WT4201 Quiz 1 Chapter 1

Total questions: 15

Worksheet time: 5mins

Name
Class
Date
1.

EIA was implemented in Brunei as a legislative requirement through

a)

National Environmental Policy Act (NEPA)

b)

Environmental Protection and Management Order (2016)

2.

The main aim of a Detailed Environmental Impact Assessment

a)

To determine the least expensive way to protect the environment

b)

To describe the significant environmental impact and specify mitigating measures in the project

c)

To reduce the number of people who are affected from the project

d)

To evaluate the balance of positive benefits against possible harmful effects

3.

The correct sequence of stages in EIA

a)

Screening, Assessment, Scoping, Report, Review, Monitoring, Audit, Decision Making

b)

Scoping, Screening, Assessment, Report, Review, Decision Making, Monitoring, Audit

c)

Screening, Scoping, Assessment, Report, Review, Decision Making, Monitoring, Audit

d)

Screening, Scoping, Assessment, Report, Review, Decision Making, Audit, Monitoring

4.

The process of EIA must be carried out in a ________ manner.

a)

Linear

b)

Square

c)

Rectangular

d)

Cyclic

5.

TOR is prepared in which stage

a)

Screening

b)

Scoping

c)

Public Consultation

d)

Impact Assessment

6.

Select the correct EIA stage:

Identification of key issues to be studied and addressed in the EIA report

a)

Scoping

b)

Review

c)

Assessment

d)

Screening

7.

Collection of background information on the existing biophysical and socioeconomic settings for assessment and potential monitoring purposes

a)

Impact assessment

b)

Environmental Management Plan

c)

Mitigation measures

d)

Baseline study

8.

The elimination, reduction, or control of the adverse environmental impact of the proposed project

a)

Baseline study

b)

Impact Assessment

c)

Mitigation mesures

d)

Screening

9.

Which method is most appropriate in EIA to identify the interactions between various activities and environmental parameters?

a)

Checklist Method

b)

Matrix Method

c)

Ad Hoc Method

d)

Overlay Method

10.

EIA contributes to Sustainable Development.

a)

True

b)

False

11.

What is included in an Impact assessment? (Select all that apply)

a)

A detailed assessment of the planned project and selected alternatives compared to the baseline conditions.

b)

Qualitative descriptions measuring high, medium, and low impacts.

c)

Quantitative descriptions such as indicating the cubic meters of water withdrawn, sewage produced, and pollutants released.

d)

All the data collection, analyses, and developed plans are summarised in a well-structured and concise document.

12.

A checklist of environmental impacts or baseline studies are

a)

Physical Component

b)

Biological Component

c)

Socio-economic Component

d)

All of the above

13.

Public Consultation - EIA report is informed and consulted with the people living around the proposed project area

a)

False

b)

True

14.

Post-monitoring comes into picture ________ the project is commissioned.

a)

Before

b)

During

c)

After

d)

No post-monitoring is done

15.

What specific aspects do a good EIA report and review include? (Select all that apply)

a)

Assessment, mitigation measures, and related plans.

b)

Terms of reference (TOR).

c)

A generalized set of assumptions about the project benefits is described in highly technical terms.

d)

A satisfactory prediction of the adverse effects of proposed actions and their mitigation using conventional and customized techniques.

e)

Information that is helpful and relevant to decision making.