WorksheetsSurprise Quiz
Total questions: 20
Worksheet time: 10mins
It was created for Disabled Persons
BP 344
PD 1096
PD 9266
BP 220
2 Government Agencies Responsible for the Enforcement of BP 344
DTI & DPWH
DPWH & DOTC
DOTC & DTI
None of the Above
Law that stipulates the criminal Liability (including Architects) who violates BP 344
The Civil Code of the Philippines
RA 9266
The Magna Carta For Disabled Persons
None Of the Above
Refer to the word Ingress
Entrance Door
Fire Exit Door
Back Door
Service Door
Turning Radius for Wheelchair
.75m
.80m
.70m
.85m
Width of Wheelchair
.70m-80m
.65m-.70m
.75m-.80m
.60m-.75m
A type of System that allows the visually impaired to read signages in elevator and control panels
Assistive Listening Devices (ALDs)
NAVI (Navigation assistance for visually impaired)
Braille System
None of the Above
Who makes the Laws of the Philippines?
Senate
Congress
President
CPD
Validity of a Special Temporary Permit
1 Project, 1 Year
1 Project, 2 years
1 Project, not less than 6 months
1 Project, 1 Month
Who nominates the members of the PRBArch?
President of the Philippines
Members of PRBArch
IAPOA
None of the Above
Who appoints the members of the PRBArch?
President of the Philippines
Members of the PRBArch
IAPOA
None of the Above
It defines the scope of practice of an Architect
PD 9514
PD 9266
PD 1096
BP 220
What is the minimum clear width for doors according to BP 344?
900mm
800mm
1000mm
1200mm
The performance and Payment Bonds shall be released by the owner after the expiration of how many months from the final acceptance of the work?
2 months
5 months
3 months
1 month
The person receiving a possessory interest in buildings, property, etc. by lease
Leaseholder
Lessor
Lease
Lesse
The person granting a possessory interest in building, property, etc. by lease
Leaseholder
Lease
Lessor
Lesse
How many percent of the contract amount is the performance bond?
15%
30%
10%
5%
What percentage of an architect’s work is liability under the civil code
20%
10%
5%
30%
The Guarantee Bond is released how many months after the date of final payment
1 year
6 months
1 month
3 months
Maximum Heights for Kick Plates according to BPP 344
200mm to 300mm
250mm to 400mm
200mm to 400mm
300mm to 400mm