wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

PRE-TEST TYPE B

Total questions: 15

Worksheet time: 8mins

Name
Class
Date
1.

    The manufacturing process is to make a product with high value added that fill all the specification and all the functional aspect is the … of manufacturing processs

a)

Function

b)

Goal

c)

Explanation

d)

Description

2.

Processing operations apply heat, mechanical force, or a combination of these to effect a change in geometry of the work material is the meaning of…

a)

    Shapping Process

b)

Property - enhancing processes

c)

  Surface processing operation

d)

Processing operation

3.

Which one from the following statements about Manual Process Planning is incorrect? 

a)

Deficiency productivity of process planner

b)

Lack of legibility

c)

High-cost task

d)

Low-cost task

4.

  Operation Process Chart (OPC) is diagram that illustrates the process step will be experienced by raw materials regarding the sequence of operations and checks from the start become a complete product or as a component, and contains information needed for further analysis continued is definition by….

a)

(Sutalaksana, 2006)

b)

     (Sutalaksana, 2016)

c)

J T. Black (2015)

d)

Scallan P (2003)

5.

Based on the picture, what is the name of the symbol in OPC ?

a)

  Storage

b)

   Transportation

c)

Inspection

d)

Operation

6.

How many steps are there process planning?

a)

10

b)

  11

c)

9

d)

   12

7.

The first step of process planning is …

a)

Prepare the final process plan document. Make a routing sheet

b)

Identify Datum Surface

c)

  Study the overall shape of the part

d)

Determine the best raw material shape to use

8.

Moving from a particular position and same point, and used to determine the position or location of a point on a flat plane is the meaning of…

a)

Absolute Coordinates

b)

Incremental Coordinates

c)

Coordinates

d)

Absolute

9.

  How many kinds of milling operations?

a)

Three

b)

Seven

c)

Ten

d)

  Eleven

10.

Based on the picture, what is the name of the turning process?

a)

Cut off

b)

Threading

c)

   Grooving

d)

  Finishing

11.

From the picture in above, what is the name of process machine…

a)

Milling

b)

Drilling

c)

Threading

d)

Turning

12.

   CAPP stand for…

a)

  Computer Aided Process Planning

b)

   Computer Aided Planning Process

c)

Controlling Aided Planning Process

d)

Controlling Aided Process Planning

13.

Based on the picture, what is the determine the Y coordinate in absolute coordinate! 

a)

   (4,3)

b)

   (3,4)

c)

  (4,0)

d)

    (3,0)

14.

Vice Used to clamp an object securely in order for construction to be completed on it.

a)

True

b)

   False

15.

Tm = (0,3d)+lfr\frac{\left(0,3d\right)+l}{fr}  This formula used to calculate?

a)

Turning

b)

Drilling

c)

    Milling

d)

   Threading