NEW
Font size
WorksheetsPlumbing L1 7202 104
Total questions: 10
Worksheet time: 5mins
1. Why should Manufacturers instruction should be referred to and followed?
You can receive a refund if not happy with the item
The installation is not dangerous
You can earn more money
Customer will refer you to others
What is the purpose of the Job Specification document?
To show how components fit within a circuit
To help when ordering materials
To show what work is being carried out, when, and by whom.
To illustrate the correct PPE required.
What is an elevation of a building?
It tells you where to find the elevators
the above view of a building or area
A view of a building or an object for example rear elevation, front elevation or side elevation
When a building is lifted and relocated.
What is meant by the term “First Fix” in construction?
repairing a leak before commissioning a system
The first repair that you carryout for the day
The first time you work at a customer's property
The initial work that is carried out for each trade. Plumbers will run their pipework to the required positions
What part of the Building Regulations deals with the notching depths of a joist?
Part T
Part A
Part Z
Part R
Give a task that an electrician would carry out whilst second fixing a domestic property
Running cables for sockets
Changing a plug
Fitting light switches
Installing Trunking
1. What is the maximum that you the maximum depth that a joist may be notched?
1/8
1/4
1/3
1/2
How should you protect a customer's property?
Bring your dog to work
Place dust sheets down before you start work
Turn the water off
Ask a colleague for help
Which two tools that could be used to lift a floorboard
Hammer and Stanley Knife
Hammer and Wood Chisel
Hammer and Crowbar
Floorboard Chisel and hammer
What is the best way to promote good working relationships with other trades
Setting up a lottery syndicate
Regular site meetings and solving disputes soon as possible
Profit sharing schemes
Completing each other's work