Wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Construction Docs

Total questions: 10

Worksheet time: 5mins

Name
Class
Date
1.

What is the list of drawings (or table of contents) at the beginning of a construction document set called? 

a)

Sheet Index

b)

Drawing List

c)

Table of Contents

d)

Drawings Included

2.

How are construction documents sets organized?

a)

There is not a standard organization for order, so it depends on the firm. 

b)

From the most detailed information to the most general, or broad information.

c)

From the most general information down to the smallest details. 

d)

Plans, Details, Elevations, then Renderings.

3.

What is the drawing called that shows a code reviewer how people are able to safely egress through your proposed space plan?

a)

Construction Plan

b)

Space Plan

c)

Life Safety Plan

d)

Exit Map

4.

What is the difference between a schedule and a specification?

a)

A specification is a more general list that typically refers to a more detailed set of schedules. 

b)

A schedule is a more general list that typically refers to a more detailed set of specifications. 

c)

There is no difference between these two things. They are two words for one thing.

d)

Contractors don't look at specifications; they only use schedules. 

5.

NIC is the standard abbreviation for what?

a)

North in Construction

b)

Not in Code

c)

Noted in Contract

d)

Not in Contract

6.

Symbols on drawings from different firms always look exactly they same. 

a)

TRUE

b)

FALSE

7.

It is possible to over-dimension plans or elevations and create constraints that are impossible for the contractors to build. 

a)

TRUE

b)

FALSE

8.

What types of general information is often included at the front of a drawing set?

a)

General symbols and abbreviations used throughout the drawing set.

b)

ADA diagrams showing typical mounting and installation heights.

c)

Local code and location information for the project.

d)

All previous answers

9.

Mill-work details do not show the finishes of the custom piece. This information is only shown on the finish plan. 

a)

TRUE

b)

FALSE

10.

General notes are general per drawing type (for example, all partition plans share the same notes), while sheet notes are specific to a single sheet. 

a)

TRUE

b)

FALSE