Font size
WorksheetsBMK Ultra Plus Quiz-D3
Total questions: 6
Worksheet time: 6mins
1. Which of the following actions you must do before replacing UV sleeve and UV bulb during PM.
Choose all that apply.
Turn off power of instrument and unplug the power cable of instrument, wait for 15mins to cool down the UV bulb.
Turn on waste direct valve in waste capture module to drain the waste
Drain the waste in weir trap through the ball valve
Wear gloves before handling
2. What are the new components found in Ultra Plus waste capture module?
Choose all that apply.
LCS waste direct valve
LCS Ultrasonic waste sensor
20L waste carboy detect sensor
Carboy locking cylinder
3. Which components need to replace during PM?
Choose all that apply.
Compressor muffler and silencer
High pressure inline check valve
Reservoir inline filters
UV bulb and sleeve
Exit manifold overflow screws
4. What is the function of UV sensor?
Acts as a barrier between waste fluid and the UV bulbtion 1
Generate UV light to degrade or neutralize the waste
Monitors the UV wavelength of the bulb and will cause an error message if the signal is too low
5. What are the functions of the Audible alert PCB?
Provide I/O to status lights.
Power to the integrated touchscreen LUI monitor
Power to the Reagent hood solenoid
Power to the Reagent hood sensor
6. In Ultra Plus installation procedure, we need to pour DI water into weir trap,
how to do this action?
Pour DI water from waste tub
Pour DI water from waste tub first, then UV system
Pour DI water from UV system
Pour DI water from UV system first, then waste tub
