wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

ARECL BLQ1

Total questions: 20

Worksheet time: 20mins

Name
Class
Date
1.

CHAPTER 1 of PD 1096

a)

TITLE

b)

GENERAL PROVISION

c)

ADMINISTRATION AND ENFORCEMENT

d)

ADMINISTRATION AND REINFORCEMENT

2.

CHAPTER 2 of PD 1096

a)

ADMINISTRATION AND ENFORCEMENT

b)

ADMINISTRATION AND REINFORCEMENT

c)

RESPONSIBILITIES FOR ADMINISTRATION AND REINFORCEMENT

d)

DEFINITIONS

3.

CHAPTER 3 of PD 1096

a)

PERMITS AND INSPECTION

b)

BUILDING

PERMITS AND INSPECTION

c)

PERMISSIONS AND INSPECTIONS

d)

BUILDING PERMITS AND OFFICIALS

4.

CHAPTER 4 of PD 1096

a)

REQUIREMENTS FOR FIRE ZONES

b)

FIRE RESISTIVE REQUIREMENTS IN CONSTRUCTION

c)

REQUIREMENTS ON TYPES OF CONTRUCTION

d)

TYPES OF CONSTRUCTION

5.

CHAPTER 5 of PD 1096

a)

SANITATION

b)

FIRE RESISTIVE REQUIREMENTS IN CONSTRUCTION

c)

BUILDING PROJECTION OVER PUBLIC STREETS

d)

REQUIREMENTS FOR FIRE ZONES

6.

CHAPTER 6, 7, and 8 of PD 1096 consecutively

a)

FIRE RESISTIVE REQUIREMENTS IN CONSTRUCTION, CLASSIFICATION AND GEN. REQ. OF ALL BUILDING BY USE OR OCCUPANCY, AND LIGHT AND VENTILATION

b)

SANITATION, CLASSIFICATION AND GEN. REQ. OF ALL BUILDING BY USE OR OCCUPANCY, AND LIGHT AND VENTILATION

c)

BUILDING PROJECTION OVER PUBLIC STREETS, CLASSIFICATION AND GEN. REQ. OF ALL BUILDING BY USE OR OCCUPANCY, AND LIGHT AND VENTILATION

d)

GLASS AND GLAZING, CLASSIFICATION AND GEN. REQ. OF ALL BUILDING BY USE OR OCCUPANCY, AND LIGHT AND VENTILATION

7.

RULE IX of Revised IRR of PD 1096

a)

LIGHT & VENTILATION

b)

SANITATION

c)

BUILDING PROJECTION OVER PUBLIC STREETS

d)

SANITATION AND WATER SUPPLY

8.

RULE XII of Revised IRR of PD 1096

a)

GENERAL DESIGN AND CONSTRUCTION REQUIREMENTS

b)

SIGNS

c)

PLASTICS

d)

GLASS AND GLAZING

9.

An act to ordain and Institute a National Building Code of the Philippines

a)

PD 1096

b)

RA 9266

c)

RA 6541

d)

PD 455

10.

The president who ordered and decreed the revision of RA 6541

a)

FIDEL RAMOS

b)

GLORIA MACAPAGAL ARROYO

c)

FERDINAND E. MARCOS

d)

DIOSDADO MACAPAGAL

11.

Issuance of original PD 1096

a)

Feb 19, 1977

b)

March 17, 2004

c)

April 10, 2004

d)

November 15, 2004

12.

Any new construction which increases the height and/or floor area of existing buildings/structures.

a)

INCORPORATION

b)

IMPROVEMENT

c)

ADDITION

d)

ENLARGEMENT

13.

the Executive Officer of the OBO appointed by the Secretary.

a)

BUILDING ADMINISTRATION

b)

BUILDING OFFICIAL

c)

BUILDING INSPECTOR

d)

BUILDING MANAGER

14.

PD 1096, otherwise known as the National Building Code of the Philippines

a)

LAW

b)

CODE

c)

BUILDONG CODE

d)

BILL

15.

The personnel of the National Building Code Development Office (NBCDO)

a)

OBO

b)

CREW

c)

MEMBER

d)

STAFF

16.

The transfer of buildings/structures or portion/s thereof from original location or position to another, either within the same lot or to a different one.

a)

MOVING

b)

RELOCATION

c)

TRANSPORTATION

d)

REPLACEMENT

17.

RULE I of Revised IRR of PD 1096

a)

shall be known and cited as the "Revised Implementing Rules and Regulations of the National Building Code of the Philippines"

b)

shall be a filipino citizen and of good moral character

c)

GENERAL PROVISION

d)

Declaration Policy

18.

"The land or site upon which will be constructed any building or structure, or any ancillary or auxiliary facility thereto, shall be sanitary, hygienic or safe."

a)

SANITATION

b)

SITE REQUIREMENTS

c)

GENERAL BUILDING REQUIREMENTS

d)

SCOPE

19.

All on-site work done in the site preparation, excavation, foundation, assembly of all the components and installation of utilities, machineries and equipment of buildings/structures.

a)

CONSTRUCTION

b)

BUILDING CONTRACTOR

c)

ACTIVITIES

d)

BUILDING PROCESS

20.

Head or Chief Executive Officer of DPWH

a)

HONORABLE

b)

CAPTAIN

c)

CHAIRMAN

d)

SECRETARY