Font size
WorksheetsSCMIC 0401 DASF Review
Total questions: 37
Worksheet time: 21mins
What transaction does the SOS send to follow-up on delinquent materiel receipt acknowledgment?
(a)
What is the purpose of the MPR?
shows active requistions due in to the unit
shows active service requests in the maintenance cycle
shows all requisitions that have been received
shows all closed service requests within a unit
What is the first trailer that posts to your DASF when requisitioning an item?
AE1
A1A
A0A
AS1
What transaction is used for a follow up to an aged status?
AFC
AF1
AK1
AM1
WHAT DIC WILL YOU USE TO REQUEST CANCELLATION?
AC1
AK1
AM1
AF1
Which DIC is a sent when your items has shipped?
AE1
AS1
AM1
BA
What reports are used for the reconciliation between maintenance and supply?
DASF, MRR
MPR, DASF
MPR, CMR
DASF, ERR
What is the status code for an item being processed for shipment?
BB
BA
AS1
BD
Today is 20 Sept. What action needs to be taken? and what qty?
(a)
The Document number M2902182960067 has received an AE1/BM and it's been 1 day with no other status. What action needs to be taken?
AF1
AT1
AC1
No action
Commodity notified you that they need a better ESD for document M2902183030013. What action needs to be taken?
(a)
What are two reasons for submitting a modification?
Change in requirement
wrong qty
inaccurate keypunch
wrong NSN
What follow up transaction is used to request a better ESD for a requisition with a pri 03?
AF1
AK1
AFC
AM1
What are the two basic types of lonesome demands?
From the requisitioning activity to the SMU & From a AE1/BD
From a pass
From the SMU
From the requisitioning activity to the SMU & a pass from the SMU to another SOS
Which form is used by a RO to delegate authority?
DD 1149
NAVMC 6
NAVMC 11869
DD 1348-1A
What report does the maintenance section use?
DASF
MPR
CMR
MAL
Today is 26 October. The Document number M2902182960067 has received an AE1/BM and it's been past 2 days with no other status. What action needs to be taken?
(a)
Today is 12 November. What action needs to be taken?
(a)
After conducting causative research, you determine the item is a lost shipment. What response is submitted?
DRA
DRB/_
DRB/B
DRB/F
How often are the DASF/MPR reconciled?
every 2 days
every 2 months
every week
every 2 weeks
Which DIC is a sent when your items has shipped?
AE1
AS1
AM1
BA
What DIC is processed in GCSS for a receipt transaction?
(a)
Today is 06 December. What action needs to be taken?
(a)
Today is 12 November. What action needs to be taken?
(a)
This item was found to be inbound and held at the processing facility and determined to be still in transit. What action needs to be taken?
DRA
DRB/_
DRB/B
DRB/F
A requisition came into the warehouse. The 1348 has a qty of (16), but there are only (9) in the box. What qty would you keypunch?
D6T___, COR___, DRA___, D6T___, D9Z___
(a)
If the only trailer for a document is a DRF, and you have no history of the document? What is the correct response?
DRB/B
AT1
DRB/F
DRA/F
On 11 January 2004, Cpl Davidson, M. T. keypunched a receipt for 11 firing pins. What is the proper annotation on the DASF?
COR (15) 11 Jan 2004 MTD
D6T (15) 11 Jan 2023 MTD
D6T (11) 11 Jan 2004 MTD
D6T (11) 7 Mar 2023 CMT
What are the three systems we use to conduct technical research?
Technical Manual, US Bank, GCSS-MC
User Manual, Crane, FEDLOG
SL-3, FEDLOG, IMO
DAI, FEDMALL, IMO
1. You received a DRF from the SOS, after conducting an in house search you could not find the items. You even called the carrier who delivered it and they confirmed it has been delivered 46 days ago. How do you respond?
(a)
Your unit did not order this item. What is the appropriate response?
(a)
How often is the MOV conducted?
Annually
Biweekly
Quarterly
Daily
What action(s) are taken in GCSS-MC after a MOV is initiated by the SOS?
-Approve AN1 in AAC actions tab and
-submit AP1
Submit AN1
submit just an AP1
ask the commodity if its still needed.
How will you respond to the SOS to let them know those document numbers are still valid from the MOV?
submit AN1
Submit AP1
The quantity, advice code, and the priority in a requisition are examples of fields that can be modified.
True
false
AE1/BQ populates on the DASF. What does that mean and what happens next?
Cancellation accepted by SOS
and
you celebrate
Cancellation is not accepted by SOS
and you complain
Cancellation accepted by SOS
and
you approve in AAC actions tab
DRF populates on DASF. Supply conducts causative research and found the item in the warehouse. What actions are required next?
-respond with DRB/_
and
-D6T
-respond with DRB/B
and
-D6T
-respond with DRB/F
and
-D6T
-respond with DRF/_
and
-D6T
