Total questions: 13

Worksheet time: 9mins

Name
Class
Date
1.

What does ADMS mean?

a)

Advanced Distribution Monitoring System

b)

Automated Distribution Management System

c)

Advanced Distribution Management System

d)

Advanced Distortion Management System

2.

What would be the type of the incident to be created if a customer called that there are no scheduled interruptions in their area, but they are experiencing a power interruption?

a)

Sustained Interruption

b)

Planned Outage

c)

Load Shedding

d)

Unplanned Outage

3.

Which of these functions is not considered an advanced application of the DMS?

a)

Integrated Volt-Var Optimization

b)

State Estimation

c)

Large Area Restoration

d)

Network Reconfiguration

4.

This is the time that we will communicate to our customers on which they could

expect when their power would return.

a)

ATR

b)

Outage Time

c)

Incident Creation Time

d)

ETR

5.

A module under the DMS umbrella wherein ADMS will calculate the fault location and will attempt to obtain the optimal switching to return power to customers.

a)

IVVO

b)

LAR

c)

FLISR

d)

Load Flow

6.

Which is not part of Meralco's Asset Information System as presented to ERC?

a)

EAM

b)

ADMS

c)

GIS

d)

ERP

7.

Which is not part of WO Closing requirements (FALLAWMA)?

a)

Material Balancing

b)

Location Specs

c)

Authorized Labor

d)

WO Digitization

8.

What does PARFAR mean?

a)

Physical Applications Register – Fixed Applications Register

b)

Physical Asset Reset – Fixed Asset Reset

c)

Physical Asset Register – Fixed Asset Register

d)

Physical Applications Reset – Fixed Applications Reset

9.

What does CXE stand for?

(a)  

10.

CXE was built on what platform?

(a)  

11.

What process is CXE more associated with?

(a)  

12.

Name at least 3 processes supported by CMSv10

(a)  

13.

Name at least 2 systems interfaced with CMSv10

(a)