ASSESSMENT SLA - PPA

Total questions: 10

Worksheet time: 5mins

Name
Class
Date
1.
1. Which of the following is the correct formula for the calculation of "Energy Payment”?
a)
VOR + (FP x NEO)
b)
FP + (FOR x NEO)
c)
FP + (VOR x NEO)
d)
FP + (Heat Rate x NEO)
2.
2. What does FOR stand for?
a)
Fixed Operation Rate
b)
Fixed Onsite Return
c)
Fixed Operating Rate
d)
Flexible Operating Rate
3.
3. How much is the typical penalty imposed for a "Failure of Dispatch Instruction"?
a)
RM35,000 per FDI for Combined Cycle Plant
b)
RM45,000 per FDI for Combined Cycle Plant
c)
RM25,000 per FDI for Open Cycle Plant
d)
RM35,000 per FDI for Open Cycle Plant
4.

4. Which of the following attachments contain technical information in current station SLA?

i) Appendix A

ii) Appendix K

iii) Appendix G

iv) Appendix B

a)

i & ii

b)

i & iv

c)

iii & iv

d)

i, ii & iv

5.

5. Which of the following is a situation that could cause FDI?

i) Failed to achieve declared capacity

ii) Failed to synchronized the facility within stipulated time

iii) Tripped during startup

iv) Tripped during changeover from synchronized condition to generation mode within the stipulated time

a)

i & ii

b)

ii & iii

c)

iii & iv

d)

i, ii, iii & iv

6.
6. Why SLA is required in TNB power plants?
a)
To establish a comparison platform for TNB plants
b)
To be the reference document for the Energy Commission and TNB Management
c)
To control the actions or decisions taken by the station
d)
On orders from the Energy Commission
7.
7. What does CRF stand for?
a)
Capacity Rate Fund
b)
Capacity Rate Finance
c)
Collective Return Fund
d)
Collective Rate Financial
8.

8. Which of the following are among the elements contained in the Energy and Capacity Payment?)

i) ASAC

ii) Force Majeure

iii) CRF

iv) Fuel Payment

a)

i & ii

b)

ii & iii

c)

iii & iv

d)

i, ii, iii & iv

9.
9. What does VOR stand for?
a)
Variable Operation Rate
b)
Variable Operating Return
c)
Variable Operating Result
d)
Variable Operating Rate
10.
10. Which of the following attachments contain station’s commercial information for the Generating Facility?
a)
Appendix A
b)
Appendix C
c)
Appendix G
d)
Appendix H