wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

CIMS & MSQos Quiz 2022

Total questions: 10

Worksheet time: 5mins

Name
Class
Date
1.

When did MCMC has started develop the Communication Infrastructure Management System (CIMS)?

a)

2010

b)

2012

c)

2015

d)

2020

2.

How many reporting are required for TM Tech to submit in Communication Infrastructure Management System(CIMS)?

a)

3

b)

5

c)

2

d)

4

3.

How many internal stakeholders in TM Tech are in direct contact with Regulatory for data and reporting purposes?

a)

4

b)

3

c)

2

d)

5

4.

Which law is correct under the Communication Infrastructure Management System (CIMS) compliance and penalty? 

a)

Broadcasting Act (1998) and Telecommunications Act (1950).

b)

National policy for Communications and Multimedia Strategy 1997

c)

Communications and Multimedia Act 1998 (CMA98) and Communication and Multimedia Spectrum Regulation 2000

d)

Multimedia Commission Act 1999 and Multimedia Communications Act 1998

5.

How many Layers in Mobile Network (MN) need to be uploaded in the Communication Infrastructure Management System (CIMS)?

a)

3

b)

5

c)

4

d)

2

6.

What is the MSQoS WBAS Standard for Wireless Broadband Throughput?

a)

Not less than 2.5Mbps , 90% of samples

b)

Not less than 2.5Mbps , 80% of samples

c)

Not less than 2.0Mbps , 80% of samples

d)

Not less than 2.0Mbps , 90% of samples

7.

Which of the following MSQoS WBAS Standard is not true?

a)

Network latency must be not more than 150ms, 90% of samples

b)

Packet loss is not less 0.5% based on average of test samples

c)

PRB utilization must be not more than 80%

d)

Backhaul utilization must be not more than 80%

8.

Which of the following is not true?

a)

The MSQoS WBAS Standards for measurement shall be enforced per location

b)

The MSQoS WBAS Standards for PRB utilization shall be enforced per base station

c)

The MSQoS WBAS Standards for backhaul utilization shall be enforced per base station

d)

The MSQoS WBAS Standards for measurement shall be enforced by average yearly measurement result

9.

Which of the following MSQoS PCS Standard is not true?

a)

Call setup success rate (CSSR) must be not less than 98% of intra-network and inter-network

b)

Call setup success rate (CSSR) must be not less than 90% of intra-network and inter-network

c)

Dropped call rate (DCR) must be not more than 2% before year 2023

d)

Dropped call rate (DCR) must be not more than 1% in year 2023 onwards

10.

Which of the following should TM Tech do after receiving a 51(2) non-compliance (NC) notice for MSQoS WBAS from MCMC?

a)

Submit the reason of NC, improvement plan with timeline to MCMC

b)

Submit dispute to MCMC

c)

Ignore the NC notice

d)

Pay penalty to MCMC