wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

QUIZ TQM MAC 2023

Total questions: 15

Worksheet time: 22mins

Name
Class
Date
1.

Continuous improvement means...

a)

constantly introducing small incremental changes in a business in order to improve quality and/or efficiency.

b)

Introducing big changes in a business in order to improve quality and/or efficiency.

c)

Introducing changes only when needed in order to improve quality and/or efficiency

2.

What is the main objective of the Poka-Yoke?

a)

Carry out product inspections

b)

Eliminate operations that are performed during the manufacture of a product

c)

Focus a process or finish a product by reducing or eliminating defects

d)

Designing a process so that it can only be performed correctly

3.

Who determines the level of quality of a product/service?

a)

The supplier

b)

The CEO

c)

The quality control manager

d)

The customer

4.

Other than improving the quality of the product, what other advantage is there to using quality circles?

a)

They are cheap to run

b)

They can motivate staff who feel involved and responsible

c)

They improve the quality of the product

d)

Means that managers don't have to be involved

5.
Who develop fishbone or cause-and-effect Diagram?
a)
Kaoru Ishikawa
b)
W Edwards Deming
c)
Juseph Juran
d)
Philp Crosby
6.

Which of the following are key components of a Total Quality Management system?

a)

Individual responsibility, incremental improvement, use of raw data

b)

Collective responsibility, continual improvement, use of raw data

c)

Group responsibility, staged improvement, knowledge

d)

Involves everyone, continual improvement, use of data and knowledge

7.

Which one is not part of kaizen process?

a)

Standardize Process

b)

Celebrate Success

c)

Develop System

8.

The Kaizen tool that involves, first-hand observation is

a)

Six Sigma

b)

Gemba

c)

5S

d)

TPM

9.

Which of the following is general Kanban practices

a)

Visualize

b)

Limit WIP

c)

improve and evolve

d)

All of the above

10.

Value Stream Mapping is a tool that help you to

a)

See how much value you add

b)

See and understand the flow of material and information

c)

See the core value of the company

d)

See the what is the most important value

11.

The actual time it takes to complete one job cycle is called as

a)

Cycle Time

b)

Processing Time

c)

Lead Time

d)

Takt Time

12.

Based on the picture given, what is included in the Value Stream Mapping component?

a)

Information Flow, Transportation Flow, Time

b)

Customer-Supplier Flow, Process Flow, Lead Time Flow

c)

Information Flow, Material Flow, Time

d)

Customer-Supplier Flow, Transportation Flow, Lead Time Flow

13.

The following are waste /muda in an organization :

a) People waiting on material or equipment

b) unused records in a database

c) creating reports no one reads

d) requiring unnecessary signatures on a document

Identify the waste

a)

Waiting, Motion , Defect, Overprocessing

b)

Motion, Defect , Overproduction, Overprocessing

c)

Waiting , Inventory , Overproduction, Overprocessing

d)

Transport, Waiting , Inventory , Overproduction,

14.

The following are the benefits of Employee Empowerment except:

a)

cost benefit

b)

improved work outcomes

c)

decrease employee retention

d)

increased employee satisfaction

15.

Why is Kanban considered a method of Continuous Improvement?

a)

Because there is visibility of the workflow.

b)

Because it is based on a Minimum Viable Product.

c)

Because it recommends the use of Plan, Do, Check and Act.

d)

Because the Product Backlog is in continuous refinement.