wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

SPP Doc. 201 - Pre Design Service

Total questions: 14

Worksheet time: 7mins

Name
Class
Date
1.

Scope of service:

Give oral or written advice and direction

a)

Consultation

b)

Pre feasibility Studies

c)

Space Management Studies

d)

Space Planning

2.

Scope of service:

Procurement, analysis and use of secondary information. To explore identifiable options/directions

a)

Feasibility Studies

b)

Pre-Feasibility Studies

c)

Architectural Research

d)

Architectural Programming

3.

Scope of service:

Determine viability of a project. Present and future trends to forecast performance over time.

a)

Feasibility Studies

b)

Consultation

c)

Site Utilization and Land Use

d)

Pre Feasibility Studies

4.

Scope of service:

Analysis to determine most appropriate site. Formulation of site criteria

a)

Site utilization & Land Use Studies

b)

Architectural Research

c)

Site Selection and Analysis

d)

Space Management

5.

Scope of service:

Identification of site/s development potential. Analysis covers context of site surroundings

a)

Architectural Research

b)

Site Selection and Analysis

c)

Space Management Studies

d)

Site Utilization & Land Use Studies

6.

Scope of service:

Identification of horizontal & vertical requirements

a)

Architectural Programming

b)

Architectural Research

c)

Value Management

d)

Design Brief Preparation

7.

Scope of service:

Determine adequate size and appropriate configuration and assemblage. Data gathering thru interviews, consultations, interfaces etc.

a)

Space Planning

b)

Value Management

c)

Pre Feasibility

d)

Architectural Research

8.

Scope of service:

Analysis of space requirements based on organizational structure and functional set-up. Pinpoints linkages and interaction of spaces.

a)

Space Planning

b)

Architectural Programming

c)

Space Management Studies

d)

Value Management

9.

Scope of service:

States project Terms of Reference (ToR)

a)

Consultation

b)

Promotional Services

c)

Design Brief Preparation

d)

Value Management

10.

Method of Compensation where it is applicable only to non-creative work

a)

Mixed Methods

b)

MDPE

c)

Professional Fee + Expenses

d)

Lump Sum / Fixed Fee

11.

Method of Compensation where it is used where there is a continuing relationship involving series of projects

a)

MDPE

b)

Per Diem

c)

Professional Fee + Expenses

d)

Lump Sum or Fixed Fee

12.

Method of compensation where the Architect serves as the agent of the owner

a)

Lump Sum or Fixed Fee

b)

Per Diem, Honorarium + Reimbursable Expenses

c)

MPDE

d)

Professional Fee + Expenses

13.

Should have a clear and fully defined scope of services. Usually used method of compensation for government projects.

a)

Mixed Methods of Compensation

b)

Lump Sum/ Fixed Fee

c)

MDPE

d)

Per Diem

14.

What is SPP Doc 201?

a)

Pre Design Service

b)

Regular Design Service

c)

Specialized Allied Service

d)

Full Time Construction Service