NEW
Font size
Worksheets4.3 V1SO FIX
Total questions: 22
Worksheet time: 33mins
GPL
Titil Bekal
The Issue Point.
Inventory Control.
What form is sent to the GPL if the TB does not have the part needed?
Form 40200.
Form 42020.
Form 42030.
A stock locator card.
21500
42020
42030
stock locator card
date the posting is done
balance in the warehouse
priority of the issue document
stock or part number of the item
21500
42020
46300
46330
After the items have been located.
After logging out in the warehouse.
After the component 1og has been checked.
Before dating and initialing the remarks block on the 40200.
42020
42030
46300
46330
The repairable processing center is located in
P3KP
the GUHAR
the receiving point
the squadron supply unit
P3KP
the GUHAR
the GUHARPUS
the squadron supply unit
repairs components
issues new components
sends components out for repair
receives repaired components from the GUHAR
21500, 40270, and 41400.
21500, 41400, and 43200.
21500,43200,and 44230.
21500, 41400, and 44230.
After a component has been repaired and returned to GPL, which form remains with it in storage?
21500
41400
43200
44230
What form is used as the turn in document sent from the Unit to RPC?
40170
41400
43200
44230
The RPC helper.
The RPC supervisor.
The local contractor.
The maintenance inspector.
What form is used when an item is transferred from RPC to P3KP?
21500
40170
41400
43200
Where are documents and paperwork logged after being signed for in Buku Expedisi?
Arsip.
Buku Besar.
Buku Agenda.
The work order.
status
document
Buku Agenda
correspondence control
Arsip
Buku Besar
Buku Agenda
Buku Expedisi
The Buku Besar.
The Buku Expedisi.
A blank work order.
A completed work order.
The work order.
The Buku Besar.
The Buku Agenda.
The Buku Expedisi.
Buku Expedisi
weapon system
item stock number
alphabetical order
documents
work orders and documents
paperwork which is not documents
files which are usually numerical
