,

6% DADS

c)

8% DAEDS,

5% DADS

d)

5% DAEDS,

3% DADS

6.

Buildings classified as Group 2 - MODERATE, are considered to be more complex than SIMPLE buildings. What are the DAEDS and DADS RPF for a MODERATE building with a budget of less than Php. 50 Million.

a)

6% DAEDS,

4% DADS

b)

6% DAEDS,

3% DADS

c)

6% DAEDS,

3.6% DADS

d)

5% DAEDS,

3% DADS

7.

Buildings classified as Group 3 - EXCEPTIONAL, are the most complicated designs among the three main groups. What are the DAEDS and DADS RPF for an EXCEPTIONAL building with a budget of Php 80 Million.

a)

7% DAEDS,

4.2% DADS

b)

6% DAEDS, 3.6% DADS

c)

4% DAEDS, 2.5% DADS

d)

5% DAEDS,

3% DADS

8.

For RESIDENTIAL projects, the DAEDS RPF is __% while the DADS RPF is __%

a)

10% DAEDS,

6% DADS

b)

10% DAEDS,

5% DADS

c)

12% DAEDS,

8% DADS

d)

5% DAEDS,

3% DADS

9.

For Monumental Projects at any budget, the RPF for DAEDS is __%

a)

10%

b)

8%

c)

5%

d)

12%

10.

A client requested to re-use your set of plans for 15 residential units. For the 11th to 15th units, how much RPF should you charge if you were to provide DAEDS.

a)

40% of initial RPF each.

b)

50% of initial RPF each.

c)

25% of initial RPF each.

d)

10% of initial RPF each.

11.

A client requested to re-use your set of plans for 15 residential units. For the 2nd to 10th units, how much RPF should you charge if you were to provide DAEDS.

a)

50% of initial RPF each.

b)

60% of initial RPF each.

c)

80% of initial RPF each.

d)

90% of initial RPF each.

12.

For any Alternation/Renovation works for existing buildings belonging to Groups 1 to 5, how much RPF is the Architect entitled to?

a)

100%

b)

80%

c)

150%

d)

200%

13.

An Architect hired for Consultation as Technical Adviser is entitled to ____.

a)

5000/hour

b)

500/hour

c)

20/hr

d)

1000/hr

14.

An Architect hired for arbitration as Expert Witness is entitled to?

a)

5000/appearance

b)

500/appearance

c)

1000/appearance

d)

200/appearance + 10 jeepney fare

15.

Based on SPP203, what is the Method of Compensation for Architectural Interiors, Landscape, and Acoustics?

a)

10% to 15% x Cost of Work

b)

15% to 20% x Cost of Work

c)

5% to 10% x Cost of Work

d)

20% to 25% x Cost of Work

16.

Based on SPP203, upon submission of Final Design, the Architect is entitled to __% of the Fee, excluding the previous Fee collected from Preliminary Design.

a)

20%

b)

30%

c)

40%

d)

50%

17.

Based on SPP203, upon Completion of the Project, the Architect is entitled to __% of the Fee, excluding the previous Fees collected from Final and Preliminary Design.

a)

10%

b)

20%

c)

50%

d)

30%

18.

Based on SPP203, for Physical Planning for Building Sites. A project with an area over 50 hectares should recommend an RPF of __ per square meter.

a)

P5.00

b)

P4.00

c)

P3.00

d)

P1.50

19.

Based on SPP203, for Physical Planning for Building Sites. What is the basic rate for the first 5 hectares or less?

a)

P50,000/ hectare or P5.00 per sq.m

b)

P100,000/ hectare or P10.00 per sq.m

c)

P20,000/ hectare or P2.00 per sq.m

d)

P10,000/ hectare or P1.00 per sq.m

20.

SPP DOC 200

a)

Code of Ethical Conduct

b)

Pre-Design Services

c)

Design Services

d)

General Conditions

21.

Regular Design Services

a)

SPP DOC 201

b)

SPP DOC 202

c)

SPP DOC 203

d)

SPP DOC 204

22.

Construction Management Services

a)

SPP DOC 203

b)

SPP DOC 204A

c)

SPP DOC 204B

d)

SPP DOC 205

23.

Comprehensive Architectural Services

a)

SPP DOC 202

b)

SPP DOC 203

c)

SPP DOC 206

d)

SPP DOC 207

24.

Architectural Design Competition

a)

SPP DOC 208

b)

SPP DOC 209

c)

SPP DOC 207

d)

SPP DOC 230

25.

Method of Selection for Relatively Small Projects

a)

Direct Selection

b)

Direct Competition

c)

Comparative Selection

d)

Architectural Design Competition

26.

Post-Construction Services

a)

SPP DOC 203

b)

SPP DOC 204

c)

SPP DOC 205

d)

SPP DOC 206

27.

Method of Selection for Civic or Monumental Projects

a)

Direct Selection

b)

Direct Competition

c)

Comparative Selection

d)

Architectural Design Competition

28.

Full-Time Supervision Services

a)

SPP DOC 203

b)

SPP DOC 204A

c)

SPP DOC 204B

d)

SPP DOC 205

29.

Pre-Design Services

a)

SPP DOC 201

b)

SPP DOC 202

c)

SPP DOC 203

d)

SPP DOC 204

30.

Design-Build Services

a)

SPP DOC 203

b)

SPP DOC 204A

c)

SPP DOC 204B

d)

SPP DOC 207

31.

Method of Compensation Application for Non-Creative Work

a)

MDPE - Multiple of Direct Personnel Experience

b)

PFPE - Professional Fee Plus Expenses

c)

LS/FF - Lump Sum or Fixed Fee

d)

Per Diem, Honorarium Plus Reimbursables

32.

Method of Compensation Application for Government Projects

a)

MDPE - Multiple of Direct Personnel Experience

b)

PFPE - Professional Fee Plus Expenses

c)

LS/FF - Lump Sum or Fixed Fee

d)

Per Diem, Honorarium Plus Reimbursables

33.

Method of Compensation for Personal Time, usual MOC for SPP 209 or Professional Architectural Consulting Services

a)

MDPE - Multiple of Direct Personnel Experience

b)

PFPE - Professional Fee Plus Expenses

c)

LS/FF - Lump Sum or Fixed Fee

d)

Per Diem, Honorarium Plus Reimbursables

34.

The Recommended Professional Fee for Groups 1, 2 and 3 decreases per budget cap from <50M, 50-100M, 100-200M, 200-500M, 500M-1B, 1B+. How much % is decreased per budget cap?

a)

0.5%

b)

2%

c)

1%

d)

1.5%

35.

A client requested plans/designs for a repetitive construction project. For the 2nd, 3rd, and 4th construction, how much of the initial RPF should you charge?

a)

50% - 2nd

40% - 3rd

30% - 4th

b)

60% - 2nd

40% - 3rd

20% - 4th

c)

90% - 2nd

75% - 3rd

50% - 4th

d)

60% - 2nd

50% - 3rd

40% - 4th