WorksheetsBASIC TOPIC 3: INVENTORY, ANALYSIS & SYNTHESIS
Total questions: 13
Worksheet time: 7mins
TO ORGANIZE A LANDSCAPE PROJECT, WE NEED TO BRIEF THE PROJECT AND DO A CASE STUDY..TRUE OR FALSE?
TRUE
FALSE
WHILE MEETING THE CLIENT, WE DISCUSS ABOUT
PROSPECT OF PREPARING DESIGN FOR THE SITE
CLIENT CONVEY THEIR NEEDS AND DESIRE
CLIENT DISCUSS SITE PROBLEMS AND THEIR BUDGETS
ALL ANSWER ARE CORRECT
SIGNING THE CONTRACT - HAVE TO SIGN AND SUBMIT LETTER OF APPOINTMENT, THAT HAVE SPECIFIC SCOPE, SCHEDULE AND COST. TRUE OR FALSE?
TRUE
FALSE
BASE MAP HAVE THE SITE DIMENSION AND MEASUREMENT FOR THE WHOLE SITE INCLUDING IDENTIFY THE SITE CONTEXT. TRUE OR FALSE?
TRUE
FALSE
WHAT IS SITE INVENTORY?
IDENTIFY AND RECORD EXISTING CONDITION
DATA COLLECTION
JOT DOWN IN BASE MAP THE LOCATION, CONDITION AND QUANTITY OF HARDSCAPE AND SOFTSCAPE
ALL ANSWER ARE CORRECT
WHAT IS ANALYSIS?
ANALYZE DATA
DATA EVALUATION
IDENTIFY THE CAUSE/ WHY IT HAPPEN/ IDENTIFY SWOT
ALL ANSWER ARE CORRECT
WHAT IS SYNTHESIS?
SUMMARY OF INVENTORY AND ANALYSIS
SUGGESTION OF NEW IDEA
SUGGESTION OF HOW TO SOLVE THE PROBLEMS
ALL ANSWER ARE CORRECT
FOR MICROCLIMATE INVENTORY, WE IDENTIFY
DIRECTION OF SUNRISE AND SUNSET
WIND DIRECTION
TEMPERATURE
ALL ANSWER ARE CORRECT
TOPOGRAPHY INVENTORY -WE IDENTIFY EXISTING LANDFORM & SLOPE CONDITION AND IDENTIFY ELEVATION CHANGES
TRUE
FALSE
HYDROLOGY AND DRAINAGE - WE HAVE TO LOCATE THE WATER FLOW AND WATER SPOT ON LAND
TRUE
FALSE
IDENTIFY THE LOCATION, QUANTITY AND CONDITION OF SOFTSCAPE IS UNDER
MICROCLIMATE
TOPOGRAPHY
VEGETATION
SITE CONTEXT
IDENTIFY LOCATION OF HARDSCAPE AND OTHER FASILITIES IS UNDER
VIEW AND SENSORY
MICROCLIMATE
DRAINAGE
EXISTING STRUCTURE
FOR VIEW AND SENSORY INVENTORY - WE HAVE TO OBSERVE AND IDENTIFY VIEW FROM ALL SIDE - GOOD VIEW AND BAD
TRUE
FALSE