DAY 1 Morning (Coaching)

Total questions: 70

Worksheet time: 36mins

Name
Class
Date
1.

The architect's responsibilities in relation to the people: He shall not use ____ advertisement, nor use self-laudatory, exaggerated, or misleading publicity.

a)

Free

b)

Paid

c)

Sponsored

d)

Remunerated

2.

The architect's responsibilities in relation to his/her client: The Architect's honesty of purpose must be beyond reproach; he/she acts as ___________ to his/her client.

a)

Mediator

b)

Professional Adviser

c)

Representative

d)

Manager

3.

The architect's responsibilities in relation to the contractor: He shall promptly inspect each phase of the work completed and if found according to the terms of the Contract Documents, issue the ___________________, respectively, to the Contractor.

a)

Certificates of Payment

b)

Compensation

c)

Final Certificate of Completion

4.

The architect's responsibilities in relation to manufacturers, dealers, and agents: He shall not solicit ________ services from manufacturers or suppliers of building materials or equipment when these are accompanied by an obligation detrimental to the best interest of the Client, or which may adversely affect the Architect's professional opinion.

a)

Complimentary

b)

Free

c)

Technical

d)

Paid

5.

The architect's responsibilities in relation to his/her colleagues: He shall not render professional services without a __________. He/she shall neither offer nor provide preliminary services on a conditional basis prior to definite agreement with the Client for the commission of the project.

a)

Contract

b)

Verbal agreement

c)

Service agreement

d)

General condition

6.

The last phase in a Design-Build Service.

a)

Construction Phase

b)

Post Construction Training

c)

Bidding Document Phase

d)

Occupancy Permitting Phase

7.

Where the Architect is engaged to render opinion or give advice, clarifications or explanation on technical matters pertaining to his profession, the chargeable RPF shall not be less than __________ per hour.

a)

1,000

b)

2,000

c)

3,000

d)

5,000

8.

When the suspension of construction exceeds a period of _______, the fee for the remaining works shall be doubled.

a)

3 months

b)

6 months

c)

1 year

d)

2 years

9.

Additional service done by architects in design build

a)

Post construction training

b)

Construction administration

c)

Bidding phase

d)

Occupancy permitting phase

10.

A style of architecture in Greece in which a beam forms the constructive feature

a)

Trabeated

b)

Exedrae

c)

Ionic

d)

Doric

e)

Corinthian

11.

A gate or portal that serves as a monumental entrance found in islamic buildings and / or city.

a)

Ivan

b)

Bab

c)

Chattri

d)

Serai

e)

Calipin

12.

An intricate style in the early phase of the Early period of Spanish architecture of the later 15th and 16th century named after its likeness to silver work.

a)

Manueline

b)

Escorial

c)

Plateresque

d)

Churrigueresque

e)

Antiquarian

13.

Term we use to refer to a dome wherein the dome and the pendentive are part of the same sphere.

a)

Simple

b)

Compound

c)

Melon - shaped

d)

Onion

e)

Waggon

14.

Term we use to refer to a dome that is made up of curved flutings.

a)

Simple

b)

Compound

c)

Melon - shaped

d)

Onion

e)

Waggon

15.

Extra copies of contract documents are chargeable to ____

a)

Owner

b)

Architect

c)

Bidder

d)

Contractor

16.

The clearance between the established grade of the street and/ or sidewalk and the lowest under surface of any part of the balcony shall not be less than, in meters.

a)

2.40

b)

2.70

c)

3.00

d)

3.20

17.

A voluntary dispute resolution process in which one or more persons appointed to render an award, appointed in accordance with the agreement of the parties, or rules promulgated pursuant to this Act, resolve a dispute by rendering an award.

a)

Arbitration

b)

Mediation

c)

Conciliation

d)

Early Neutral Evaluation

18.

How many safety inspectors are required in hazardous workplaces with 51-200 workers, based on occupational safety and health standards?

a)

1

b)

2

c)

3

d)

4

e)

A safety inspector is not required for hazardous workplaces with 200 or fewer workers

19.

Which of the following is classified as a hazardous workplace?

 

a)

Hospital

b)

Construction site

c)

Commercial building

d)

Hotel

e)

Shopping center

20.

Who issues the CEI?

a)

OBO

b)

Professional Electrical Engineer

c)

Master Electrician

d)

Meralco

e)

NGCP

21.

Which is not included in the scope of services of Building and Facilities Administration?

a)

Building Maintenance

b)

Grounds and Landscaping Supervision

c)

Post Construction Evaluation

d)

Building Equipment Maintenance

e)

Business Development and Maintenance

22.

In this post-construction service, the architect evaluates the initial design program against the actual use of the facility.

a)

Post Construction Evaluation

b)

Building Maintenance

c)

Building Appraisal

d)

Building Utilization Study

e)

Design Program Review

23.

When the owner hires an architect or a firm to coordinate the whole range of Comprehensive Architectural Services, this constitutes

a)

Project Management

b)

  Project Coordination

c)

Comprehensive Architectural Services

d)

Construction Management

e)

Architectural Services Coordination

24.

Situation: Paulina is a 23-year-old architecture graduate from a prestigious university who is preparing to take the Architects’ Licensure Examinations. She was asked by her grandfather to design a new house that he was planning to construct in the province. Paulina came up with an original floor plan but in order to save time, she mostly copied the façade of a house designed by Architect Lenny, her college professor who gave his students copies of the plans of that house for a class exercise.  Paulina prepared the detailed plans and the specifications but since she is not a licensed architect yet, she asked her cousin Ariel, who is a civil engineer, to sign and seal the plans for the purposes of obtaining a building permit. A permit was eventually issued, and construction of the house commenced.

Analyze Paulina’s acts. Did she practice architecture?

a)

Yes, because designing and preparing the plans for a house constitute practice of architecture.

b)

No. Paulina is not a licensed architect so her acts cannot be considered as constituting practice of architecture.

c)

No, because she only prepared the plans, but she did not sign and/or seal them.

d)

Yes, because she has already finished her architecture degree. Hence, her acts constitute practice of architecture.

e)

Both A and B

25.

Situation: Paulina is a 23-year-old architecture graduate from a prestigious university who is preparing to take the Architects’ Licensure Examinations. She was asked by her grandfather to design a new house that he was planning to construct in the province. Paulina came up with an original floor plan but in order to save time, she mostly copied the façade of a house designed by Architect Lenny, her college professor who gave his students copies of the plans of that house for a class exercise.  Paulina prepared the detailed plans and the specifications but since she is not a licensed architect yet, she asked her cousin Ariel, who is a civil engineer, to sign and seal the plans for the purposes of obtaining a building permit. A permit was eventually issued, and construction of the house commenced.

Paulina’s neighbor Santino, who is a physician, found out about what Paulina did and wanted to report her to the authorities for the unauthorized practice of architecture. Who may report such offenses?

a)

Only licensed architects may file such a report

b)

Only the public prosecutor may file such a report

c)

Only persons who directly suffered losses or damages may file such a report

d)

   Anyone may file such a report

e)

Both B and D

26.

Situation: Paulina is a 23-year-old architecture graduate from a prestigious university who is preparing to take the Architects’ Licensure Examinations. She was asked by her grandfather to design a new house that he was planning to construct in the province. Paulina came up with an original floor plan but in order to save time, she mostly copied the façade of a house designed by Architect Lenny, her college professor who gave his students copies of the plans of that house for a class exercise.  Paulina prepared the detailed plans and the specifications but since she is not a licensed architect yet, she asked her cousin Ariel, who is a civil engineer, to sign and seal the plans for the purposes of obtaining a building permit. A permit was eventually issued, and construction of the house commenced.

Assuming that Santino is authorized to report Paulina for the unauthorized practice of architecture, to whom should he report her?

a)

The PRC

b)

The PRBArch

c)

  The Regional Trial Court

27.

Situation: Paulina is a 23-year-old architecture graduate from a prestigious university who is preparing to take the Architects’ Licensure Examinations. She was asked by her grandfather to design a new house that he was planning to construct in the province. Paulina came up with an original floor plan but in order to save time, she mostly copied the façade of a house designed by Architect Lenny, her college professor who gave his students copies of the plans of that house for a class exercise.  Paulina prepared the detailed plans and the specifications but since she is not a licensed architect yet, she asked her cousin Ariel, who is a civil engineer, to sign and seal the plans for the purposes of obtaining a building permit. A permit was eventually issued, and construction of the house commenced.

If Paulina were to be charged in Court, what would she be guilty of and what is the penalty?

a)

Misdemeanor. Fine of P100k-P5M, or imprisonment of 6 months to 6 years, or both, at the discretion of the Court

b)

Malpractice. Fine of P100k-P5M, or imprisonment of 6 months to 6 years, or both, at the discretion of the Court

c)

Illegal practice of a profession. Fine of P200k-P10M, or imprisonment of 6 months to 3 years, or both, at the discretion of the Court

d)

Infringement. Fine of P200k-P10M, or imprisonment of 6 months to 3 years, or both, at the discretion of the Court

e)

Usurpation of office. Fine of P200k-P10M, or imprisonment of 6 months to 3 years, or both, at the discretion of the Court

28.

Situation: Paulina is a 23-year-old architecture graduate from a prestigious university who is preparing to take the Architects’ Licensure Examinations. She was asked by her grandfather to design a new house that he was planning to construct in the province. Paulina came up with an original floor plan but in order to save time, she mostly copied the façade of a house designed by Architect Lenny, her college professor who gave his students copies of the plans of that house for a class exercise.  Paulina prepared the detailed plans and the specifications but since she is not a licensed architect yet, she asked her cousin Ariel, who is a civil engineer, to sign and seal the plans for the purposes of obtaining a building permit. A permit was eventually issued, and construction of the house commenced.

Architect Lenny later recognized that the façade design was copied from his own design. Does he have the right to have the construction of the house stopped?

a)

Yes, because his design was copied without his permission.

b)

No, because the design is not 100% the same.

c)

No, because even though the façade is mostly the same, the plans are different.

d)

  Yes, but only if he can prove that it was the whole design that was copied.

e)

  Yes, but only if he can prove that at least 50% of the façade design elements were copied.

29.

From Figure 2, identify the ornament A:

a)

Meander

b)

Fret

c)

Chevron

d)

Herringbone

e)

Imbrication

30.

From Figure 2, identify the ornament B:  

a)

Meander

b)

Fret

c)

Chevron

d)

Herringbone

e)

Imbrication

31.

From Figure 2, identify the ornament C:

a)

Meander

b)

Fret

c)

Chevron

d)

Herringbone

e)

Imbrication

32.

From Figure 2, identify the ornament D:

a)

Meander

b)

Fret

c)

Chevron

d)

Herringbone

e)

Imbrication

33.

Situation: Charlie invited Anna, an architect, to meet over coffee to discuss a potential restaurant project. They agreed on a fee payable to Anna for the time she will spend discussing the project with Charlie. During the meeting, Charlie was impressed by Anna’s clear expertise in designing restaurants and decided to commission Anna to design the restaurant for him. They signed a service agreement and Anna started working on the design for Charlie. However, while Anna was working on the design several months later, the COVID-19 pandemic broke out. Charlie started to worry if the project was still a good idea, so he asked Frank, an accountant, to do a feasibility study in order to help him decide on whether to continue with the project or not. Frank submitted his report, recommending that Charlie cancel the project because of the market conditions brought about by the pandemic. When Charlie informed Anna of his decision to cancel the project, Anna was already in the middle of the Design Development Phase.

What service did Anna render when she met with Charlie over coffee to discuss the potential restaurant project?

a)

Consultation

b)

Feasibility Study

c)

Pre-feasibility Study

d)

Space Programming

e)

Site Selection and Analysis

34.

Situation: Charlie invited Anna, an architect, to meet over coffee to discuss a potential restaurant project. They agreed on a fee payable to Anna for the time she will spend discussing the project with Charlie. During the meeting, Charlie was impressed by Anna’s clear expertise in designing restaurants and decided to commission Anna to design the restaurant for him. They signed a service agreement and Anna started working on the design for Charlie. However, while Anna was working on the design several months later, the COVID-19 pandemic broke out. Charlie started to worry if the project was still a good idea, so he asked Frank, an accountant, to do a feasibility study in order to help him decide on whether to continue with the project or not. Frank submitted his report, recommending that Charlie cancel the project because of the market conditions brought about by the pandemic. When Charlie informed Anna of his decision to cancel the project, Anna was already in the middle of the Design Development Phase.

For the service rendered in the preceding item, how should Anna charge Charlie?

a)

She should charge Charlie based on the time spent

b)

She should charge Charlie a lump sum amount

c)

She should charge Charlie based on a percentage of the construction cost

35.

Situation: Charlie invited Anna, an architect, to meet over coffee to discuss a potential restaurant project. They agreed on a fee payable to Anna for the time she will spend discussing the project with Charlie. During the meeting, Charlie was impressed by Anna’s clear expertise in designing restaurants and decided to commission Anna to design the restaurant for him. They signed a service agreement and Anna started working on the design for Charlie. However, while Anna was working on the design several months later, the COVID-19 pandemic broke out. Charlie started to worry if the project was still a good idea, so he asked Frank, an accountant, to do a feasibility study in order to help him decide on whether to continue with the project or not. Frank submitted his report, recommending that Charlie cancel the project because of the market conditions brought about by the pandemic. When Charlie informed Anna of his decision to cancel the project, Anna was already in the middle of the Design Development Phase.

What service did Anna render when she worked on the design of the proposed restaurant?

a)

  Schematic design service

b)

Regular design service

c)

Architectural programming service

d)

Predesign service

e)

Specialized architectural service

36.

Situation: Charlie invited Anna, an architect, to meet over coffee to discuss a potential restaurant project. They agreed on a fee payable to Anna for the time she will spend discussing the project with Charlie. During the meeting, Charlie was impressed by Anna’s clear expertise in designing restaurants and decided to commission Anna to design the restaurant for him. They signed a service agreement and Anna started working on the design for Charlie. However, while Anna was working on the design several months later, the COVID-19 pandemic broke out. Charlie started to worry if the project was still a good idea, so he asked Frank, an accountant, to do a feasibility study in order to help him decide on whether to continue with the project or not. Frank submitted his report, recommending that Charlie cancel the project because of the market conditions brought about by the pandemic. When Charlie informed Anna of his decision to cancel the project, Anna was already in the middle of the Design Development Phase.

 

Assuming Anna had the capability to do so, could she have also done the feasibility study despite not being an accountant?

a)

Yes. This is a service rendered by architects covered by SPP 201.

b)

  Yes. This is a service rendered by architects covered by SPP 202.

c)

Yes. This is a service rendered by architects covered by SPP 203.

d)

No, only a trained accountant may do feasibility studies.

37.

Situation: Charlie invited Anna, an architect, to meet over coffee to discuss a potential restaurant project. They agreed on a fee payable to Anna for the time she will spend discussing the project with Charlie. During the meeting, Charlie was impressed by Anna’s clear expertise in designing restaurants and decided to commission Anna to design the restaurant for him. They signed a service agreement and Anna started working on the design for Charlie. However, while Anna was working on the design several months later, the COVID-19 pandemic broke out. Charlie started to worry if the project was still a good idea, so he asked Frank, an accountant, to do a feasibility study in order to help him decide on whether to continue with the project or not. Frank submitted his report, recommending that Charlie cancel the project because of the market conditions brought about by the pandemic. When Charlie informed Anna of his decision to cancel the project, Anna was already in the middle of the Design Development Phase.

Is Charlie entitled to cancel the project considering Anna was already in the Design Development Phase?

a)

Yes, because the client is only barred from cancelling the project when the Design Development Phase has been completed.

b)

Yes, because the client is entitled to cancel the project at any phase.

c)

Yes, because the client is only barred from cancelling the project when the Contract Document Phase has been completed.

d)

No. The service agreement was signed and cancelling the project is tantamount to a breach of contract.

e)

No, because the client is barred from cancelling the project once the Design Development Phase has started.

38.

Assuming that the estimated project construction cost was P10M, how much should she charge Charlie for the design work that she performed?

a)

About PHP 25K

b)

About PHP 50K

c)

About PHP 75K

d)

About PHP 100K

e)

  About PHP 150K

39.

Assuming that the estimated project construction cost was P10M, how much should she charge Charlie had Anna been able to complete the contract documents?

a)

About 100K

b)

About 200K

c)

About 300K

d)

About 400K

e)

About 500K

40.

Assume that Charlie eventually changed his mind and decided to continue the project. He repackaged it into a more delivery-oriented restaurant concept, and it became a roaring success despite the pandemic. He decided to open a second branch back in his hometown in Pampanga. He reused the same plans Anna produced for him and built the second branch, based on the stipulation in the service agreement wherein Anna agreed to subsequent reuse of the plans subject to payment of further fees. How much should he pay Anna for the construction of the second branch?

   

a)

About 50K

b)

About 100K

c)

About 150K

d)

About 200K

e)

   About 300K

41.

From Figure 3, what is A?

a)

Vedika

b)

Torana

c)

chattri

d)

Tee

e)

Vihara

42.

From Figure 3, what is B? 

a)

Vedika

b)

Torana

c)

chattri

d)

Tee

e)

Vihara

43.

From Figure 3, what is C?    

a)

Vedika

b)

Torana

c)

chattri

d)

Tee

e)

Vihara

44.

Situation: Anna, Bea, and Claire are three undergraduate architecture students who decided to make good use of their summer break by accepting ‘sideline’ work. Being architecture students, they intentionally sought architecture-related small jobs in order to gain useful work experience while earning money. Anna asked her mother to tell her amigas that she (Anna) offers architectural services, specializing in the design of single-detached homes. Her mother, though reluctant, complied with her daughter’s request. Bea, meanwhile, looked for draftsman/apprentice job postings on Jobstreet and applied. Finally, Claire, being savvy with social media, posted ads on Facebook Marketplace and other online listing platforms to advertise her services, introducing herself as an “architecture student who can design many types of buildings and can prepare complete contract documents for purposes of applying for the building permit.” None of them, however, were hired or commissioned for any job or project so they ended up not working at all the entire summer.

Did Anna violate the Architecture Act of 2004?

a)

Yes

b)

No

c)

It depends

45.

Situation: Anna, Bea, and Claire are three undergraduate architecture students who decided to make good use of their summer break by accepting ‘sideline’ work. Being architecture students, they intentionally sought architecture-related small jobs in order to gain useful work experience while earning money. Anna asked her mother to tell her amigas that she (Anna) offers architectural services, specializing in the design of single-detached homes. Her mother, though reluctant, complied with her daughter’s request. Bea, meanwhile, looked for draftsman/apprentice job postings on Jobstreet and applied. Finally, Claire, being savvy with social media, posted ads on Facebook Marketplace and other online listing platforms to advertise her services, introducing herself as an “architecture student who can design many types of buildings and can prepare complete contract documents for purposes of applying for the building permit.” None of them, however, were hired or commissioned for any job or project so they ended up not working at all the entire summer.

Did Bea violate the Architecture Act of 2004?

a)

Yes

b)

No

c)

It depends

46.

Situation: Anna, Bea, and Claire are three undergraduate architecture students who decided to make good use of their summer break by accepting ‘sideline’ work. Being architecture students, they intentionally sought architecture-related small jobs in order to gain useful work experience while earning money. Anna asked her mother to tell her amigas that she (Anna) offers architectural services, specializing in the design of single-detached homes. Her mother, though reluctant, complied with her daughter’s request. Bea, meanwhile, looked for draftsman/apprentice job postings on Jobstreet and applied. Finally, Claire, being savvy with social media, posted ads on Facebook Marketplace and other online listing platforms to advertise her services, introducing herself as an “architecture student who can design many types of buildings and can prepare complete contract documents for purposes of applying for the building permit.” None of them, however, were hired or commissioned for any job or project so they ended up not working at all the entire summer.

Did Claire violate the Architecture Act of 2004?

a)

Yes

b)

No

c)

It depends

47.

Situation: Anna, Bea, and Claire are three undergraduate architecture students who decided to make good use of their summer break by accepting ‘sideline’ work. Being architecture students, they intentionally sought architecture-related small jobs in order to gain useful work experience while earning money. Anna asked her mother to tell her amigas that she (Anna) offers architectural services, specializing in the design of single-detached homes. Her mother, though reluctant, complied with her daughter’s request. Bea, meanwhile, looked for draftsman/apprentice job postings on Jobstreet and applied. Finally, Claire, being savvy with social media, posted ads on Facebook Marketplace and other online listing platforms to advertise her services, introducing herself as an “architecture student who can design many types of buildings and can prepare complete contract documents for purposes of applying for the building permit.” None of them, however, were hired or commissioned for any job or project so they ended up not working at all the entire summer.

Does Anna’s mother incur any liability under the Architecture Act of 2004?

a)

Yes

b)

No

c)

It depends

48.

How many years of experience in building design and construction are required before one may become a Building Official?

  

a)

2 years

b)

5 years

c)

6 years

d)

10 years

e)

20 years

49.

The administration and enforcement of the provisions of the National Building Code and its IRR, including the imposition of penalties for administrative violations thereof, is vested in whom?  

a)

  The Building Official

b)

The Secretary of the DPWH

c)

  The Secretary of the DILG

d)

The members of the Board

e)

The local government unit

50.

Maximum imprisonment duration imposed by the IRR of RA 9266.

a)

2 years

b)

5 years

c)

6 years

d)

  10 years

e)

20 years

51.

Complete this sentence from the new Architect’s Credo: “I shall pursue moral and professional excellence to the utmost level of integrity through industrious dedication and meaningful application to my work that merits a reputation for quality of services worthy of fair _____.”

a)

Compensation

b)

Remuneration

c)

Salary

d)

Consideration

e)

Dealing

52.

Which of the following may the landowner use as the best proof that he owns his parcel of land? 

a)

TCT

b)

Deed of sale

c)

Zoning clearance

d)

Deed of assignment

e)

Building Permit

53.

The new Architect’s Credo was adopted and promulgated through Professional Regulatory Board of Architecture Resolution No. ____, Series of 2018.   

a)

99

b)

2

c)

5

d)

88

e)

53

54.

Effectivity date of the new Architects' Credo    

a)

June 5, 2018

b)

June 21, 2018

c)

April 5, 2017

d)

September 24, 2019

55.

Which section of RA 9266 provides that a duly licensed architect shall affix the seal prescribed by the Board bearing the registrant’s name, registration number and title “Architect” on all architectural plans, drawings, specifications, and all other contract documents prepared by or under his/her direct supervision?    

a)

Section 10

b)

Section 15

c)

Section 20

d)

Section 17

e)

Section 2

56.

A newly licensed architect shall _____ become a member of the IAPOA.

a)

Automatically

b)

Be required to

c)

Has an obligation to

d)

At his option

Ideally

57.

Which method of compensation is frequently used when there is a continuing relationship on a series of projects? 

a)

Professional fee plus expenses

b)

Lump sum or fixed fee

c)

Per diem

d)

MDPE

e)

None of these

58.

A bulbous ribbed done, found especially in Islamic architecture. 

a)

Simple

b)

Compound

c)

Melon

d)

Onion

e)

Waggon

59.

Considered as the most important Islamic architecture.  

a)

The Great Mosque, Damascus

b)

The Great Mosque, Cordoba

c)

Dome of the Rock, Jerusalem

d)

Taj Mahal, Agra

e)

Tomb of Humayon, Delhi

60.

Which government agency governs the cutting down of trees present within the jobsite?

a)

DENR

b)

DPWH

c)

Forest Management Bureau

d)

HLURB

e)

DOLE

61.

The character of occupancy of existing buildings may be changed subject to the approval of the Building Official and provided the new or proposed use is _____ than the existing use.

a)

Less hazardous

b)

Equally hazardous

c)

More hazardous

d)

Equally or less hazardous

e)

None of these

62.

Which is true of openings in a four-hour fire-resistive occupancy separation?

a)

No openings are permitted in a four-hour fire-resistive occupancy separation

b)

Openings in a four-hour fire-resistive occupancy separation shall be protected by a fire assembly having a four-hour fire-resistive rating

c)

Openings in a four-hour fire-resistive occupancy separation shall be protected by a fire assembly having a three-hour fire-resistive rating

d)

Openings in a four-hour fire-resistive occupancy separation shall be protected by a fire assembly having a two-hour fire-resistive rating

e)

All of the above

63.

UNESCO WORLD HERITAGE SITES.

There are currently six UNESCO World Heritage Sites in the Philippines.

This includes three cultural sites and three natural sites.

Where you can find the best-preserved example of a planned Spanish colonial town in Asia according to UNESCO.

a)

La Casas Filipinas de Acuzar

b)

Vigan

c)

Carcar

d)

Walled City of Intramuros

e)

Pila

64.

What year was this historic city included on the list?

a)

1990

b)

1993

c)

1996

d)

1999

e)

2002

65.

Where is this historic city located?

a)

Bataan

b)

Ilocor Sur

c)

Ilocos Norte

d)

Manila

e)

Laguna

66.

A list of baroque churches, considered as national treasures for their historical and cultural importance, were inscribed to the UNESCO World Heritage list. What year did this happen?

a)

1990

b)

1993

c)

1996

d)

1999

e)

2002

67.

This group of churches established a style of building and design that was adapted to the physical conditions in the Philippines and had an important influence on later church architecture in the region. How many churches were listed by the UNESCO as part of their World Heritage List?

a)

3

b)

4

c)

5

d)

6

e)

7

68.

What is the common specific attribute of the churches?

a)

They are all Gothic - Baroque churches.

b)

They are all Neoclassical churches.

c)

They are all Renaissance churches.

d)

They were all built between 14th to 19th century.

e)

They are all examples of fortress-like churches in response to pirates, marauders and to the geologic conditions of a country that is prone to seismic activities.

69.

Which of the following churches were NOT part of the UNESCO World Heritage list?

a)

Our Lady of Mt.Carmel (Malolos, Bulacan)

b)

Church of Our Lady of the Assumption (Santa Maria, Ilocos Sir)

c)

San Agustin Church of Paoay (Paoay, Ilocos Norte)

d)

Santo Tomas de Villanueva Church (Miag-ao, Iloilo)

e)

San Agustin Church (Intramuros, Manila)

70.

Unlike other town churches in the Philippines which conform to the Spanish tradition of sitting them on the central plaza, this church along with its convent are situated on a hill surrounded by a defensive wall on all sides like a fortress. The church is reached by climbing an 85-step stairway of granite rock. The grand three-flight stairway leads to a courtyard in front of the church doorway where a sweeping view of the lower plains and the town is beheld. A narrow roadway coming from the back of the church also leads up to the courtyard but only used on special occasions.

a)

Our Lady of Mt.Carmel (Malolos, Bulacan)

b)

Church of Our Lady of the Assumption (Santa Maria, Ilocos Sur)

c)

San Agustin Church of Paoay (Paoay, Ilocos Norte)

d)

Santo Tomas de Villanueva Church (Miag-ao, Iloilo)

e)

San Agustin Church (Intramuros, Manila)