BASED ON PD 1096, THE EXEMPTED PROJECTS ARE:
Public and Government Buildings
Alterations and Renovations
Traditional dwellings and BP 220 projects
Demolition and Addition
All on-site work done from site preparation, excavation, foundation, assembly of all the components and installation of utilities and equipment of buildings/structure
Addition
Construction
Alteration
Demolition
Construction in a building/ structure involving changes in the materials used, partitioning, location/ size of openings, structural parts, existing utilities and equipment but does not increase the overall area thereof
Alteration
Renovation
Repair
Conversion
The person who’s in charge on making policy, memorandum circulars, prescription of fees, appointment of building officials in all municipalities
President
Secretary
Building Official
None of the Above
He issues, denies, suspends, and revokes permits.
Secretary
Building Official
President
Both A & B
A dwelling intended for the use by one family and constructed of native materials (bamboo, nipa, logs, lumber), the total cost of which does not exceed PHP15,000.
Economic and Socialized Housing
Rowhouse
Duplex
Traditional family dwellings
Which is considered as dangerous building
Structural Hazard
Fire Hazard
Architectural Deficiency
All of the above
A written authorization granted by the Building Official to an applicant allowing him to proceed with construction after plans, specifications and other pertinent documents have been found to be in conformity with the Code.
Building Permit
Certificate of Occupancy
Construction Permit
Both A & C
Building permit exemptions;
Minor Constructions
Repair works
Alterations
Both A & B
According to the National Building Code, what is the maximum cost of a traditional family dwelling?
10,000
15,000
20,000
25,000
Which of the following requires a building permit?
Repairs of load-bearing partition walls
Garden pools 500mm deep or shallower
Garden pools 500mm deep or shallower
An open terrace 15sqm in area
According to the Building Code, how many sets of plans and specifications must be submitted when applying for a permit?
3 set
5 set
6 set
7 set
Article 1723 of the Civil Code states that the engineer or architect who drew up the plans and specifications is liable for how many years from date completion?
10 years
12 years
15 years
16 years
The Building Permit will expire if;
Constructions does not commence within 1 year from the date of issue
Construction does not resume 130 days after suspension
Does not renew annually
None of the Above
Who shall the Owner hire to undertake full-time inspection and supervision of the construction?
RLA or Civil Engineer
Project Manager
Construction Manager
Contractor
This type of construction is four-hour fire-resistive throughout
Type I
Type II
Type III and IV
Type V
In which fire zone can Type 3 constructions be built?
Non-restricted zone
Fire restrictive zone
A and B only
Highly Fire Restrictive Zone
The degree to which a material can withstand fire.
Fire Resistive Rating
Heat tolerance
Quality Control
None of the above
To differentiate Occupancy from Zoning, Occupancies are assigned to _____, while zones are assigned to ____
Buildings, Lands
Use, Spaces
Buildings, Location
Use, Lands
Residential building for non-leasing occupants not exceeding 10 persons
A – 1
A – 2
A – 3
A – 4
Institutions for the care of non-ambulatory patients and children under kindergarten age
D – 1
D – 2
D – 3
D – 4
Assembly buildings with stage for less than 1,000
H 1
H 2
H 3
H 4
Characterized low-rise or medium-rise buildings for use as multiple family dwellings
R1
R2
R3
R4
Land development or redevelopment schemes for a new project which has a CDMP (Comprehensive Development Masterplan) or equivalent
PLANNED UNIT DEVELOPMENT
SITE DEVELOPMENT
PHYSICAL PLANNING DEVELOPMENT
COMPREHENSIVE DEVELOPMENT
Eaves over required windows shall at least be _____ from the side and rear property lines
650mm
750mm
850mm
950mm
Where firewall is not allowed
R1
R2
R3
B AND C
Where firewall can be built with a Maximum 85% of each side and the total should not exceed 65% of lot perimeter OR 90% of side or rear and the total should not exceed 50% of lot perimeter
R1
R2
R3
R4
Where firewall can be built on two sides with a maximum of 85% of each side and total should not exceed 50% of lot perimeter
R1
R2
R3
R4
This is the total floor space inside the building
GFA
TGFA
AMBF
PSO
It is measured from established grade line to the topmost portion of the building
Building Height
Vertical Projection
AMBF
GFA
Firewalls are not allowed for R1 developments. However, an abutment of up to ___ in height is allowed, provided that above 1.50m, the abutment is made of perforated concrete blocks
2.00
2.70
3.20
3.00
For a sloping lot with a 4.00m difference between the highest and lowest points of the lot, where will the established grade line be for building height determination?
Lowest point of the lot
Highest point of the lot
The Average between two points
None of the above
For towers, spires, and steeples made of combustible materials, the height limit projections above BHL is _____
4 meters
5 meters
6 meters
7 meters
What is the BHL of an RROW with 6-7 meters wide.
3 Storeys or 9.00m
2 Storey or 8.00m
2.5 Storey or 7.5m
1.5 Storey or 6.0m
What is the minimum parking slot size for an articulated truck?
2.50m x 5.00m
3.00 x 9.00m
3.60 x 18.00m
3.60 x 22.00m
What is the minimum parking slot size for a car perpendicularly parked?
2.50m x 5.00m
3.00m x 6.00m
2.00m x 5.00m
3.00m x 5.00m
For Public Hospitals, the sample parking requirement is;
1 car slot for every 25 beds
1 car slot for every 22 beds
1 car slot for every 20 beds
1 car slot for every 15 beds
For the minimum requirements of Group A dwellings, the foundation shall be At least _____ below the surface of the ground
500mm
600mm
700mm
800mm
The minimum width of stairs for Group A dwellings
600mm
650mm
750mm
850mm
If you subtract the ISA from the construction area, what will you get?
TOSL
PSO
USA
BHL
If you add the Percentage of site occupancy and Total open space within lot, what will you get?
USA
ISA
TLA
GFA
What is not included on determining the GFA?
Parking area
Balcony with 8sqm
Dining area
Living area
What is the FLAR designation for R1?
1.25
1.50
1.75
2.00
What is the minimum setbacks for R2 based on NBC?
3.00m – 2.00m – 2.00m
2.00m – 1.50m – 1.50m
4.00m – 2.00m – 2.00m
3.00 – 1.50m – 1.50m
Setbacks for Commercial Building with an RROW of 30meter or more in width
8.00 – 5.00 – 5.00
6.00 – 3.00 – 3.00
9.00 – 6.00 – 6.00
5.00 – 3.00 – 3.00
The minimum dimension of a court
2.00m
2.50m
3.00m
3.50m
What is the minimum ceiling height of the second floor on an artificially ventilated building?
3.00m
2.70m
2.40m
2.10m
Minimum area of a habitable room
6.00 sqm
7.00 sqm
8.00 sqm
9.00 sqm
Minimum area for kitchen
3.00 sqm
4.00 sqm
5.00 sqm
6.00 sqm
What is the air space requirement for offices?
3.00 cubic meters
12.00 cubic meters
14.00 cubic meters
16.00 cubic meters
What is the minimum area of windows in habitable rooms?
5% of floor area
10% of floor area
15% of floor area
20% of floor area
What is the minimum easement for Forest Areas adjacent to body of water?
20.00m per side of waterway
40.00m per side of waterway
60.00m per side of waterway
70.00m per side of waterway
What is the minimum total width of the RROW of a 6 dwelling units?
3.00
3.20
4.20
5.20
The RROW level from the finished surface of the roadway all the way up to the air
Above Grade
At Grade
Below Grade
None of the Above
What is the minimum width of the sidewalk for a RROW width of 9.00 or more?
1.20 m
1.50 m
2.00 m
1.80 m
Minimum width of a planting strip with a sidewalk width of 2.00 or more
600mm
700mm
800mm
900mm
What is the maximum projection allowed for a footing, buried 600mm below grade, towards a public sidewalk?
300mm
450mm
600mm
500mm
Clearance between sidewalk grade and lowest portion of balcony
3.00m
2.70m
2.40m
2.10m
What is the allowed projection of doors and windows that projects beyond the property line when fully opened or upon opening?
2.40 above the pavement
2.70 above the pavement
3.00 above the pavement
3.20 above the pavement
Minimum width of chaflan
3.00
4.00
5.00
6.00
Fences should be installed around the construction or demolition site. What is the minimum height required for the fence?
2.00m
2.40m
2.70m
3.00m
If the distance between the outermost face of the building and the inner edge of the sidewalk is equal to the building height, what is required?
A fence only
A fence and a canopy
Fence, canopy, and a net
A fence and temporary walkway
What is the minimum size of a classroom for 30 students and 1 teacher, according to the occupant load factors in Rule 12 of the Building Code?
54.80 sqm
55.80 sqm
138.00 sqm
142.60sqm
What is the occupant load factor for hotels, according to Rule 12?
28.00 sqm/person
18.60 sqm/person
8.40 sqm/person
9.00 sqm/person
A floor with an occupant load of 700 shall have at least how many exits?
2
3
4
5
What is the maximum travel distance to an exit if the building has an automatic fire extinguishing system?
30 m
45 m
60 m
65 m
What is the minimum height required for doors in the Building Code?
1.80 m
2.00 m
2.10 m
2.40 m
What is the minimum stair width required if the occupant load is 15?
750 mm
900 mm
1100 mm
1200 mm
What is the correct mounting height of handrails, according to the Building Code?
700-800mm
800-900mm
700-900mm
800-1000mm
What is the minimum depth of for elevator pits?
600mm
800mm
850mm
900mm