Total questions: 87
Worksheet time: 2hrs 31mins
Doing something at lowest cost possible
Efficiency
Effectiveness
Productivity
Value
Doing the right things to create the most value for the company
Efficiency
Effectiveness
Productivity
Value
The characteristic of services
Perishable
Tangible
Time dependent
High customer interaction
The characteristic of goods
Tangible
Consisten definition
Decouple production and consumption
High customer interaction
What is the reasons of the company to globalize
Reduce cost
Improve supply chain
Attract local talent
Understand markets
The action plan to achieve mission is called
(a)
Productivity measures the process improvement
True
False
Multi factor productivity is the concept of productivity when there are multiple output
True
False
NBM Cook produces "Mid Exam Care Packages" for resale by his sorority. He is currently working a total of 5 hours per day to produce 100 care packages. What is NBM's productivity? (mention only the number)
(a)
NBM is the owner of Riverside Manufacturing, a producer of bicycle tires in USA. His company makes 10,000 tires per day with the resources provided in the above table. What is the overall productivity of Riverside Manufacturing? (Display only number)
(a)
When a firm offers a mix of both products and services, in comparison to the traditional focus on products, means that firm implements
Service option
Product option
Product service system
Product service option
Selling a promised level of illuminance in a building, according to a Pay per Lux concept is an example of product oriented in product service system
True
False
The options in product strategy includes
Differentiation
Low cost
Competitiveness
Rapid response
In product life cycle, negative cash flow occurs in the phase?
Introduction
Growth
Maturity
Decline
In the product life cycle, enhancing capacity is necessary during which phase?
Introduction
Growth
Maturity
Decline
Take an example of "Apple" products, product design is most likely to help business to
Generate quantitative research
Differentiate its products
Improve its organisational structure
Reduce productivity
The ... is a problem with the products design that makes the products unsuitable
Deceptive practice
Credit report agency
Design defects
Warranty
Quality function deployment start with identification of how goods and services will satisfy customer wants
True
False
Small variations in production or assembly do not adversely affect the product is definition of
Modular design
Design for manufacturability
Feature design
Robust design
There are number of ways to increase service efficiency such as:
Limit the options
Delay customisation
Modularisation
Automation
The choice between producing a component and purchasing it from an outside source is called
(a)
NBM Computer Numerical Control (CNC) Machine manufacturer is investigating the possibility of producing and marketing of new cutting machine. Undertaking this project will require purchasing sophisticated Computer Aided Manufacturing (CAM) software. With favourable acceptance by the market, sales would be 25 machines selling for $100,000 each. With unfavourable acceptance, sales would be 8 machines selling for $100,000 each. The cost of CAM software is $500,000 with manufacturing cost of $40,000 for each machine. The probability of favourable market acceptance is 0.4 and unfavourable is 0.6. Calculate the expected monetary value of buying CAM software?
(a)
The theoretical maximum output of a system in a given period under ideal conditions is called
Design capacity
Effective capacity
Utilisation
Efficiency
Utilisation is simply the percent of effective capacity actually achieved
True
False
The key to improving efficiency is often found in correcting quality problems and in effective scheduling, training, and maintenance.
True
False
If machines at NBM Company are designed to produce 1,000 smart phones per hour, and the plant operates 16 hrs./day. What is the design capacity of that machine?
Note: mention only the number without unit of measurement (example 1,000)
(a)
If machines at NBM Company are designed to produce 1,000 smart phones per hour, and the plant operates 16 hrs./day.
Currently the machine loses 3 hours of output per day (namely 0.5 hrs./day on preventive maintenance + 1 hr./day on employee breaks + 1.5 hrs./day setting up machines for different products). What is the effective capacity capacity?
Note: mention only the number without unit of measurement (example 1,000)
(a)
If machine at NBM Company are designed to produce 1,000 smart phones per hour, and the plant operates 16 hrs./day.
Currently the machine loses 3 hours of output per day (namely 0.5 hrs./day on preventive maintenance + 1 hr./day on employee breaks + 1.5 hrs./day setting up machines for different products). On average, the machine are not running 1 hr./day due to late parts and machine breakdowns. What is the actual output of the machine?
Note: mention only the number without unit of measurement (example 1,000)
(a)
The basic notion of economies of scale is that as a plant gets larger and volume increases, the average cost per unit of output drops.
True
False
The objective of break-even analysis is to find the point at which costs equal revenue. The company must operate below this level to achieve profitability.
True
False
There are two types of costs to consider when adding capacity: the cost of upgrading too frequently and that of upgrading too infrequently. Upgrading capacity too frequently is expensive. Conversely, upgrading capacity too infrequently is also expensive.
True
False
The capacity a firm expects to achieve given the current operating constraints is called
Design capacity
Effective capacity
Utilisation
Efficiency
What is the characteristic of project?
Using general purpose of equipment
Ease inventory control
Single unit of time
High labor skill
Project manager do monitoring on resources, cost, and time in which phase?
Planning
Scheduling
Controlling
Budgeting
A key project deliverable that organizes the work into manageable sections/modules is called
Planning
Organizing
Assigning
Work breakdown structure
What is the purpose of project scheduling?
Identify precedence relationship
Determining activity cost, time, and quality
Estimating material requirement
Determining critical activities
Critical path is the longest time path through the network
True
False
Length of time that an activity can be delayed without delaying the entire project is called
Completion time
Delayed time
Project time
Slack or float
Critical Path Method (CPM) uses a probability distribution for activity times
True
False
Variability in activity time follows beta distribution
True
False
Shortening the duration of the project is called
Project scheduling
Project planning
Project shortening
Project crashing
Project variance is computed by summing the variances of all activities
True
False
In PERT (Project Evaluation and Review Technique), what is the probability of completing project on time
0
0.25
0.5
0.75
1
NBM company run a project with an expected completion time 62 weeks and project variance 81. What is the probability that the project will be completed 18 weeks before its expected completion date? (Use three digits after comma)
Z=σDuedate−completiondate
σ=projectvariance
(a)
A production facility organized around processes to facilitate low volume and high variety production, is called
Process focus
Product focus
Mass customization
Repetitive
A rapid and low cost production that caters to constantly changing unique customer desires, is called
Process focus
Repetitive
Product focus
Mass customization
Postponement is the delay of any modifications or customization to a product as short as possible in the production process.
True
False
Below are several options to make mass customization works
Process design must be flexible and able to accommodate changes
Inventory management requires tight control
Responsive partner in the supply chain
Build to order design that include limited product line and modules
NBM enterprise would like to evaluate two accounting software products (A and B) to support changes in its internal accounting processes. Software A has fixed cost $300,000 and $20 per accounting report while software B has fixed cost $400,000 and $10 per accounting report. Which one should NBM enterprise choose when expected number of report is 5000?
(a)
A process that helps managers understand how to add value in the flow of material and information through the entire production process, is called
Flow chart
Time function mapping
Value stream mapping
Process chart
The technique for improving service productivity by structuring service so customers must go where the service is offered, is called
Separation
Self-service
Automation
Scheduling
Based on the degree of customization and degree of labor, professional service is categorized as having both high degree of customization and labor.
True
False
In the service blueprinting, middle layer consist of layer where customer may interact with service provider.
True
False
NBM copy shop has a volume of 125,000 black and white copies per month. Two salespeople has made presentations for machines of equal quality and reliability. The machine A has a cost of $2000 per month and a variable cost of $0.03. On the other hand, the machine B will cost only $1500 per month but the toner is more expensive, driving the cost per copy up to $0.035. If cost and volume are the only considerations, which machine should NBM purchase?
(a)
The ability to exist/survived for long periods without significant deterioration is called
Reliability
Performance
Conformance
Durability
The degree to which the servicing of an items can be accomplished with given resources
Performance
Conformance
Serviceability
Durability
Total Quality Management (TQM) stresses a commitment of quality management team to have a continuing drive to excellence
True
False
A program that designed to reduce defects, lower cost, and improve customer satisfaction is called
Continuous improvement
Six sigma
Taguchi method
Benchmarking
Select seven tools in Total Quality Management (TQM)
Histogram
Control Chart
Check Sheet
Box plot
... shows that cost increases as the product moves away from what the customer wants
Quality lost function
Target oriented quality
Quality robustness
Cost of quality
... uses statistical method to tell when to take corrective action
Flow chart
Control chart
Check sheet
Pareto diagram
A recent poll of 500 adults who flew with NBM airline in the past year found the following number of complaints about flying: cramped seat (45), cost (16), dislike or fear of flying (57), security (119), poor services (12), connecting flight (8), overcrowded planes (42), late planes/wait (57), food (7), lost luggage (7), and others (50). What percentage of those surveyed found nothing they disliked?
(a)
In the NBM insurance claims process with average of claim process is 210 minutes and standard deviation 0.516 minutes. The design specification to meet customer expectation is 200±3 minutes. Compute the process capability ratio. (use three digits after comma)
Cp=6σUpperSpecification−LowerSpecification
(a)
A process is said to be operating in statistical control when the only source of variation is natural or common cause.
True
False
Forecast range that deals with more comprehensive issue and support management decision is
Short term range
Medium term range
Long term range
Economic forecast
Forecast approach that involves intuition and experiences
Medium term forecast
Quantitative forecast
Qualitative forecast
Short term forecast
The forecasting method that consist of a process to arrive at consensus of a group opinion or decision by surveying a panel of experts
Sales force composite
Delphi
Market survey
Executive opinion
Select time series components in forecasting
Seasonal
Random
Deviation
Trend
Forecasting method that assumes demand in the next period is the same as in the most recent period
Naive
Moving average
Exponential smoothing
Seasonal
Increasing smoothing period (n) smooths the forecast but makes it less sensitive to change
True
False
A coefficient determination measures the change in Y predicted by the change in X
True
False
During the past 8 quarters, Patimban port has unloaded large quantities of grain from the ship. Operation manager of Patimban guesses the forecast for the first quarter was 175 tons but the actual tonnage unloaded was 180 tons. Calculate the forecast for the next period using smoothing constant of 0.1. (use one digit after comma)
(a)
A forecast error that is consistently higher or consistently lower than actual values of a time series is called
Tracking Signal
Error
Bias
Deviation
Sales of bicycle at the NBM stores in Bandung over the past 4 months have been 100, 110, 120, and 130 units. What is the forecast of bicycle using four months moving average forecast for next month.
(a)
How do you think about the level of difficulty of this quiz?
Easy
Medium
Difficult
Extreme difficult
The objective of inventory management is to balance inventory investment and customer services
True
False
The function of inventory is to couple various parts of the production process
True
False
Managing inventory includes the following aspects
How inventory items can be classified
How accurate inventory records can be maintained
How inventory can be minimized
How inventory can be stored
ABC analysis divides inventory based on volume
True
False
Items are counted and records updated on a periodic basis
Record accuracy
ABC analysis
Cycle counting
Inventory counting
Holding costs vary considerably depending on the business, location, and interest rates
True
False
Calculate the number of item A counted per day
25
29
23
30
Assumption of basic EOQ model, except
Lead time constant
Quantity discounts are possible
Receipt of inventory is instantaneous
Demand is known
Calculate quantity of order
150
244.9
250
200
Calculate total cost of inventory
200
100
50
125
Safety stock is used to achieve the desired service level and avoid stockout
True
False
An inventory model for single used items is called
Fixed period model
Periodic review model
Probabilistic model
Single period model