WorksheetsPROFESSIONAL PRACTICE
Total questions: 61
Worksheet time: 21mins
SPP Document 203 replaced what document?
1979 UAP DOC 203
1976 UAP DOC 203
1969 UAP DOC 203
1967 UAP DOC 203
Which of the following do not fall in specialized allied services- design services?
Facilities Maintenance Support
Site and Physical Planning Services
Plumbing Systems Design
Contract Documentation and Review
_____ deals with specific expertise for further enhancement of the architectural interior and exterior components of a project.
Pre-design services
Specialized Allied Services
Architect
Consultant
What is SPP Document 203?
1979 UAP DOC 203
Specialized Allied Services
Pre-design Services
Regular Design Services
Which of the following is not performed by the specialist architect?
prescribes space plans, stacking diagrams/sections and computations of areas for the
different activities and spaces to be integrated in a building Project.
conceptualizes the specifications for the needed civil works and utility lines.
lays out and prescribes furniture / built-ins / equipment for the project and prepares
specifications of AI components including all floor / wall / ceiling finishes, doors and partition
systems, hardware, modular or ready-assembled furniture pieces/ systems, equipment,
furnishings, built-ins, fixtures, signages and graphic devices, etc.
assists the Client in conducting bids or negotiations with General Contractors,
sub-contractors and suppliers of building materials, furniture, equipment, fixtures, etc.
In SPP document 203, _____may also be defined as the blending of aesthetics, functions, space, materials, and the environment resulting from the application of various technologies and skills in different fields.
Interior Designer
Architect
Contractor
Engineer
____ Involves the detailed planning and design of the indoor/enclosed areas of any proposed building/structure including retrofit, renovation, rehabilitation, or expansion work which shall cover all architectural and utility aspects. Including the architectural lay outing of all building engineering systems found therein.
Comprehensive Development Planning
Architectural Lighting and Design
Preliminary Services
Architectural Interiors
Under specialized allied services - architectural interiors method of compensation, the Architect’s Fee shall be a percentage of the cost of the AI work. This excludes the fee of?
Engineering and or specialist consultants
Transportation and or pre-design services
Materials and or labour
Conceptualization and or rendering services
Is a term who may be the holder of a valid specialist certificate that may be issued by the board and/or the commission, upon due qualification or accreditation by the IAPOA.
Consulting Architect
Client
Interior Designer
Landscape Architect
The architect is considered a _______ commissioned by the Owner/Client to plan and design the building/structure and all its utilities and to coordinate the works of all allied design professionals involved in the project including all inter-disciplinary and specialized works.
Agent
Manager
Prime professional
Supervisor
_____ involves the detailed planning and design to control sound transmission for compatibility with the architectural design concept.
Forensic Architecture
Building Appraisal
Architectural Interiors
Acoustic Design Services
Under specialised allied services - acoustic design scope of services, which of the
following does the architect NOT perform?
Assists the Owner/ Client in bidding out the work or in negotiating with a specialty
sub-contractor
Conducts final inspection of work and equipment
Conducts final inspection of work and fixtures
Checks and approves samples of materials and equipment
_______ are based on the concept of expanded physical planning services to include other activities necessary for the proper handling of the numerous components considered in the formulation, implementation and realization of a Master Development
Plan (MDP).
comprehensive development planning services
site development planning services
design-build services
construction management services
________ involves the detailed planning and design of light transmission, timing and control for compatibility with the architectural design concept.
Architectural Lighting Layout and Design
Light Layout and Electrical Design
Lighting Design
Electrical Lighting Layout and Design
Under specialized allied services architectural light layouting and design method of compensation, should the client hire separately the services of Specialist Consultants, the fee shall be for the account of the client and shall be paid directly to the ____?
Contractor
Architect
Project Manager
Interior Designer
________ refers to the orderly arrangement within a piece of land or property on which vertical structures such as buildings, monuments and the like, as well as horizontal developments such as rights-of-way (ROWs), open spaces and activity spaces are to be proposed.
Physical planning
Road planning
Site development planning
Site planning
The ________ is concerned not merely with a building / structure but with its immediate
surroundings as well. In planning for a building, he studies its interrelationship with other
structures, the surrounding environment, and their effect and impact on the neighboring
areas.
Architect
Engineer
Contractor
Project Manager
Should other services be required by the project, such as environmental studies,
feasibility studies, market analysis, access / movement systems, impact analysis and others, said services should be performed by duly-qualified professionals with the Architect acting as the _______ of the physical planning team.
supervisor
dictator
lead professional
project manager
Under Site Development Planning Services - scope of services, which of the following does the architect NOT perform?
conceptualizes the entire site development plan (SDP) including the generic scope of civil
works and the general scope of softscape and hardscape requirements.
coordinate with the client and contractor for proper planning
assists the Owner/Client in bidding out the work or negotiating with landscape, waterscape,
rock formation contractors, etc., but mainly when no SC is available.
endorse necessary materials to the client to gain additional income from the project
If the Architect is commissioned to do physical plans for specific site, which of the
following does must he NOT do?
go beyond the study of human behavior and activities and must undertake an in-depth
study of the host site’s economic systems
cut necessary landscape and pollute clean waters for the project
study its laws and regulations, tax structure, infrastructure, utilities, and all other
components that will have a bearing on the project.
all of the above
The Architect in this area of practice engages in methods of producing building
components in a highly engineered, efficient and cost-effective manner, particularly for residential and commercial applications.
Building Systems Design
Building Testing and Commisioning
Economic Design
Security Evaluation and Planning
Under Site Development Planning Services, should the project be large in scale, the Architect must ____?
cater all responsibility for the large scale project
coordinate with the client and contractor for proper planning
hire other state-regulated professionals (RLPs) as qualified Specialist Consultants (SCs)
schedule designated meetings and proposals for the client
Under the scope of services of comprehensive development planning (CDP) , _______ is defined as the relationship of adopted development proposals and policies to existing laws.
Transport Component
Socio-Cultural Component
Economic Component
Legal and Administrative Component
The Consulting Architect in this area of practice must have much more than the basic
knowledge of Research Methods, Philippine Architecture and its History, Architectural
Materials and Finishes, Building Types and Standards, Architectural Design Trends,
Architectural Writing and Architectural Photography.
Forensic Architecture
Historic and Heritage Conservation and Planning
Architectural Research Methods
Special Building/ Facility Planning and Design
The Architect in this area of practice recommends the systematic process of ensuring that a building / structure’s array of systems is planned, designed, installed and tested to perform according to the design intent and the building’s operational needs.
Building Systems Design
Building Testing and Commissioning
Economic Design
Security Evaluation and Planning
The suitably trained and experienced Consulting Architect in this area of architectural practice provides research, assessment, recording, management, interpretation and conservation of historical heritage.
Forensic Architecture
Landscape Design
Historic and Heritage Conservation and Planning
Facilities Maintenance Support
The Architect in this area of practice undertakes a scientific study on the built
environment’s well-being, which allows the Architect to focus on the ways in which the building/structure can best maintain itself and prolong its life in a cost-efficient manner, and finally provide recommendations to the Owner/ Client.
Forensic Architecture
Building Systems Design
Historic and Heritage Conservation and Planning
Facilities Maintenance Support
What method is essentially the same as Design-Build Services by Administration except that the Architect provides the Owner/ Client a guaranteed maximum project construction cost for the construction of the project?
Design-Build Services with minimum Project Construction Cost
SPP Document 204-A (Construction Services)
SPP Document 207 (Design-Build Services)
Design-Build Services with Guaranteed Maximum Project Construction Cost
In Acoustic Design Services, the ________ is the prime professional commissioned by
the Owner/Client to plan and design the building / structure and all its utilities and to
coordinate the works of all allied design professionals involved in the project including all
inter-disciplinary and specialized works.
Architect
Contractor
Client
Foreman
The fee of the architect rendering architectural interior services is:
12-20%
10-20%
5-15%
10-15%
How many percentage of the total cost should be the architect get from a specialized architectural services?
15%
10%
5%
20%
The suitably trained and experienced consulting architect in this area of architectural practice provides research assessment, recording, management, interpretation, and conservation of historic heritage.
Site development planning
Security evaluation and planning
Historic and heritage conservation and planning
None of the above
The nation’s assets and its management.
Economic component
Socio-cultural component
Transport component
None of the above
Ensure the proper function and maintenance of the building/structure and site after final inspection.
Facilities maintenance support
Building environment certification
Forensic Architecture
None of the above
The systematic process of ensuring that a building/structure’s array of systems is
planned, designed, installed and tested to perform according to the design intent and the building’s operational needs.
Building environment certification
Building testing and commissioning
Building Appraisal
Contract documentation and review services
Scientific study on the built environment’s well being.
Building testing and commissioning
Architectural Interiors
Forensic Architecture
Building systems design
The consulting architect in this area of practice must have much more than the basic knowledge of research methods, Philippine Architecture and its history, architectural materials and finishes, building types and standards.
Architectural Research methods
Historic and heritage conservation and planning
Acoustic design
None of the above
It is design as an act or process of estimating value.
Building appraisal
Preliminary Services
Building Components
None of the above
The architect in this area of practice must have much more than the basic knowledge of the various mode of an alternative dispute resolution prescribed under R.A. 9285.
Security evaluation and planning
Dispute avoidance and resolution
Dispute resolution
Post design services
Construction Management Services
SPP 204a
SPP 204b
Non listed
SPP 206
Evaluate the initial design program vs the actual use of the facility
Grounds and landscaping supervision
Post-construction evaluation
Building maintenance
Monthly salary
The consulting architect in this area of practice must have much more than the basic knowledge of Green Architecture and environmental and/or sustainable design and enough knowledge of the governing environmental laws.
Sustainable architecture design services
Building environment certification
Facilities maintenance support
None of the above
Formulate and enforce rules for the proper use of the building and facility, particularly in the common areas and the emergency/egress/exit areas
Grounds and landscaping supervision
Post-construction evaluation
Building maintenance
Monthly Salary
Which of the following conditions:
1. 10 percent excess of guaranteed maximum cost divided equally between architect and client
2. Savings on project construction cost divided equally between architect and client
3. More than 10 percent excess of guaranteed maximum cost paid by architect
4. More than 10 percent excess of guaranteed maximum cost paid by architect but only up to the
amount of his administration fee
Describes design-build service on a guaranteed maximum cost.
(2,3)
(2,4)
(1,2)
(1,4)
Monitor maintenance and upkeep services (cleanliness of corridors, lobbies, stairs and other common areas, exits, parking areas, garbage collection)
Building maintenance
Grounds and landscaping supervision
Post-construction evaluation
Monthly salary
One of the four principal members who performs the construction work
Owner
Architect
Engineer
Contractor
Which among the following is part of an architect’s job as a full-time supervisor?
● Quality Control of Work
● Money Allocation for Materials
● Evaluation and Construction Work
● Keeping of Records, Reports, and Contract Documents
i, ii
i,ii,iii
i,iii,iv
all of the above
For the preparation of detailed engineering drawings and specifications on roads, drainage, sewerage, power and communication system, an additional fee of how many percent of the cost of the development is to be charged?
2%
3%
4%
5%
Which of the following post construction services is concerned with the monitoring of security and janitorial services?
Building and equipment maintenance
Building and grounds administration
Post-construction evaluation
None of items listed
Which of the following is a study to determine the viability of a project?
Economic Feasibility Studies
Financial Feasibility Studies
Commercial Feasibility Studies
Income-expense studies
Which of the following conditions:
1. 10 percent maximum excess over guaranteed maximum cost
2. Savings on project construction cost divided equally between architect and client
3. 10 percent excess of guaranteed maximum cost divided equally between architect and
client
4. More than 10 percent excess of guaranteed maximum cost paid by architect
5. All items listed
Describe the design-build services on guaranteed maximum cost?
1,2,3
2,3,4
1,3,4
5
What is the normal fee for design-build services by administration?
6%
7%
8%
9%
While the Architect is not expected to provide the whole range of comprehensive architectural services, what role does he perform for the client?
Agent
Contractor
Consulting Architect
Project Manager
The Consulting Architect in this area of practice must have much more than the
basic knowledge of Site Analysis, Space Planning and Management, Architectural Programming, and the other services under SPP Document 201.
Regular Services
Preliminary Services
Design-build Services
Construction Services
When the Owner hires an Architect of a firm to coordinate the whole range of
Comprehensive Architectural Services, it shall constitute?
Project Management
Architect
Inspector
Construction Manager
Which of the following post-construction services include evaluation of functional effectiveness of plans?
Building/Equipment Maintenance
Functional Analysis
Post-Construction Evaluation
Building Functions Evaluation
Which of the following is NOT part of the scope of Design-Build Services by
Administration?
Schematic Design Phase
Construction Phase
Contract Document Phase
Where does Planning Services fall?
Special (Allied) Services
Regular Services
Design and Planning Services
Construction Services
Comprehensive Architectural Services
SPP No. 207
SPP No. 206
SPP No. 205
SPP No. 204
Substantial completion shall mean the value of the work completed not less than.
95%
98%
88%
85%
Post-Construction Services
SPP 207
SPP 204b
SPP 206
SPP 205