WorksheetsDQAA Assignment
Total questions: 20
Worksheet time: 10mins
In the improved group listing methodology, the building numbering and household listing is based on
DQAA
SA
L.G.A
EA
In the improved group listing methodology, all enumerators and supervisors will have a tablet each to work with
True
False
Which of the following statements is incorrect
An enumerator is expected to start listing immediately he/she gets assigned building
All functionaries work as a group in an EA before moving to the next EA in the SA
The enumerator without tablet in EA1 must work with a tablet in another EA
An enumerator is expected to start listing only after the supervisor assigns building to all enumerators
Group listing methodology means:
All functionaries in an LGA work as a group with the FDQM
All Enumerators will list together by moving from one building to another
The Supervisor assigns the buildings in an EA to each of the Enumerators, they finish listing in one EA before moving to another
In the listing methodology, the supervisor will first go round to number all buildings before assigning to Enumerator
True
False
In the listing methodology, Demolished building will maintain the number given during demarcation
True
False
In the listing methodology, if Enumerator 1 is assigned building 1-56, Enumerator 2 will start listing from:
No 58
No 56
No 44
No 57
Which statement is incorrect
This implies that if Enumerator 4 doe not have a tablet while working on EA 1, Enumerator 4 must be given a tablet to in EA 2 i.e another Enumerator will pass the tablet to Enumerator 4. This rotate will be at the discretion of the supervisor.
As a result of the above, the assignment of building in EAS will be rotated by the supervisor. The enumerator without tablet at a given time will join the supervisor in chalking the building.
The exercise is non supervising areas based
Not all Enumerator will be have tablets in an SA. (0.75 tablets to 1 EA). This means an SA with 4EAS may have 3 tablets.
In the Group listing methodology, since all Enumerators might not have tablets that means the Enumerator without a tablet will be assistant supervisor through out the exercise
True
False
Which of this is a new innovation in Group listing methodology?
Supervisor will fetch map
All of the above
An enumerator will receive a token on his phone before he can fetch his/her assigned area
An enumerator will fetch map
EA numbering is not necessary to be serial as long as all buildings are captured
True
False
All buildings must be numbered as long as they are demarcated even if they are demolished so that the EA will not be flagged
True
False
Demolished buildings will not assigned a number i.e if EAD building 2 is demolished, building 3 is now assigned 2 for building numbering, however it will be verified as demolished on the device
True
False
New buildings will be assigned numbers based on their location while maintaining the flow of serial numbering i.e new building between EAD building 1 and 2 is numbered code 2 and building 2 is numbered code 3 and so on
True
False
Demolished building found in the EA in the scenario must be numbered on ground
True
False
Supervisors and DQAA must check and sign off that EAs within their assignment area is completed before validation is initiated
True
False
In an SA with 6 enumerators and Five tablet, what role with Enumerator 6 play
Joins the supervisor in chalking the buildings
Receive materials on behalf of the team
Wait til the next EA before joining the team
Demolished and non existing buildings are assigned census building code zero (0) by the system as number is passed to the next building
True
False
Which of the Enumerators verify ommitted buildings during assignment
The first Enumerator
The Last Enumerator
The Second Enumerator
All of the above
Who monitors coverage of EA on census pad since it is Group listening?
The Supervisor
The National Coordinator
The FDQM
The Enumerators
