Wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

AI Project Cycle

Total questions: 25

Worksheet time: 13mins

Name
Class
Date
1.

Which one of the following is the second stage of AI project cycle?

a)

Data Exploration

b)

Data Acquisition

c)

Modelling

d)

Problem Scoping

2.

Which of the following comes under Problem Scoping?

a)

System Mapping

b)

4Ws Canvas

c)

Data Features

d)

Web scraping

3.

Which of the following is not a part of the 4Ws Problem Canvas?

a)

Who?

b)

Why?

c)

What?

d)

Which?

4.

your challenge is to make sure that no unauthorised person enters

the premises. For this, you: (choose one)

a)

Get photographs of all the authorised people.

b)

Get photographs of all the unauthorised people.

c)

Get photographs of the premises in which the diamond has been kept.

d)

Get photographs of all the visitors.

5.

Among the given applications identify which is NOT an example of AI

a)

Phones with Smart Lock

b)

Google assistant

c)

Beauty filters

d)

Remote Control Drones

6.

How intelligent robots are helping us in accomplishing dangerous jobs?

a)

Lifting up heavy material at the construction site.

b)

Collecting and packaging of radioactive waste.

c)

Working in contaminated and dusty environments.

d)

All of the above

e)

None of the above

7.

Under ________ stage of AI Project Cycle, we look at various parameters which affect the problem we wish to solve so that the picture becomes clearer.

a)

Modelling

b)

Evaluation

c)

Problem Scoping

d)

Data Exploration

8.

The business or project requirements for the AI model is reviewed in

a)

Problem Scoping

b)

Data Acquisition

c)

Data Exploration

d)

Modelling

9.

What is problem scoping ?

a)

Solution of a problem

b)

Exploring the patterns put of the collected data sets

c)

Developing an algorithm for a problem solution

d)

Identifying the problem and having a vision to solve it

10.

How many SDGs have been announced by the United nations?

a)

20

b)

17

c)

2030

d)

2020

11.

The people who face the stated problem and would be benefitted from the solution are termed as

a)

Stakeholders

b)

Key Persons

c)

WHO

d)

End Users

12.

When a project is started, a person should be very clear with

a)

Problem Reasons

b)

Problem Solutions

c)

Problem Statement

d)

All of the above

13.

Problem Scoping helps in

a)

Setting the goal

b)

Identifying the problem

c)

A deeper understanding of the problem

d)

All of these

14.

The w for what in 4Ws also gather the evidence to prove that the problem you have selected actually exists.(True/False)

a)

True

b)

False

15.

The ____ helps to summarize all the key points into one single template for Problem Scoping.

a)

4ws of problem scoping

b)

Problem Statement Template

c)

Summary Template

d)

Problem Understanding Template

16.

Which of the following is not an authentic source for data acquisition?

a)

Sensors

b)

Surveys

c)

Web Scraping

d)

System Hacking

17.

Problem scoping helps in ________.

a)

setting the goal

b)

identifying the problem

c)

a deeper understanding of the problem

d)

All of these

18.

Which of the following W of 4Ws canvas problem helps in analysing the affected people directly or indirectly?

a)

Who

b)

What

c)

Where

d)

Why

19.

The beginning part of the decision tree is called _______.

a)

Leaves

b)

Root

c)

Nodes

d)

Branches

20.

_________ block helps in focuses on the situation or context the problem is located.

a)

Who

b)

What

c)

Where

d)

Why

21.

______can be collected from various sources like newspapers, cameras, observations, surveys, questionnaires and so on.

a)

Elements

b)

Connectors

c)

Data

d)

Relations

22.

The system in which elements are interconnected and one must understand the elements and relationships between the elements to understand the system is called ______.

a)

Maps

b)

System maps

c)

Images

d)

Data

23.

__________ data is used to assess the AI machine for its efficiency and performance.

a)

Testing data

b)

Training data

c)

Data features

d)

System

24.

Each problem is associated directly or indirectly with some factors. These factors are known as _________

a)

Problem features

b)

Data features

c)

Data factors

d)

Problem factors

25.

__________refers to the method of designing a model of real system.

a)

Evaluation

b)

Modelling

c)

Data acquisition

d)

Data exploration