A BUNGALOW HOUSE IS CONSTRUCTED BETWEEN 2-STOREY HOUSES, WHAT IS THE SUGGESTED ROOFING MATERIALS TO BE USED?

a)

ROOF TILES

b)

ASPHALT SHINGLES

c)

CORR. G.I. ROOFING

d)

NONE OF THE ABOVE

2.

ONE OF THE HISTORICAL STRUCTURE IN GREECE IS PATHENON, WHAT TRIANGLE IS WITHIN THE BUILDING FACADE WHICH APPLIED PRINCIPLE OF PROPORTIONING?

a)

RIGHT TRIANGLE

b)

ISOSELES TRIANGLE

c)

SCALENETRIANGLE

d)

EQUILATERAL TRIANGLE

3.

IN A (45) FORTY-FIVE STOREY STRUCTURE WITH (5) FIVE BASEMENT LEVEL, THE TOP MOST FLOOR IS 45th FLOOR. WHAT IF A (45) LEVEL STRUCTURE WITH (5) FIVE BASEMENT LEVEL, WHAT WILL BE THE TOP MOST FLOOR?

a)

40th FLOOR

b)

45th FLOOR

c)

41st FLOOR

d)

50th FLOOR

4.

IN A COLORWHEEL, CONSIDERING CONTRAST, YELLOW IS FOR VIOLET, RED IS FOR GREEN, WHAT ABOUT THE BLUE GREEN?

a)

ORANGE

b)

YELLOW ORANGE

c)

RED ORANGE

d)

BLUE VIOLET

5.

COMMON PROBLEM IN SPRAYING LACQUER PAINT IS THE FOUL ODOR WHILE APPLYING IT, WHAT IS TO BE MIX ON THE PAINT TO ELIMINATE FOUL ODOR WHILE HAVING THE SPRAY APPLICATION?

a)

ODOR NEUTRALIZER

b)

LACQUER FLO

c)

PERFUME

d)

VANILLA

6.

WHAT WATER SYSTEM TO BE USED ON A 2- STOREY RESIDENTIAL HOUSE KNOWING THAT THE WATER MAIN HAVE A NORMAL PRESSURE FROM 8PM TO 6AM AND THERE IS NO WATER AT ALL DURING 6AM TO 8PM?

a)

UPFEED

b)

PNEUMATIC

c)

DOWNFEED

d)

UPFEED/DOWNFEED

7.

CONSIDERING THREE-PHASE POWER SUPPLY WITHIN THE STRUCTURE, HOW MANY WIRES WILL BE PROVIDED IN A UTILITY BOX FOR DUPLEX TYPE 2-POLE OUTLET?

a)

2 WIRES

b)

3 WIRES

c)

4 WIRES

d)

6 WIRES

8.

BASED ON RULE VII & VIII, SECTION 808. WINDOW OPENING, WHAT SHOULD BE THE SIZE OF A SLIDING WINDOW, IF THE ROOM AREA IS 5.0M. X 6.0M.?

a)

1.20M. X 2.0M

b)

1.20M. X 1.50M

c)

1.50M. X 2.0M

d)

1.50M. X 4.0M

9.

IN A RESIDENTIAL CONDOMINUM TOWER HAVING A MINIMUM CEILING HEIGHT WITHIN EVERY FLOOR, WHAT WILL BE THE MINIMUM AREA FOR A BEDROOM?

a)

5.0 SQ.M.

b)

6.0 SQ.M.

c)

6.8 SQ.M.

d)

7.8 SQ.M.

10.

WHAT SERVICES PROVIDED IF THE ARCHITECT IS ALSO THE CONTRACTOR?

a)

CONSTRUCTION SERVICES

b)

PRE-DESIGN SERVICES

c)

DESIGN BUILT SERVICES

d)

NONE OF THE ABOVE

11.

WHAT SERVICES PROVIDED IF THE ARCHITECT WILL ALSO WORK ON THE INTERIOR OF THE PROJECT?

a)

INTERIOR DESIGNING

b)

SPECIALIZED ALLIED SERVICES

c)

CONSULTING ARCHITECT

d)

SPECIALIZED ARCHITECTURAL SERVICES

12.

WHICH OF THE FOLLOWING IS NOT A PRECAST?

a)

PRE-TENSIONING

b)

PRE CAST WALL

c)

POST TENSIONING

d)

LIFT SLAB

13.

CLASSIFICATION OF WOOD USE FOR STRUCTURAL MEMBERS?

a)

HARDWOOD

b)

SOFTWOOD

c)

DRYWOOD

d)

ROUGH LUMBER

14.

WHAT IS THE SIDE LAPPING OF CORR. G.I. ROOFING?

a)

1

b)

2

c)

2 1/2

d)

3

15.

WHAT IS THE SIDE LAPPING OF CORR. G.I. ROOFING?

a)

1

b)

1 1/2

c)

2

d)

3

16.

WHAT IS THE SIDE LAPPING OF CORR. G.I. ROOFING?

a)

1 1/2

b)

2

c)

2 1/2

d)

3

17.

WHICH OF THE FOLLOWING MATERIALS IS USED FOR EXTERIOR CLADDING?

a)

PEBBLES

b)

GYPSUM BOARD

c)

FABRIC

d)

NONE OF THE ABOVE

18.

WHAT IS THE MINIMUM SLOPE FOR CORRUGATED G.I. ROOF?

a)

1

b)

5

c)

8

d)

10

19.

GIVEN A SIZE OF A TOILET AND BATH, 1.60M. X 2.40M., USING 20 X 30cm WALL TILES. QUANTIFY HOW MANY TILES IS NEEDED, IF THE HEIGHT OF THE WALL TILES IS 1.80M.?

a)

222 pcs.

b)

240 pcs.

c)

264 pcs.

d)

360 pcs.

20.

GIVEN A ROOM SIZE OF 6.0M. X 6.0M., USING 6mm thk.- 4’ X 8’ GYPSUM BOARD AND 1/8” X 1” X 20’ ANGLE BARS, (HANGERS ARE NOT INCLUDED) @ 2’ ON CENTER, HOW MANY GYPSUM BOARD & ANGLE BARS IS NEEDED?

a)

13pcs. of GYPSUM BOARD & 22pcs. of 1/8” X 1” X 20’ ANGLE BARS.

b)

13pcs. of GYPSUM BOARD & 26pcs. of 1/8” X 1” X 20’ ANGLE BARS.

c)

13pcs. of GYPSUM BOARD & 30pcs. of 1/8” X 1” X 20’ ANGLE BARS.

d)

13pcs. of GYPSUM BOARD & 40pcs. of 1/8” X 1” X 20’ ANGLE BARS.