1.

Item of Work for Riprap and Grouted Riprap for Volume III Projects

a)

1701

b)

1710

c)

1711

d)

1714

2.

Density in kg/m3 of recycled broken concrete that can be used as an alternative for riprap stones

a)

2245

b)

2425

c)

2254

d)

2452

3.

Classification or riprap with stones ranging from 30 kg to 70kg with 50% of the stones more than 50kg

a)

A

b)

B

c)

C

d)

D

4.

Type of pipe that shall be used as weepholes

a)

pvc

b)

gi pipe

c)

ppr

d)

hdpe

5.

Placing of riprap stones shall be PERPENDICULAR to the slope

a)

TRUE

b)

FALSE

6.

The minimum thickness in mm of Class C riprap is

a)

500

b)

600

c)

700

d)

800

7.

The minimum diameter of weepholes shall be

a)

1in

b)

2in

c)

4in

8.

In the construction of grouted riprap, the face of the stones shall not be left exposed

a)

True

b)

False

9.

Minimum thickness in mm of cement mortar in grouted riprap

a)

19

b)

20

c)

22

d)

25

10.

Pay item number for Riprap, Class A

a)

505 (1)a

b)

505 (a)1