Vopak Fundamental - KTSB HSE Day 2022

Total questions: 15

Worksheet time: 8mins

Name
Class
Date
1.

How many Vopak Fundamentals on Safety are there

a)

5

b)

6

c)

7

d)

8

2.

Which Fundamental has been the leading cause of fatalities in Vopak?

a)

Excavation

b)

Motorized vehicles

c)

Working at height

d)

Confined Space

3.

What action should you take if you discover a person collapsed in a tank close to the manway door?

a)

Raise the alarm, do not enter the tank and wait for help.

b)

Immediate enter into the tank without proper PPE

c)

Raise the alarm, attempt to rescue the person while you wait for help

d)

Hold your breath and enter into the tank

4.

Adding a filter to the end of a loading arm does not require the Management of Change process (MOC) to be followed.

a)

True

b)

False

5.

When is it allowed to ‘splash load’ a flammable product into a truck

a)

After completion and approval of a risk assessment and implementation of all control measures.

b)

Never, it is not allowed to splash load a flammable product.

6.

What is SDS for chemical?

a)

Safety Digital System

b)

Safety Data Sheet

c)

Safety Document System

d)

Safe Data Safety

7.

During the transfer of product, how we manage the electric static. Select two best answer

a)

Encourage splash loading

b)

Using grounding

c)

limited the flow rates

d)

No sufficient relaxation time

8.

What are the elements in the static electricity? Select two correct answer

a)

Megatron

b)

Electron & Proton

c)

Proton X70

d)

Neutron

9.

The contractor will perform drill activity using drill machine. What is the permit he required to complete his task

a)

Cold work

b)

WAH

c)

Hot Work

d)

Confined Space

10.

"ERIC PD" is the level of control the hazard. What is the "D"

a)

Decommissioning

b)

Distress

c)

Discipline

d)

Danger

11.

Who is the responsible person to performing LOTO at the electrical device?

a)

Project Engineer

b)

Mechanical Technician

c)

Electrical Technician

d)

Shift Supervisor

12.

Hierarchy of control in working at height, what is the primary control

a)

Have WAH Training

b)

Using fixed and portable platform

c)

Avoid working at height

d)

Using Safety Harness

13.

What is the minimum depth of excavation required excavation certification

a)

15mm

b)

150mm

c)

155cm

d)

150m

14.

Forklift stated the SWL is about 3 MT. What means by SWL

a)

Safety work leader

b)

Swing left

c)

the minimum load to be handled by the forklift

d)

the safe workload that can operate by the forklift

15.

Apparently, I am a healthy and need to complete an inspection in the confined space. Can i proceed with the task?

a)

Yes. With Manager approval

b)

No. Need waiver from DOSH

c)

Yes. CEO approval

d)

No.Need to have valid AESP training and declare health declaratio