NEW
Font size
WorksheetsOM_SBENT3C_Q2
Total questions: 15
Worksheet time: 11mins
Which of the statement does not define Work study?
Work study aims to measures time and motion to ensure productivity.
Work study is an examination of human work in all its contexts.
Work study can only be applied in production department which produces a product.
One of the statements below is correct about the Motion study.
Motion study uses a stopwatch as a measurement tool.
Motion study involves observation and recording of time in accomplishing a certain task.
The motion study purpose is to reduce the wastage of time and energy in unnecessary movement.
One of the statements below is not correct about time study.
Time study tracks time consumed in accomplishing each part of an operation.
Time study aims to identify the standard time required to perform a task.
Time study uses surveillance camera in identifying the time for operations.
Identify if the statement is correct or not: An organization can control external factors like structural adjustments, natural resources, government, and infrastructure to achieve productivity and profitability.
The statement is correct
The statement is not correct
Identify if the statement is correct or not: An organization may achieve productivity and profitability by controlling its internal factors like product factor, plant, equipment, materials, and energy.
The statement is not correct
The statement is correct
A production plan refers to the programming of workloads in the process of production.
ADVANCED SCHEDULE AND PLAN
MASTER SCHEDULE
SCHEDULING
Refers to a production plan wherein production capacity and raw materials are allocated to meet the demand.
ADVANCED SCHEDULE AND PLAN
MASTER SCHEDULE
SCHEDULING
Identify if the statement is correct or not: Fluctuating or unstable supply of product available for sale is one good example of an effective production plan.
The statement is not correct
The statement is correct
Identify if the statement is correct or not: In crafting a production plan area to be considered are manpower, machine, materials, and method.
The statement is correct
The statement is not correct
Identify if the statement is correct or not: High wastages and overstock of raw materials is a result of an effective production plan.
The statement is correct
The statement is not correct
Refers to a pictorial diagram showing the possible cause and effects of a process.
Fishbone Diagram
Flowcharts
Histograms
Which of the statement does not define Total Quality Management (TQM)?
TQM is the responsibility of the top management.
TQM is a proactive approach of preventing problems to happen.
TQM is a well-known idea aims to continuously improving the products and processes.
An arrangement based on the sequence of operations during the manufacturing of a good or delivery of a service.
Product Lay-out
Facility Layout
Process Selection
Refers to the specific arrangement of physical facilities. Facility design must be integrated withsupport job and process design.
Process Lay-out
Process Selection
Facility Lay-out
Refers to linear arrangement of workstations to produce a specific
product.
Product Lay-out
Process Lay-out
Facility Lay-out
