wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

Design Process

Total questions: 10

Worksheet time: 5mins

Name
Class
Date
1.

Max has re-worked the floorplan based on his clients request and is meeting this afternoon for approval of the new plan.

a)

Phase 1 - Programming

b)

Phase 2 - Schematic Design

c)

Phase 3- Design Development

d)

Phase 4 - Contract Documents

e)

Phase 5- Contract Administration

2.

Aaron is scheduling the contractors to come work on the dental office he designed.

a)

Phase 1 - Programming

b)

Phase 2 - Schematic Design

c)

Phase 3- Design Development

d)

Phase 4 - Contract Documents

e)

Phase 5- Contract Administration

3.

Emily goes back to her office to explore possible design solutions after meeting with her client about a new café plan.

a)

Phase 1 - Programming

b)

Phase 2 - Schematic Design

c)

Phase 3- Design Development

d)

Phase 4 - Contract Documents

e)

Phase 5- Contract Administration

4.

Tristan draws out the initial design for his client’s hotel and creates a projected budget including furniture, fixtures, and equipment.                                                             

a)

Phase 1 - Programming

b)

Phase 2 - Schematic Design

c)

Phase 3- Design Development

d)

Phase 4 - Contract Documents

e)

Phase 5- Contract Administration

5.

Isabella meets with her client to go over the design that she created for his new bathroom addition.                                                           

a)

Phase 1 - Programming

b)

Phase 2 - Schematic Design

c)

Phase 3- Design Development

d)

Phase 4 - Contract Documents

e)

Phase 5- Contract Administration

6.

While meeting with her client, Aminu creates a bubble diagram to get a picture of her client’s space needs.                                         

a)

Phase 1 - Programming

b)

Phase 2 - Schematic Design

c)

Phase 3- Design Development

d)

Phase 4 - Contract Documents

e)

Phase 5- Contract Administration

7.

Anh is scheduling the move-in date for her client’s new school building. She has completed the last walk through with the client and is evaluating their feedback.                                 

a)

Phase 2 - Schematic Design

b)

Phase 3- Design Development

c)

Phase 4 - Contract Documents

d)

Phase 5- Contract Administration

e)

Phase 6- Move- In and Post Occupancy

8.

Tierra takes her brainstorming ideas and creates preliminary space plans for the rehabilitation clinic she is designing.  

a)

Phase 2 - Schematic Design

b)

Phase 3- Design Development

c)

Phase 4 - Contract Documents

d)

Phase 5- Contract Administration

e)

Phase 6- Move- In and Post Occupancy

9.

After meeting with the client about needs for their new house, Kristen does an  

  inventory of the existing furniture to determine what can still be used.

a)

Phase 1 - Programming

b)

Phase 2 - Schematic Design

c)

Phase 3- Design Development

d)

Phase 4 - Contract Documents

e)

Phase 5- Contract Administration

10.

Juanita creates the specification book for the corporate office she is designing.

a)

Phase 2 - Schematic Design

b)

Phase 3- Design Development

c)

Phase 4 - Contract Documents

d)

Phase 5- Contract Administration

e)

Phase 6- Move- In and Post Occupancy