WorksheetsISTQB Question Bank 381 to 420
Total questions: 40
Worksheet time: 10hrs 0mins
Interoperability (compatibility) testing, reliability testing, performance testing
System testing, performance testing
Load testing, stress testing, component testing, portability testing
Testing various configurations, beta testing, load testing
SO-S1-S2-S4-S1-S4
SO-S1-S2-S3-S1-S2
SO-S1-S4-S1-S2-S3
SO-S1-S2-S3-S4-S1
One
Indefinite
Two
Four
Prospective – Active – Resigned – Active – Terminated – Purged
Prospective – Active – On Leave – Active – Resigned – Retired
Prospective – Active – Retired – Active – On Leave – Purged
Prospective – Active – On Leave – Active – Retired – Active
Which test approaches or strategies are characterized by the descriptions below?
S4, T3, U2, V1
S1, T2, U3, V4
S2, T3, U1, V4
S3, T4, U2, V1
Which of the following project inputs influence testing?
<br>
(I) Contractual requirements
(II) Legal requirements
(III) Industry standards
(IV) Application risk
(V) Project size
(I) through (III) are correct
All alternatives are correct
(II) and (V) are correct
(I), (III) and (V) are correct
SO-S1-S2-S4-S1-S4-S1-S2-S3-S1
SO-S1-S2-S4-S1-S2-S3-S1
SO-S1-S4-S1-S2-S3-S1
SO-S1-S2-S4-S1-S4-S1-S2-S3
Decision coverage
Condition coverage
Statement coverage
Path Coverage
Based on the IEEE Standard for Software test Documentation (IEEE Std 829-1998), which of the following sections is part of the test summary report?
<br>
a) Test summary and report identifier of Summary
c) Variances
d) Anomalies
e) Comprehensive assessment
f) Approvals
a, b, e and f
a, b, c, d and f
a, b, c, e and f
a, b, c and f
Unit testing
Algorithm specific testing
Compatibility testing
Black box testing
