wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

You should get full marks quiz

Total questions: 50

Worksheet time: 8hrs 20mins

Name
Class
Date
1.

What are the hazards associated with PDA

a)

Noise

b)

Moving Parts (Fan)

c)

Electrical Shock

d)

Option 2 & 3

2.

There are two 1PPS inside the DLS, are these interchangeable?

a)

No

b)

Yes

3.

Which of the following is not part of the DLS?

a)

DLS Control Panel

b)

Hydraulic Stabilization Legs

c)

Antenna Cabinet

d)

Operative Rack

4.

What is the required voltage to power up the GPS?

a)

14 VDC

b)

24 VDC

c)

28 VDC

d)

32 VDC

5.

Which of the following is true about the safety key in "SAFE" position?

a)

Disable LIFT and OP functionality

b)

Enable LIFT and OP functionality

c)

Disable LIFT functionality only

d)

Disable OP functionality only

6.

What does a battery pack of the DCNS consists of?

a)

Two banks of 12V, 7AH

b)

One bank of 12V, 9AH

c)

Two banks of 12V, 9AH

d)

One bank of 12V, 7AH

7.

The PSU in the Operative Rack converts 400VAC to which voltage?

a)

28VDC

b)

240VAC

c)

24VDC

d)

5VDC

8.

With the Master Slope Meter in failure on the SSD, is the SSD still able to operate in automatic mode?

a)

Yes

b)

Yes, but the slope meter cables must be swapped.

c)

No, a fault message is displayed on the remote control.

d)

Yes, but the slope meters must be swapped.

9.

Which of the following is not a section of the Pre-Equipped Shelter?

a)

Operative Section

b)

Technical Section

c)

Power Generation Section

d)

Antenna Seciton

10.

What is the power input required for the nominal light?

a)

230 Vac

b)

220 Vac

c)

416 Vac

d)

400 Vac, 3 Phase, 40 Hz

11.

How many slope meters are in the SSD Subsystem?

a)

2

b)

3

c)

4

d)

5

12.

How many Emergency Power Off button(s) are there at the DLS's PGU and DLS?

a)

1

b)

2

c)

3

d)

4

13.

Where is the PGU located in the DLS?

a)

Antenna Section

b)

Power Generation Section

c)

Technical Section

d)

Operative Section

14.

The two PGU batteries are connected in ______ to provide _____ output for the starter motor.

a)

Series, 12 VDC

b)

Parallel, 12 VDC

c)

Series, 24 VDC

d)

Parallel, 24 VDC

15.

How is the power from the PGU routed to the DLS?

a)

Routed through the PDA then to the EPDA to provide power to other subsystems of the DLS.

b)

Routed through the EPDA to provide power to other subsystems of the DLS.

c)

Routed to each individual subsystems.

d)

Routed through the PSU to provide other subsystems in the DLS.

16.

What are the modes of command that can enable the operation of the SSD?

a)

Automatic Remote Control

b)

Manual handling of cranks

c)

Hydraulic

d)

Option 1 & 2

17.

What are the possible causes that that PGU will not start up?

a)

Emergency button depressed

b)

Battery isolation switch is off

c)

Engine Oil insufficient

d)

All of the above

18.

Which of the following tells the operator the lifting jacks are retracted fully and can be stowed back to position?

a)

Ready Indicator

b)

ALL UP Indicator

c)

ALL DOWN Indicator

d)

LOCKED Indicator

19.

To get a correct orientation of the Hydraulic lifting jack 1, 2, 3 & 4 on the handheld controller, the operator has to stand ______

a)

Behind the shelter facing the air conditioning system.

b)

In front of the shelter facing the power generator unit.

c)

At the side of the shelter facing the entry door.

d)

At the side of the shelter facing the emergency exit door.

20.

What is the operating frequency of the PDA?

a)

50 Hz

b)

60 Hz

c)

70 Hz

d)

80 Hz

21.

The carbon monoxide alarm will be triggered within 3 mins if the concentration of CO is more than ____ parts per million (ppm).

a)

50

b)

100

c)

200

d)

300

22.

What is not a main component of PDA?

a)

Uninterruptible Power Supply (UPS)

b)

Drawer breaker assembly

c)

Control System Assembly

d)

Power supply lighting

23.

The CCTV Camera is able to pan ___ from its mounting point.

a)

90°

b)

180°

c)

270°

d)

360°

24.

The TCP allows operators to be inside and safely ______

a)

Control the DLS remotely during operations.

b)

Monitor the status of the DLS during operations.

c)

Control the LM remotely during operations.

d)

Monitor the status of the LM during operations.

25.

The UPS will continue supplying power to the various equipment when the ______

a)

EPO button at PGU is pressed.

b)

EPO button at power distribution board is pressed.

c)

Mains or PGU power supply trip.

d)

UPS is in bypass mode.

26.

The UPS shall be able to maintain power for a min of __mins when there is a power trip.

a)

10

b)

15

c)

20

d)

25

27.

The CCTV camera has a __ time optical zoom.

a)

30

b)

40

c)

50

d)

60

28.

Where is the hydraulic motor-driven pump installed?

a)

Below the handheld controller

b)

Above the handheld controller

c)

Below the hydraulic fluid reservoir

d)

Above the hydraulic fluid reservoir

29.

What is the purpose of the hydraulic filter?

a)

It provides a consistent viscosity of the hydraulic fluid.

b)

It prevents air bubbles from building up in the hydraulic reservoir.

c)

It filters impurities and contaminants found in the hydraulic fluid.

d)

It provides a consistent flowrate within the hydraulic system.

30.

The Power Selection Box can be used to ____.

a)

Select power source from mains or UPS

b)

Select power source from PGU or UPS

c)

Select power source from mains or PGU

d)

All of the above

31.

Which of the following does the Power Distribution Board distributes power to?

a)

Lighting and Power utility

b)

Antenna Mast and ACS

c)

UPS Rack and DCNS Rack

d)

All of the above

32.

The TCP houses DCNS in order to link up the ___ and ___.

a)

LM, WEC

b)

DLS, WEC

c)

C2 Centre, DLS

d)

C2 Centre, WEC

33.

Which of the following has to ensured when performing mast extension for operations?

a)

Earthing kit and grounding cables installed.

b)

Air terminal rod and VHF antenna securely installed.

c)

Shelter is on levelled and stable on ground.

d)

All of the above.

34.

Upon successful crank attempt with the PGU's engine, what is the purpose of the countdown safety delay?

a)

To allow the starter motor to disengage.

b)

To ensure proper engine cooling.

c)

To stabilize the engine's start up.

d)

To start battery charging process.

35.

To activate PGU for LM from the EGL, which of the following has to be performed?

a)

Switch the LOC/0/REM switch from REM to LOC at the GenSet LCCP

b)

Switch the LOC/0/REM switch from REM to LOC at the EGL panel

c)

Switch the LOC/0/REM switch from 0 to REM at the GenSet LCCP

d)

Switch the LOC/0/REM switch from 0 to REM at the HMI Panel

36.

What should you do if the general alarm at the remote control unit does not go off when pressed?

a)

Enable the heating/cooling by pass switch

b)

Perform a lamp test for 5 sec

c)

Identify and clear the fault source

d)

Replace the UPS and UPS rack fan.

37.

In the event of a ______, only degraded mode 2 should be used.

a)

Faulty Primary Pump

b)

Faulty Mast Motor

c)

Faulty levelling unit

d)

Faulty axillary pump

38.

Describe what are the functions that the operator can perform for NOMINAL and degraded mode 1.

a)

Levelling

b)

P2M Lock/Unlock

c)

Setting on site

d)

All of the above

39.

Handcrank of the mast can be achieved by ensuring the raising device is at the _____ position.

a)

Unlock

b)

Lock

c)

Move

d)

No-move

40.

Hydraulic power for automatic mode and degraded mode 1 are supplied by the _____ pump.

a)

Coolant

b)

Auxiliary

c)

Primary

d)

External Pump

41.

What is the full fuel capacity of LM PGU?

a)

60L

b)

175L

c)

220L

d)

300L

42.

What is the voltage output of the PGU?

a)

416VAC, 3ϕ 400Hz

b)

240VAC, 3ϕ 50Hz

c)

400VAC, 3ϕ 50Hz

d)

400VAC, 1ϕ 50Hz

43.

The PGU for LM will shut down when the fuel capacity is below 5% to prevent ___ ____.

a)

Overheating

b)

Air lock

c)

Fuel lock

d)

Engine oil lock

44.

What is max flow rate of the fuel nozzle for LM's PGU during hot refueling?

a)

10L/min

b)

15L/min

c)

20L/min

d)

25L/min

45.

Limitation of flowrate during refueling is to _______.

a)

avoid foaming in the tank

b)

allow new fuel to mix well with the existing fuel

c)

prevent accident over refueling

d)

allow air to escape from tank properly

46.

The 3 factors that determine severity of electrical shocks are:

a)

Qty of voltage through the body, path of voltage through the body and length of time the voltage goes through the body

b)

Qty of current through the body, path of current through the body and length of time the current goes through the body

c)

Density of current through the body, wavelength of current through the body and mass of current through the body

d)

Density of voltage through the body, wavelength of voltage through the body and mass of voltage through the body

47.

Depressing the Emergency stop button on the EGL panel will:

a)

halt operation of all hydraulic lifting jacks

b)

Halt the operation of EGL

c)

Shut down the PGU

d)

Trip all circuit breakers at the power distribution box

48.

How many PW-SEQ are there for each LM?

a)

4

b)

5

c)

6

d)

7

49.

There are 2 relay board in electronic board, what are the 2 relay board control?

a)

PGU, ABP

b)

UMB, EGL

c)

PGU, EGL

d)

None of the above

50.

The EGL panel has a test connector that is an interface with the _______.

a)

Special Test Equipment

b)

Sensor Test Equipment

c)

External Test Equipment

d)

Cable Test Equipment