PROFESSIONAL PRACTICE

Total questions: 61

Worksheet time: 21mins

Name
Class
Date
1.

SPP Document 203 replaced what document?

a)

1979 UAP DOC 203

b)

1976 UAP DOC 203

c)

1969 UAP DOC 203

d)

1967 UAP DOC 203

2.

Which of the following do not fall in specialized allied services- design services?

a)

Facilities Maintenance Support

b)

Site and Physical Planning Services

c)

Plumbing Systems Design

d)

Contract Documentation and Review

3.

_____ deals with specific expertise for further enhancement of the architectural interior and exterior components of a project.

a)

Pre-design services

b)

Specialized Allied Services

c)

Architect

d)

Consultant

4.

What is SPP Document 203?

a)

1979 UAP DOC 203

b)

Specialized Allied Services

c)

Pre-design Services

d)

Regular Design Services

5.

Which of the following is not performed by the specialist architect?

a)

prescribes space plans, stacking diagrams/sections and computations of areas for the

different activities and spaces to be integrated in a building Project.

b)

conceptualizes the specifications for the needed civil works and utility lines.

c)

lays out and prescribes furniture / built-ins / equipment for the project and prepares

specifications of AI components including all floor / wall / ceiling finishes, doors and partition

systems, hardware, modular or ready-assembled furniture pieces/ systems, equipment,

furnishings, built-ins, fixtures, signages and graphic devices, etc.

d)

assists the Client in conducting bids or negotiations with General Contractors,

sub-contractors and suppliers of building materials, furniture, equipment, fixtures, etc.

6.

In SPP document 203, _____may also be defined as the blending of aesthetics, functions, space, materials, and the environment resulting from the application of various technologies and skills in different fields.

a)

Interior Designer

b)

Architect

c)

Contractor

d)

Engineer

7.

____ Involves the detailed planning and design of the indoor/enclosed areas of any proposed building/structure including retrofit, renovation, rehabilitation, or expansion work which shall cover all architectural and utility aspects. Including the architectural lay outing of all building engineering systems found therein.

a)

Comprehensive Development Planning

b)

Architectural Lighting and Design

c)

Preliminary Services

d)

Architectural Interiors

8.

Under specialized allied services - architectural interiors method of compensation, the Architect’s Fee shall be a percentage of the cost of the AI work. This excludes the fee of?

a)

Engineering and or specialist consultants

b)

Transportation and or pre-design services

c)

Materials and or labour

d)

Conceptualization and or rendering services

9.

Is a term who may be the holder of a valid specialist certificate that may be issued by the board and/or the commission, upon due qualification or accreditation by the IAPOA.

a)

Consulting Architect

b)

Client

c)

Interior Designer

d)

Landscape Architect

10.

The architect is considered a _______ commissioned by the Owner/Client to plan and design the building/structure and all its utilities and to coordinate the works of all allied design professionals involved in the project including all inter-disciplinary and specialized works.

a)

Agent

b)

Manager

c)

Prime professional

d)

Supervisor

11.

_____ involves the detailed planning and design to control sound transmission for compatibility with the architectural design concept.

a)

Forensic Architecture

b)

Building Appraisal

c)

Architectural Interiors

d)

Acoustic Design Services

12.

Under specialised allied services - acoustic design scope of services, which of the

following does the architect NOT perform?

a)

Assists the Owner/ Client in bidding out the work or in negotiating with a specialty

sub-contractor

b)

Conducts final inspection of work and equipment

c)

Conducts final inspection of work and fixtures

d)

Checks and approves samples of materials and equipment

13.

_______ are based on the concept of expanded physical planning services to include other activities necessary for the proper handling of the numerous components considered in the formulation, implementation and realization of a Master Development

Plan (MDP).

a)

comprehensive development planning services

b)

site development planning services

c)

design-build services

d)

construction management services

14.

________ involves the detailed planning and design of light transmission, timing and control for compatibility with the architectural design concept.

a)

Architectural Lighting Layout and Design

b)

Light Layout and Electrical Design

c)

Lighting Design

d)

Electrical Lighting Layout and Design

15.

Under specialized allied services architectural light layouting and design method of compensation, should the client hire separately the services of Specialist Consultants, the fee shall be for the account of the client and shall be paid directly to the ____?

a)

Contractor

b)

Architect

c)

Project Manager

d)

Interior Designer

16.

________ refers to the orderly arrangement within a piece of land or property on which vertical structures such as buildings, monuments and the like, as well as horizontal developments such as rights-of-way (ROWs), open spaces and activity spaces are to be proposed.

a)

Physical planning

b)

Road planning

c)

Site development planning

d)

Site planning

17.

The ________ is concerned not merely with a building / structure but with its immediate

surroundings as well. In planning for a building, he studies its interrelationship with other

structures, the surrounding environment, and their effect and impact on the neighboring

areas.

a)

Architect

b)

Engineer

c)

Contractor

d)

Project Manager

18.

Should other services be required by the project, such as environmental studies,

feasibility studies, market analysis, access / movement systems, impact analysis and others, said services should be performed by duly-qualified professionals with the Architect acting as the _______ of the physical planning team.

a)

supervisor

b)

dictator

c)

lead professional

d)

project manager

19.

Under Site Development Planning Services - scope of services, which of the following does the architect NOT perform?

a)

conceptualizes the entire site development plan (SDP) including the generic scope of civil

works and the general scope of softscape and hardscape requirements.

b)

coordinate with the client and contractor for proper planning

c)

assists the Owner/Client in bidding out the work or negotiating with landscape, waterscape,

rock formation contractors, etc., but mainly when no SC is available.

d)

endorse necessary materials to the client to gain additional income from the project

20.

If the Architect is commissioned to do physical plans for specific site, which of the

following does must he NOT do?

a)

go beyond the study of human behavior and activities and must undertake an in-depth

study of the host site’s economic systems

b)

cut necessary landscape and pollute clean waters for the project

c)

study its laws and regulations, tax structure, infrastructure, utilities, and all other

components that will have a bearing on the project.

d)

all of the above

21.

The Architect in this area of practice engages in methods of producing building

components in a highly engineered, efficient and cost-effective manner, particularly for residential and commercial applications.

a)

Building Systems Design

b)

Building Testing and Commisioning

c)

Economic Design

d)

Security Evaluation and Planning

22.

Under Site Development Planning Services, should the project be large in scale, the Architect must ____?

a)

cater all responsibility for the large scale project

b)

coordinate with the client and contractor for proper planning

c)

hire other state-regulated professionals (RLPs) as qualified Specialist Consultants (SCs)

d)

schedule designated meetings and proposals for the client

23.

Under the scope of services of comprehensive development planning (CDP) , _______ is defined as the relationship of adopted development proposals and policies to existing laws.

a)

Transport Component

b)

Socio-Cultural Component

c)

Economic Component

d)

Legal and Administrative Component

24.

The Consulting Architect in this area of practice must have much more than the basic

knowledge of Research Methods, Philippine Architecture and its History, Architectural

Materials and Finishes, Building Types and Standards, Architectural Design Trends,

Architectural Writing and Architectural Photography.

a)

Forensic Architecture

b)

Historic and Heritage Conservation and Planning

c)

Architectural Research Methods

d)

Special Building/ Facility Planning and Design

25.

The Architect in this area of practice recommends the systematic process of ensuring that a building / structure’s array of systems is planned, designed, installed and tested to perform according to the design intent and the building’s operational needs.

a)

Building Systems Design

b)

Building Testing and Commissioning

c)

Economic Design

d)

Security Evaluation and Planning

26.

The suitably trained and experienced Consulting Architect in this area of architectural practice provides research, assessment, recording, management, interpretation and conservation of historical heritage.

a)

Forensic Architecture

b)

Landscape Design

c)

Historic and Heritage Conservation and Planning

d)

Facilities Maintenance Support

27.

The Architect in this area of practice undertakes a scientific study on the built

environment’s well-being, which allows the Architect to focus on the ways in which the building/structure can best maintain itself and prolong its life in a cost-efficient manner, and finally provide recommendations to the Owner/ Client.

a)

Forensic Architecture

b)

Building Systems Design

c)

Historic and Heritage Conservation and Planning

d)

Facilities Maintenance Support

28.

What method is essentially the same as Design-Build Services by Administration except that the Architect provides the Owner/ Client a guaranteed maximum project construction cost for the construction of the project?

a)

Design-Build Services with minimum Project Construction Cost

b)

SPP Document 204-A (Construction Services)

c)

SPP Document 207 (Design-Build Services)

d)

Design-Build Services with Guaranteed Maximum Project Construction Cost

29.

In Acoustic Design Services, the ________ is the prime professional commissioned by

the Owner/Client to plan and design the building / structure and all its utilities and to

coordinate the works of all allied design professionals involved in the project including all

inter-disciplinary and specialized works.

a)

Architect

b)

Contractor

c)

Client

d)

Foreman

30.

The fee of the architect rendering architectural interior services is:

a)

12-20%

b)

10-20%

c)

5-15%

d)

10-15%

31.

How many percentage of the total cost should be the architect get from a specialized architectural services?

a)

15%

b)

10%

c)

5%

d)

20%

32.

The suitably trained and experienced consulting architect in this area of architectural practice provides research assessment, recording, management, interpretation, and conservation of historic heritage.

a)

Site development planning

b)

Security evaluation and planning

c)

Historic and heritage conservation and planning

d)

None of the above

33.

The nation’s assets and its management.

a)

Economic component

b)

Socio-cultural component

c)

Transport component

d)

None of the above

34.

Ensure the proper function and maintenance of the building/structure and site after final inspection.

a)

Facilities maintenance support

b)

Building environment certification

c)

Forensic Architecture

d)

None of the above

35.

The systematic process of ensuring that a building/structure’s array of systems is

planned, designed, installed and tested to perform according to the design intent and the building’s operational needs.

a)

Building environment certification

b)

Building testing and commissioning

c)

Building Appraisal

d)

Contract documentation and review services

36.

Scientific study on the built environment’s well being.

a)

Building testing and commissioning

b)

Architectural Interiors

c)

Forensic Architecture

d)

Building systems design

37.

The consulting architect in this area of practice must have much more than the basic knowledge of research methods, Philippine Architecture and its history, architectural materials and finishes, building types and standards.

a)

Architectural Research methods

b)

Historic and heritage conservation and planning

c)

Acoustic design

d)

None of the above

38.

It is design as an act or process of estimating value.

a)

Building appraisal

b)

Preliminary Services

c)

Building Components

d)

None of the above

39.

The architect in this area of practice must have much more than the basic knowledge of the various mode of an alternative dispute resolution prescribed under R.A. 9285.

a)

Security evaluation and planning

b)

Dispute avoidance and resolution

c)

Dispute resolution

d)

Post design services

40.

Construction Management Services

a)

SPP 204a

b)

SPP 204b

c)

Non listed

d)

SPP 206

41.

Evaluate the initial design program vs the actual use of the facility

a)

Grounds and landscaping supervision

b)

Post-construction evaluation

c)

Building maintenance

d)

Monthly salary

42.

The consulting architect in this area of practice must have much more than the basic knowledge of Green Architecture and environmental and/or sustainable design and enough knowledge of the governing environmental laws.

a)

Sustainable architecture design services

b)

Building environment certification

c)

Facilities maintenance support

d)

None of the above

43.

Formulate and enforce rules for the proper use of the building and facility, particularly in the common areas and the emergency/egress/exit areas

a)

Grounds and landscaping supervision

b)

Post-construction evaluation

c)

Building maintenance

d)

Monthly Salary

44.

Which of the following conditions:

1. 10 percent excess of guaranteed maximum cost divided equally between architect and client

2. Savings on project construction cost divided equally between architect and client

3. More than 10 percent excess of guaranteed maximum cost paid by architect

4. More than 10 percent excess of guaranteed maximum cost paid by architect but only up to the

amount of his administration fee

Describes design-build service on a guaranteed maximum cost.

a)

(2,3)

b)

(2,4)

c)

(1,2)

d)

(1,4)

45.

Monitor maintenance and upkeep services (cleanliness of corridors, lobbies, stairs and other common areas, exits, parking areas, garbage collection)

a)

Building maintenance

b)

Grounds and landscaping supervision

c)

Post-construction evaluation

d)

Monthly salary

46.

One of the four principal members who performs the construction work

a)

Owner

b)

Architect

c)

Engineer

d)

Contractor

47.

Which among the following is part of an architect’s job as a full-time supervisor?

● Quality Control of Work

● Money Allocation for Materials

● Evaluation and Construction Work

● Keeping of Records, Reports, and Contract Documents

a)

i, ii

b)

i,ii,iii

c)

i,iii,iv

d)

all of the above

48.

For the preparation of detailed engineering drawings and specifications on roads, drainage, sewerage, power and communication system, an additional fee of how many percent of the cost of the development is to be charged?

a)

2%

b)

3%

c)

4%

d)

5%

49.

Which of the following post construction services is concerned with the monitoring of security and janitorial services?

a)

Building and equipment maintenance

b)

Building and grounds administration

c)

Post-construction evaluation

d)

None of items listed

50.

Which of the following is a study to determine the viability of a project?

a)

Economic Feasibility Studies

b)

Financial Feasibility Studies

c)

Commercial Feasibility Studies

d)

Income-expense studies

51.

Which of the following conditions:

1. 10 percent maximum excess over guaranteed maximum cost

2. Savings on project construction cost divided equally between architect and client

3. 10 percent excess of guaranteed maximum cost divided equally between architect and

client

4. More than 10 percent excess of guaranteed maximum cost paid by architect

5. All items listed

Describe the design-build services on guaranteed maximum cost?

a)

1,2,3

b)

2,3,4

c)

1,3,4

d)

5

52.

What is the normal fee for design-build services by administration?

a)

6%

b)

7%

c)

8%

d)

9%

53.

While the Architect is not expected to provide the whole range of comprehensive architectural services, what role does he perform for the client?

a)

Agent

b)

Contractor

c)

Consulting Architect

d)

Project Manager

54.

The Consulting Architect in this area of practice must have much more than the

basic knowledge of Site Analysis, Space Planning and Management, Architectural Programming, and the other services under SPP Document 201.

a)

Regular Services

b)

Preliminary Services

c)

Design-build Services

d)

Construction Services

55.

When the Owner hires an Architect of a firm to coordinate the whole range of

Comprehensive Architectural Services, it shall constitute?

a)

Project Management

b)

Architect

c)

Inspector

d)

Construction Manager

56.

Which of the following post-construction services include evaluation of functional effectiveness of plans?

a)

Building/Equipment Maintenance

b)

Functional Analysis

c)

Post-Construction Evaluation

d)

Building Functions Evaluation

57.

Which of the following is NOT part of the scope of Design-Build Services by

Administration?

a)

Schematic Design Phase

b)

Construction Phase

c)

Contract Document Phase

58.

Where does Planning Services fall?

a)

Special (Allied) Services

b)

Regular Services

c)

Design and Planning Services

d)

Construction Services

59.

Comprehensive Architectural Services

a)

SPP No. 207

b)

SPP No. 206

c)

SPP No. 205

d)

SPP No. 204

60.

Substantial completion shall mean the value of the work completed not less than.

a)

95%

b)

98%

c)

88%

d)

85%

61.

Post-Construction Services

a)

SPP 207

b)

SPP 204b

c)

SPP 206

d)

SPP 205