Wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

data down

Total questions: 6

Worksheet time: 30mins

Name
Class
Date
1.

SLA for Data Down first Escalation is

a)

2 hours

b)

one day

c)

2 days

d)

one working day

2.

Power LED is down first step to

a)

try in another wall-plug

b)

Check Availability to check with another CPE and its orignal adapter

c)

Direct Customer to CSO to check CPE

d)

confirm Orignal adapter is used

3.

Data down case escalated to

a)

NOC

b)

IU Maintenance

c)

Pilot-SlS

d)

FO-Fiber

4.

Adsl led down and there is 3 logs exist during last 12 hours with minimum 1 log during last 3 hours , Escalated as

a)

Data Down only

b)

Instability Case

c)

Data and Voice down

d)

Voice Down only

5.

SELT [way of detection that problem from our side] :

For Exchange SELT result :

a)

less than or equal 150 meter

b)

less than or equal 10 meters

c)

less than or equal 40 meters

d)

More than or equal 10 meters

6.

customer Has bill more or equal to 30 EGP passed grace period

CCA should

a)

Handle case Normally

b)

troubleshoot without escalation and inform the customer to pay his bills first

c)

Don't troubleshoot and inform the customer that he has to pay his bills first